| 1 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: |
| 2 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 3 | Welding by gas or electric plant including transportation of plant at site etc. complete. |
| 4 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 5 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 6 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete. |
| 7 | On steel work |
| 8 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. |
| 9 | Nominal concrete 1:3:6 or richer mix (including equivalent design mix) |
| 10 | Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: |
| 11 | Channels, angles, tees and flats |
| 12 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. |
| 13 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (Note: Old MS sections would be provided by the department free of cost) |
| 14 | Taking out MS gates ofapproximate size 7.5m height and 5.5m width frame and also refixing both old/new MS gates as per site requirement with Hydra machine etc all complete as per directions of Engineer-In-charge. |
| 15 | Credit to work on A/c of dismantled unserviceable MS angles/ channels etci/c carriage to market all complete as per directions of Engineer-in-charge. |
| 16 | Diversion of waterby supplying and stacking of earth filled in used Jute/HDPE bags in or above water duly sewed with sutly and placed in position complete and also removing them from site after completion of work etc complete as per direction of Engineer-in-charge. (Average weight of filled bags shall not be less than 37 kg) |