Power Boards / Undertakings / PSU Closing in 0 days TDR #46049286

Tender For Running Contract For All Om Network Work In Assistant Executive Engineer Om Rural Mannargudi Sub Division

Issued by Boards / Undertakings / PSU · mannargudi, Tamil Nadu
Tender Value
10 Lakhs
Estimated cost
Bid Submission
11 Nov 2024
0 days left
EMD
10000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
mannargudi → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Running Contract For All Om Network Work In Assistant Executive Engineer Om Rural Mannargudi Sub Division

BOQ

Name of Work: Running Contract for All OM Network work in Assistant Executive EngineerOMRuralMannargudi Sub Division
Sl. No. Item Description
1Running Contract for All OM Network work in Assistant Executive EngineerOMRuralMannargudi Sub Division
2Excavation of Pole pit of size 2\"x2\"x1/6 of the height of the pole upto 8 mtr pole by using JCB or Manual
3Excavation of Pole pit of size 2\"x2\"x1/6\" of the height of the pole for 9 mtr/Square pole by using JCB or Manual
4Excavation of RSJ/Rail/tubular pole pit above 9.0 M by using JCB or manual
5Excavation of pit in Hard rock place which requires blasting
6Excavation of pit in Hard rock place which does not requires blasting (Where Houses are located)
7Excavation of Stay pit 2\"x2\"x5\" depth by using JCB or manual
8Erection of RCC poles/PSC poles/Metal poles up to 8.00 M (27\") by using JCB or manual
9Erection of RCC poles/PSC poles/Metal poles 9.0 M by using JCB or manual
10Erection of RSJ, Rail and fabricated poles above 9.0 M by using JCB or manual
11Erection of stay set complete
12Fixing of HT \"V\" cross arms (all types) / channel cross arms / guarding Cross arms
13Fixing of LT 3 phase cross arms
14Fixing of LT Single phase cross arms
15Fixing of HT / LT TI Fittings
16Fixing of HT pin Insulators 11 KV / 22 KV / 33 KV
17Fixing of HT 11 KV strain disc.
18Fixing of HT 22 KV / 33 KV strain disc
19Fixing of LT pin Insulator
20Fixing of LT shackle
21Fixing of Aluminium Knob
22Earthing of pole with pin including looping binding and burying
23Earthing of additional Cross arm
24Fixing of top channel 10\" centre
25Fixing of top channel 15\" centre
26Fixing of bed channel
27Fixing of centre support for bed channel
28Fixing of belting angle
29Erection of 11 KV AB Switch with PT insulators(Complete)
30Erection of 11 KV HG Fuse set
31Erection of 11 KV Solid core HG Fuse set
32Feeder arrangements with open type fuse units Per DT
33Fixing of HT LAS
34Fixing of LT LAS
35HT Jumpering complete for Transformer DT Structure
36HT Jumpering complete for DP Structure
37Fixing of cross bracing (4 nos angles) 10\" Centre
38Fixing of cross bracing (4 nos angles) 15\" Centre
39Fixing of danger board
40Erection of Transformer centre set arrangments
41Fixing of Distribution Transformer Name Board (Name of the 22 / 11 KV #, Name of the SS and Capacity) including Supply of board (1\" x 1.5\" x 3 mm thickness) including the cost of paint and labour charges
42Fixing of Earth coller for earth pits
43Erection of aluminium bus bar pipe complete for HT bus bar arrangements for DP structure
44Erection of aluminium bus bar pipe complete for HT bus bar arrangements for 3P & 4P structure
45Paving of Conductor, Stringing, binding, jumpering etc., complete with ACSR for lines with DOG conductor
46Paving of Conductor, Stringing, binding, jumpering etc., complete with ACSR for lines with 7/4.09 mm
47Paving of Conductor, Stringing, binding, jumpering etc., complete with ACSR for lines with 7/3.35 mm ACSR or 7/3.15 mm AAAC
48Paving of Conductor, Stringing, binding, jumpering etc., complete with ACSR for lines with 7/2.59 mm or 7/ 2.50 mm
49Numbering of pole by using Enamel paint including cost of paint and painting charges (150 diameter with 2.5\" height letters or100x150 mm with 2.5\" letters)
50Painting of Cement Poles by using Distemper paint (Single Coat)
51Painting of Metal Poles by using Aluminium paint (Single Coat)
52Painting of top channel
53Painting of AB switch
54Painting cross Bracing set (4 Nos. Angles) both 10\" & 15\" centre
55Painting of Transformer (only one coat) upto 100 KVA
56Painting of Transformer (only one coat) above 100 KVA
57Painting of HG fuse set.
58Painting of HT metering set and Box
59Painting of poles and all other metal parts while erecting new DT Structure
60Painting of poles and all other metal parts while erecting D.P Structure
61Painting of pole and all other metal parts while erecting new single pole distribution transformer Structure
62Structure Concreting, Concreting of poles with size (2\"x2\"x5\") including cost of Cement, jelly and Sand with a mixture of 1:3:6 and plastering of concrete with ratio 1:2
63Sleeve concreting with size (2\"x2\"x3\") including cost of excavation Cement, jelly and Sand with a mixture of 1:3:6 and plastering of concrete with ratio 1:2 including materials
64Stay concreting of Stay with Size 1.5\"X 1.5\"X 3.0\" including cost of 40 mm Cement, Jelly and sand (with supply) with mixture 1:3:6 along sleeve concreting and plastering of concrete portion above the ground level with ratio 1:2
65LT split neutral guarding
66Flat guarding including fixing of 2 Nos. cross arms HT LT
67Guarding for D.O.T. Crossing
68Guarding for Railway Crossing (cradle guarding).
69Loading, Unloading and Transporting of Materials Below 8 Kms
70Loading, Unloading and Transporting of Materials Above 8 Kms. For additional Km
71Loading of poles up to 27\" RCC / PSC / Metal poles
72Loading of poles 30\" RCC / PSC poles and RSJ Pole of all sizes
73Unloading of poles upto 27\"
74Unloading of poles upto 30\"
75Loading of cement bag of 50 Kg.
76Unloading of cement bag of 50 Kg.
77Loading of Transformer oil drum with oil 200 Lit. capacity
78Unloading of Transformer oil drum with oil 200 Lit. capacity
79Loading of materials
80Un-Loading of Materials
81Loading and Stacking of Materials
82Transporting of poles from road side to pole pit Location including loading and unloading of poles by using JCB or Manual Up to 200 m
83Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual above 200 m
84Loading or unloading of Transformer upto 200 KVA and Metering set
85Loading or unloading of Transformer above 200 KVA
86Erection of Transformer upto 200 KVA including connections
87Erection of New Transformer above 200 KVA including connections
88Loading/Unloading/Erection of HT Metering set including connections
89Re-sagging of HT line with ACSR 7/4.72 mm Conductor
90Re-sagging of HT / LT line with ACSR 7/4.09 mm Conductor
91Re-sagging of HT / LT line with ACSR 7/3.35 mm or AAAC 7/3.15 mm conductor
92Re-sagging of HT / LT with ACSR 7/2.59mm or AAAC 7/2.50 mm conductor
93Erection of street light including fixture fitting
94Erection of street light service
95Fixing of new SV/MV/LED lamp fittings
96Assisting for survey of HT/LT
97Hut service fixing
98Agricultural service fixing / service
99Breaking and Releasing of grills from RCC/PSC poles
100Releasing of single phase service wire and re-fixing.
101Releasing of 3 phase service wire and (upto 50 HP) re-fixing
102Releasing of 3 phase service wire and (above 50 HP) re-fixing
103Labour charges for alteration of Back clamps to suit for the works
104Labour charges for alteration of Stay clamps to suit for the works
105Fixing of Double Channel X arm/ Double \"V\" cross arm
106Erection of new earth pipe by replacing the corroded earth pipe including burying, looping and binding
107Providing LT bus bar arrangement in distn. Trs. Structure location
108Fixing of meter on LV side of DT
109Earthing of new double pole distribution transformer structure complete
110Erection of 3 nos new 10\" Earth pipe replacing the corroded earth pipe and renewal of earthing including burying looping and binding
111Earthing of D.P.Structure complete
112Erection of concrete earth tub to DistributionTransformer earth pipe
113Dismantling of detoriated cables / Replacement of various size (120, 240 Sq.mm) from Distribution Transformer LT bushing to LT open type clamp and provision of suitable lugs at both the ends
