|
| 1 | 1.Providing New open well Sreening wall and pump Room Near PWDEri Noothapur H/O Noothapur Pt.Geophysical survey charges including conveyance charges for the Geo-physical instruments and other accessories. |
| 2 | Earth work open well excavation complying with relevant clausesof TNDSS well sinking and with a lead up to 10m in hard stiff clay stiff black hard red earth, Shales, Murrams, Gravel stoney earth and mixed with small size bolders and hard gravelley soil etc., |
| 3 | Ist depth from 0.00m to 2.00 m |
| 4 | IInd depth from 2.00m to 3.00 m |
| 5 | Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in soft disintegrated rock, laterite, soft rock or kanakar not requring blasting etc complete…. |
| 6 | IInd depth from 3.00m to 4.00 m |
| 7 | Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in medium rock and dense medium rock not requring blasting etc complete… |
| 8 | IInd depth from 4.000m to 6.00 m |
| 9 | Earth work open well excavation complying with relevant clausesof TNDSS well sinking and with a lead up to 10m in medium rock and dense medium rock requring blasting etc complete… |
| 10 | IVth depth from 6.00m to 8.00 m |
| 11 | Vth depth from 8.00m to 10.00 m |
| 12 | Earth work open well excavation complying with relevant clausesof TNDSS well sinking and with a lead up to 10m inrock granite in solid including blasting Stacking etc complete… |
| 13 | 6th depth from 10.00m to 12.00 m |
| 14 | 7th depth from 12.00m to 14.00 m |
| 15 | 8th depth from 14.00m to 16.00 m |
| 16 | Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Hard granite measured in soiled requring includingblasting etc complete… |
| 17 | 9th depth from 16.00m to 18.00 m |
| 18 | P.C.C 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance to site and all labour charges etc ., complete. |
| 19 | Supplying and erection centering for sides and soffits inculding necessary supports and structingfor plain surfaces such as RCC Slab,Lintel,Below ground level |
| 20 | Supplying and Fabricating of steel and placing in position mild steel (or) Tor steel for all reinforced cement concrete works as per the design given including cost and conveyance to site and all labour charges etc ., complete. |
| 21 | Reinforced cement concrete 1:11/2:3 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. For 10 cum. |
| 22 | Earth work excavation and deposting on bank with intial lead and lift in stiff clay black cotton soils and ordinary gravely soil etc complete 36.72 cum 224.10 8228.95 |
| 23 | P.C.C 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance to site and all labour charges etc ., complete. |
| 24 | Collection and supply of M.sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for filling as per standard speecifications |
| 25 | Random rubble Mansonry in cement mortar 1:5 mix using conveyance of all materials to site and all labour charges etc complete |
| 26 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\" and conveyance of all materials to site and all labour charges etc complete |
| 27 | RCC in C.C.1:11/2:3 mix using 20mm ISS HBG Metal including cost and conveyance of all materialsto site andall labours etc., complete |
| 28 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site andall labours etc., complete |
| 29 | Towards centering charges including of all materials and labour charges etc., complete as per standared specification Column |
| 30 | Platering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc., complete |
| 31 | Platering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete |
| 32 | Platering Granolethic Floor Cement Concrete 1:2:4 Mix using 10-12mm ISS Metal to 25mm thick including cost and conveyance of all materials to site and all labour charges etc., complete |
| 33 | Supply and fixing of MS door of size 1.00x2.00m MS angle 50x50x4mm and MS flat 35x6mm with MS sheet of 18 gange including |
| 34 | Distempering two coats using OLD or NEW Plastered surface using Oil Bound Distemperincluding cost and all Labour charges etc., complete |
| 35 | Colour Whasing two coats with approved cement paint for the cement plasteringincluding cost and all Labour charges etc., complete |
| 36 | Name Board |
| 37 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |