| 1 | Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401. |
| 2 | Providing and laying WMM (Wet Mix Macadam) of specified on the prepared sub base with graded stone aggregate and granular material of quality size and grading pasting in layor with motor grader and compaction with vibratory rollers of 80-100 KN static weight and fine dressing for required grade and cross slope as shown on the drawing equipments equipments safety measures testing and incidents necessary to complete the work as per MORTH 406 |
| 3 | Providing and laying Prime Coat over the Wet Mix Macadam surface using 7 Kg of SS1 Grade Emulsion bitumen for 10 Sq.m including cost of Emulsion bitumen which will be supplied by the contractor himself at his own cost as per special condition including cost and conveyance to site handling charges including labour charges for brushing,cleaning and preparing the surface for Applyinging the tack coat and labour for applying and required quantity of bitumen binder as tack coat by bitumen sprayer including hire and fuel charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc., completed Complying with Standard Specification as per Clause 503 MORTH Specification. |
| 4 | Providing and laying Tack Coat over the Wet Mix Macadam surface using 2.50 Kg of RS1 Grade Emulsion bitumen for 10 Sq.m including cost of Emulsion bitumen which will be supplied by the contractor himself at his own cost as per special condition including cost and conveyance to site handling charges including labour charges for brushing,cleaning and preparing the surface for Applyinging the tack coat and labour for applying and required quantity of bitumen binder as tack coat by bitumen sprayer including hire and fuel charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc., completed Complying with Standard Specification as per Clause 503 MORTH Specification. |
| 5 | Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30 bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mixuniform thickness of 50mm with paver to the specified grade and cross sections and compaction byvibratory/ pneumapic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel chargesfor 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumapic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as clause 505MORTH Rev-5. |
| 6 | Providing and layingBituminous concrete to 40mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and below with 50.30 kgs of VG 30 /VG 40 bitumenfor 10m2including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 30 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30tCMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5Rev-5. |
| 7 | Collection,supply and filling of Well Gravel in layers of not more than 15cm thickincluding allcost and conveyance of Gravel from the approved quarry to the work site and stacking them to departmental gauge for pre measurement including labourcharges for spreadingand all other incidental charges etc, complete complying as per clause 401 MORTH specification. |
| 8 | Providing and Laying of Hot Applied Thermo Plastic Compound 2.5 mm Thick Inculding Reflectorising Glass Beads @250 GmsPer Sqm area, Thickness of 2.5mm Exculsive of Surface applied Glass Beads asper IRC 35 The Funished Surface to be Level Uniform and Free From Streaks and Holes etc Complete ., |
| 9 | Clearing and Grubbing by LightJungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per MORTH Specification 111, 112, 201. |
| 10 | Upkeeping 1st year (50%) |
| 11 | Upkeeping 2nd year (60%) |
| 12 | Upkeeping 3rd year (60%) |
| 13 | Upkeeping 4th year (60%) |
| 14 | Upkeeping 5th year (60%) |
| 15 | Earth Work excavating and deposting on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay, Stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS20A for making up the berms. as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision [Twice in a year] |
| 16 | Upkeeping for 1st year (40%) |
| 17 | Upkeeping for 2nd year (40%) |
| 18 | Upkeeping for 3rd year (40%) |
| 19 | Upkeeping for 4th year (40%) |
| 20 | Upkeeping for 5th year (40%) |
| 21 | Tack coat- Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg/sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per clause 503 |
| 22 | 4 th year 3% |
| 23 | 5 th year 5% |
| 24 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading themix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M,Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 |
| 25 | 4 th year 3% |
| 26 | 5 th year 5% |