114Dismantling of Distn. Transformer from structure Transporting to special Maintenance up to 8 Kms
115Dismantling of Distn. Transformer from structure Transporting to special Maintenance above 8 Kms per km
116Releasing of ACSR / AAAC conductors from conductor drum and coiling ACSR 7 / 3.35, 7/2.59, AAAC 7/2.50, 7/3.15 MM (Per/Km)
117Tiding of service connection with erection of clamp jumper in Low tension single phase SC/line, Aerial Board, Fuse unit and looping
118Tiding of service connection with erection of clamp jumper in Low tension three phase line, Aerial Board, Fuse unit and looping
119Renewal of jumper from 22/11 KV line to AB switch to HG Fuse, HG Fuse to Distn. Transformer with PG clamps
120Cutting of coconut leaves / tree branches
121Drilling of hole in channel only 3/4\" & 1\" perhole
122Cutting of flat
123Cutting of channel
124Cutting of Angle
125Cutting of pipe
126RSJ pole cutting
127RSJ pole welding
128Providing of line spacers for single phase line
129Providing of line spacers for three phase line
130Hiring Charges for JCB
131Clearing of Jungle
132Clearing of scrup in Yard (DT/SS)
133Set right the leaning of pole in HT/LT in Pin point
134Set right the leaning of pole in HT/LT in Cut point
135Erection of LT Shunt Capacitor
136Ground patrolling of HT lines during Breakdown
137Rectification of snapped HT line during Breakdown
138Rectification of snapped LT line during Breakdown
139Erection of Single phase meters
140Erection of Three phase meters
141Monthly Maintainenance of Distribution Transformer Yard and earth pits neat and tidy, Cleaning the entire transformer including the bushings, Checking for oil level and reporting if the level is below the mark, Checking the earth connections and watering theearth pits, Checking the oil leaks and reporting if any noticed, Reconditioning the breather (by reactivating Silicagel or replacing it if necessary) and Checking the LT fuses and renewing them if necessary
142Quarterly Maintenance of Distribution Transformer- Renewing the HG fuses
143Quarterly Maintenance of Distribution Transformer- Measuring the insulation resistance and Load currents
144Annual Maintenance of DT - Lubricating the AB switches and checking their operation, Checking the lines and earth connections of AB switch, Checking the lines and earth connections of HT and LT lightning arresters and Checking the HV and LV bushing connections
145Complete maintenance of Power Transformer of all capacities in SS
146Complete maintenance of Breaker, CT/PT for 110 KV and above in SS
147Complete maintenance of Breaker, CT/PT for capacity less than 110 KV in SS
148Complete maintenance of Centre Rotating Switch 110 KV and above in SS
149Complete maintenance of Centre Rotating Switch below 110 KV in SS
150Replacement of Clamps of all sizes in SS
151Complete maintenance of LAS 110 KV and above in SS
152Complete maintenance of LAS below 110 KV in SS
153Replacement of Jumpers less than 1 metre in SS
154Replacement of Jumpers more than 1 metre in SS
155Maintenance of earth pits and watering in SS
156Cleaning of control and relay panels (Front, Back and inside) in SS
157Mainenance of Capacitor Bank cell in SS
158Replacement of capacitor bank cell in SS
159Replacement of PT Insulator in SS
160Replacement of Female/Male contact for 110 KV in SS
161Replacement of Female/Male contact for less than 110 KV in SS
162Maintenance of Battery in SS
163Dismantling of HT \"V\" cross arms (all types) / channel cross arms / guarding Cross arms
164Dismantling of LT 3 phase cross arms
165Dismantling of LT Single phase cross arms
166Dismantling of HT / LT TI Fittings
167Dismantling of HT pin Insulators 11 KV / 22 KV / 33 KV
168Dismantling of HT 11 KV strain disc.
169Dismantling of HT 22 KV / 33 KV strain disc
170Dismantling of LT pin Insulator
171Dismantling of LT shackle
172Dismantling of Aluminium Knob
173Dismantling of Pole earthing
174Dismantling of top channel 10\" centre
175Dismantling of top channel 15\" centre
176Dismantling of bed channel
177Dismantling of centre support for bed channel
