| 1 | Supplying and laying Turf Reinforcement Mat as per IRC-56, complete and within all leads and lifts of materialshauling/ carrige materials and labour equipment to various location through all modes of transportation in all respect and as per direction of Engineer-in- charge.and as per direction of Engineer-in- charge.The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but excluding GST. |
| 2 | Supplying and laying Double Twisted Wire Mesh as per IS: 16014, complete within all leads and lifts of materialshauling/ carrige materials and labour equipment to various location through all modes of transportation in all respect and as per direction of Engineer-in- charge.and as per direction of Engineer-in- charge.The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but excluding GST. |
| 3 | Supply and Installation of Flexible Earth Percussion Anchors with three- part system consisting of Anchor head with material composition of Zinc- aluminium alloy ZA-2 to resist corrosion and a self-locking and tension- able load bearing plate made up of Zinc Alloy ZA-2 or any other corrosion resistant material and connected by wire rope tendon of 3mm dia which shall be Zinc Aluminium coated and a ferrule including all accessories complete wwithin all leads and lifts of materialshauling/ carrige materials and labour equipment to various location through all modes of transportation in all respect and as per direction of Engineer-in- charge.and as per direction of Engineer-in- charge.The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but excluding GST. |
| 4 | Excavation in soil in hilly area by manual means including cutting and trimming of side slopes and disposing of excavated earth with all leads & lifts ,as per drawing and technical specification clause1603.1.1 .All useful materials, such as stones, shingles, aggregate and slates shall be sorted out and stacked along the road sides to the maximum possible extent in all leads and lifts through all modes of transportation. Any loss to the public and private property during the course of execution or disposal of serviceable and un-serviceable materials which shall be absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including hauling / carriage of materials and labour equipments to various location through all modes of transportations with in all leads and lifts of materials and as per direction of Engineer-In -Charge. |
| 5 | Earth work in excavation in structure in heights and depths in all kind of soil comprising of pick,jumper and blasting work ( both in soft and hard rock ) with chiselling / wedging out of rock ( where blasting is prohibited ) and their intermediate classification of soil.If water is met due to stream flow,seepage,rain and other causes, it shall be removed by suitable diversion,pumping and bailing out and dewatering,the excavation shall be kept dry wherever so required by the contractor at his own cost,including dressing of slopes and beds,setting out conforming to required lines,grades,side slopesas shown in the drawing and as per direction of Engineer-In-Charge and transportation of soil to road way and then disposing of surplus excavated earth in acquired width of road or on approved dumping sited including its stacking ,levellingand dressing in all leads and lifts through allmodes of transportation including head load ,animal loads or mechanical means or other incidentals to complete the work as per technical specification clause 305. All useful material,such as stones,shingles,aggregate and slates shall be sorted out and stacking along the road side to the maximum possible extent in all leads and lifts through all mode of transportation.Any loss to the public and private during the course of execution or disposal of serviceable and un-serviceable material which shall be absolute responsibilityof the contractorand shall have to be duly compensated by him in all respect including hauling / carriage of materials and labour equipments to various location through all modes of transportations with in all leads and lifts of materials and as per direction of Engineer-In -Charge. |
| 6 | Providing and laying concrete for plain /reinforced concrete in open foundations complete as per drawing and technical specification secton 800 and 1200 in plain cement concrete1:4:8 (One cement : four sand : eight graded stone aggregate 40 mm (Fortymillimetre ) nominal size and curing complete including the cost of form work complete , including hauling/ carriage of materials, labour and equipments to various location through all modes of transportationwithin all leads and liftsand as per direction of Engineer-in- charge.The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but excluding GST. |
| 7 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications section 800 and 1200 Plain cement concrete grade M-10 ( nominal mix in cement concrete 1:3:6(Onecement : Three sand : six graded stone aggregate 40mm (Forty millimetre ) nominal size ) and curring complete including the cost of form work, including hauling/carriageof materials and labour equipment to various location through all modes of transportation within all leads and lifts of materials and as per direction of Engineer-in-charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but excluding GST. |
| 8 | Random rubble masonry in cement mortar 1:6 (One cement : Six sand) for sub structurecomplete as per drawing and technical specifications section 700 & 1200 includinghauling/ carrige ofmaterials , labour equipment to various location through all modes of transportation within all leads and liftsand as per direction of Engineer-in- charge.The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but excluding GST. |
| 9 | Providing and layingrubble flooring as per drawing and technical specification clause 1303 including hauling/ carriageof materials and labour equipment to various location through all modes of transportation within all leads and lifts of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but excluding GST. |
| 10 | Providing and laying reinforced concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2(One cement :Two sand ) but excluding excavation, protection work, back filling, concrete and masonry work in head walls and parapets as per technical specificationclause 1101 with pipe of900mm (Nine hundred millimetre )dia complete in all respect including hauling/carriageof materials and labour equipment to various location through all modes of transportation within all leads and lifts of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but excluding GST. |
| 11 | Back filling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1206.3 and 1604.7 with granular material including hauling/ carriageof materials and labour equipment to various location through all modes of transportation within all leads and lifts of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but excluding GST. |
| 12 | Providing weep holes in brick masonry /stone masonary/ plain reinforced concrete abutment,wing wall,returen wall with of 100 mm (one hundred milimetre) dia PVC pipe extendingthrough the full width of the structure with slope of1( v):20( H) towards draining face complete as per drawing and technical specifications clauses 614,709,1204.37 including hauling/ carriageof materials and labour equipment to various location through all modes of transportation within all leads and lifts of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but excluding GST. |