178Dismantling of belting angle
179Dismantling of 11 KV AB Switch
180Dismantling of 11 KV Vertical type AB Switch for single pole DT
181Dismantling of 11 KV HG Fuse set
182Dismantling of 11 KV Solid core HG Fuse set
183Dismantling Feeder arrangements with open type fuse units
184Dismantling of HT LAS
185Dismantling of LT LAS
186Dismantling HT Jumpering complete for Transformer DT Structure
187Dismantling HT Jumpering complete for DP Structure
188Dismantlingof cross bracing set (4 nos angles) 10\" Centre
189Dismantling of cross bracing set (4 nos angles) 15\" Centre
190Dismantlingof danger board
191Dismantling of Transformer centre set arrangments
192Dismantling of LT Cable arrangements while erecting single pole DT
193Dismantling of Earth coller for earth pits
194Dismantling of aluminium bus bar pipe complete for HT bus bar arrangements for DP structure
195Dismantling of aluminium bus bar pipe complete for HT bus bar arrangements for 3P & 4P structure
196Excavation of cable trench 0.6 meters width and 1.2 meters depth - Normal (earth road)
197Excavation of cable trench 0.6 meters width and 1.2 meters depth -Tar Road
198Excavation of cable trench 0.6 meters width and 1.2 meters depth - Concrete Road
199Loading , unloading & Transporting of 11 KV HT cable from departmental stores to work spot- 3x300 sq mm XLPE (1 drum: 200 m)
200Loading , unloading & Transportingof 11 KV HT cable from departmental stores to work spot- 3x120 sq mm XLPE (1 drum: 200 m)
201Laying of HT 300 sq mm XLPE cable
202Laying of HT 120 sq mm XLPE cable
203Covering HT cable by cement \"V\" trough after covering the cable with good loose earth includingloading, unloading and transport from stores to site and letter painting of feeding details & Cable size on the trough
204Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete.
205Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 empty drums)
206Transporting of LT Cable 240 sq.mm (1 drum - 200 meters)
207Transporting of LT Cable 120 sq.mm (1 drum - 500 meters)
208Transporting of LT Cable 25 sq.mm (1 drum - 500 meters)
209Transporting of LT Cable 16 sq.mm (1 drum - 500 meters)
210Excavation of cable trench 45 cm width and 75 cm depth - Normal Road (earth)
211Excavation of cable trench 45 cm width and 75 cm depth - Tar Road
212Excavation of cable trench 45 cm width and 75 cm depth - Concrete Road
213Laying of LT 240 sq.mm cable
214Laying of LT 120 sq.mm cable
215Laying of LT 25 sq.mm cable
216Laying of LT 16 sq.mm cable
217Laying of cable using Trenchless technique with scanner without pipes upto 50 mt LT/11 KV/33 KV single run
218Laying of cable using Trenchless technique with scanner without pipes above 50 mt LT/11 KV/33 KV single run
219Erection of Mini pillar boxes for 3 feet
220Erection of 4/6/8 way pillar box 3 feet
221Erection of 4/6/8 way pillar box 4 feet
222Cleaning, painting with Aluminium paint 2 coats 8 way pillar box
223Cleaning, painting with Aluminium paint 2 coats 6 way pillar box
224Cleaning, painting with Aluminium paint 2 coats 4 way pillar box
225Cleaning, painti.ng with Aluminium paint 2 coats Mini way pillar box
226Dismantling of old 4/6/8 way pillar box
227Dismantling of old Mini pillar box
228Maintenance of 8 way pillar box
229Maintenance of 6 way pillar box
230Maintenance of 4 way pillar box
231Maintenance of Mini pillar box
232Earthing of 8/6/4 and Mini pillar boxes
23311 KV 120/300 sqmm Indoor/Outdoor termination works
23433 KV 1x630 sqmm Indoor/Outdoor termination works
23533 KV 3x400/3x630 sqmm Indoor/Outdoor termination works
236Charges for 11KVJoints
237Chargesfor 33 KV(1X630Sqmm) Joints
238Charges for 33 KV(3x400Sqmm) Joints
239Loading and unloading of Distribution Transformer at site and store
240Transporting of DT Upto 100 KVA using TATA ACE or Equivalent Vehicle
241Transporting of DT Above 100 KVA using Eicher 407E or Equivalent Vehicle
242Painting of two coats of Aluminium paints for Transformers structure and iron materials including cost of paint and painting of structure pole with distemper including cost of materials etc.
243Name plate painting and lettering of transformer details including cost of materials and labour
244Labour Charges and fixing of meter on LV Side of DT
245DT Metering Works, Test Terminal Box, fuses for PT, Cables (For CT, PT and Neutral Connections), metallic hose for hosing cable from DT to Meter Box, Hylem Sheet terminal of adequate thickness to hold CT coils Ferrules, Lugs, Screws, etc
246Erection of Tapping channel 5 \" size
247Erection of Single Phase spacers & jumpers
248Erection of Single Phase spacers & jumpers
249Provision of Paa Jumpers
250Metering set loading and unloading
251Loading & Unloading of 7.5/8 meters pole (RCC/PSC)/Each
252Loading & Unloading of 9.14 meters pole RCC /9.0 mtr PSC/9.14 RSJ /Each
253Loading of Conductor drum of all sizes with conductor
254Loading of Conductor drum of all sizes without conductor
255Unloading of Conductor drum of all sizes with conductor
256Unloading of Conductor drum of all sizes without conductor
257Loading & unloading oil drums (with Oil)
258Loading & unloading of drums (without oil)
259Loading of Materials
260unloading of materials
261Loading of 9 mtr Square RCC Pole
262Unloading of 9 mtr Square RCC Pole
263Labour and transporting of 9 mtr RCC Square pole upto 5 KMs
264Excavation of Square Polepit per size 3\"x 3\"x6\" for single pole Dt structure
265Erection of 9 mtr Square RCCpoleincluding base plate
266Excavation ofstay pit per size 2\"x 2\"x6\" for Single Pole DT structure
267Erection ofstaysetfor Single Pole DT structure
268Erection of Transformer centre set arrangments
269Earthing of SP Pole structure complete set with 3Nos earth pits excavation including providing 3nos earthpipe of size 40mmx3mtr(GI Pipe), pit size 2\"x2\"x2\" filled with mixture of sand, charcoal and common salt in equal proportion to to depth of 1.25\" and 1\"jelly to a depth of 9\", earth connection to be provided with GI wire, plates and bolts and Nuts.(Except 3 Nos earth pipe with GI wire, plates and bolts and nuts all other materials to be supplied by Contractor)
270Erection ofTransformer structure materials including transporting from road side to work spot per set for Single Pole DT structure
271Erection of SP Pole DT 11 KV AB Switch set including transporting from roadside to work spot
272Erection of SP Pole DT HG Fuse set including transporting from road side to work spot. Per set
273Mass concreting of SP pole DT with 1;4:8 mix 1/2 broken metal jelly, cement and river sand including coping. (Size height of pole).(as per civil rate) all materials will be supplied by contractor.(Including DT Support pole)
274Painting of SP Pole Transformer structure including cost of paint , brush etc., (1.one coat of red oxide paint in all iron materials, 2.colour washing of 2nos structure poles, 3.painting of transformers, and all iron items with aluminium paint)
275Erection LT Open Type fuse unit for SP Structure
276Fixing of LT Cable arrangements while erecting single pole DT
277Transporting of line materials from office to work spot

AI Tender Summary

OUR REF NO 46049286
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 10 Lakhs
LAST DATE 11-11-2024
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Running Contract For All Om Network Work In Assistant Executive Engineer Om Rural Mannargudi Sub Division
Basic Detail
Tender No ET-15/24-25
Bidding Type Tender
Location
City mannargudi
State Tamil Nadu
Key Dates
Publish Date 05 Nov 2024
Submission Date 11 Nov 2024
Open Date 12 Nov 2024
Finance
Tender Value 10 Lakhs
Tender Fee Ref. Documents
EMD 10000
Exemption Available
Document List
fe46d29c-3fa4-420b-83b5-f5e1988f5927.html
BOQ_593006.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 05, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 11, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 12, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

fe46d29c-3fa4-420b-83b5-f5e1988f5927.html

xls

BOQ_593006.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders