}

Bids Are Invited For Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Work Boat 507; Ha 1001Hoist The Boat Making Sure That Bearing Surfaces Are Adequately Cushioned Docking Duration 07 Days; Service Provider , Repair, , Andaman-Andaman And Nicobar Islands

Ministry Of Defence has published Bids Are Invited For Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Work Boat 507; Ha 1001Hoist The Boat Making Sure That Bearing Surfaces Are Adequately Cushioned Docking Duration 07 Days; Service Provider , Repair, . Submission Date for this Tender is 12-11-2024. Commercial Marine Vehicle Tenders in Andaman Andaman And Nicobar Islands. Bidders can get complete Tender details and download the document.




Tender Notice

45971226
Bids Are Invited For Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Work Boat 507; Ha 1001Hoist The Boat Making Sure That Bearing Surfaces Are Adequately Cushioned Docking Duration 07 Days; Service Provider , Repair,
Tender
Indian
Andaman And Nicobar Islands
Andaman
12-11-2024

Tender Details

Bids Are Invited For Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HA 1001Hoist the boat making sure that bearing surfaces are adequately cushioned Docking duration 07 days; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HA 1002 Clean the marine growth with wooden scrapper; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA 1003 Wash the underwater area with fresh water rub with grade 220 emery papers and smoothen the surfaces; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HA 1004 Clean with mild detergent in fresh water Inspect for cracks and peeling of gel coat Repair if necessary; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HA 1005 Touch up the antifouling paint as per paint scheme Paint Yard Supply; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HA 1006 Clean all sea suction scoops and inspect for cracks; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HA 1007 Clean the marine growth of shaft Propeller and Rudder; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HA 1008 Measure and record the clearance of stern tube and P bracket bushes Rudder and Rudder jumping collar; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HA 1009 Overhauling and pressure testing of the underwater valves and cocks including painting of valvesall material and spares yard supply i GS Pump .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT HA 1009 iii Marine Toilet Sea suction Ball VV 25NB Qty01 iv Main Engine Sea suction Ball VV 50 NB Qty02 v DG Sea suction Ball VV25 NB Qty01 .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HA 1009 DG Overboard Swing Check VV 50 NB Qty01 viii Fire pump Overboard SDNR VV 40 NB Qty01; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HA 1010 Clean the bilges and thoroughly inspect the structure to Main engine foundation Supports for distortion cracks and delamination; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HA 1011 Check the tightness of foundation bolts of all auxiliary machineries; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HA 1012 Marine Toilet Remove and clean all flexible pipes and refit with new clipsHand pumpsuction and discharge valve to be overhauledMake JABSCOModelCMP.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HB 1013 Dfender Crack and deterioration observed at Dfenders at various places to be renewed as per sampleLegth approx10 MtrEBD type rubber fender 75x75x.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HB 1014 Cleaning and painting of bilges of following compartment to be carried out as per paint schemePaint yard supply i Engine Room 148 SqmApprox .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HB 1015 Wheel House sofa Rexine is deteriorated and tear off at various places to be renewed as per samplelength 03 mtrheight and breadth 05 mtr each; Ser.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HB 1016 Wheel House Sofa and sitting area seat cover to be changed as per sample Length03 mtrheight and breadth 05 mtr eachQty02; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HB 1017 Wheel House Sofa and sitting area Floor Mat is damaged To be renewed as per sample Area 12 SQm Mat PVC VINYL; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HB 1018 Wheel House Wash Basin Tap leaking drain pipe choked pipe to be chemically clean and tap to be reneweddia of pipe40mmMaterial MS Tap materialSS; S.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HB 1019 Wheel House rear window sun light protection film shading screen tear off at amny places to be replaced as per sample Area20 Sqm; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HB 1020 A wooden locker at crew cabin broken Hinges securing holes inlarge Locker to be repaired and sunmica sheet to be renewed Size1mtrx1mtrx05 mtr; Ser.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HB 1021 Ingress of rain water observed in bridge Crew cabin Engine room and pump room through window beeding Wire gland and securing bolt of stanchion ren.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; HB 1022 Anchor and chain cable to be chip and clean and paint with two coats of anti corosive paint Make SEA Links Weight50 Kg Cable Length10 Mtr Dia10mm .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EA 3001 Gear oil cooler to be chemically claeneed and pressure tested In wau job include renewal of gasketO rings and 02 nos sacrificial anode TP 15 barQt.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EA 3002 AC sea water pump to be overhauled and proved for satisfactory operation Jobs include renewal of bearings Mechanicalseal and impeller MakeCrompton.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EA 3003 Checks all cooling coils for cleaniness and corrosion If the coils are dirty Clean with water sparay Soap solution and nylon brush and carryout pr.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EA 3004 Fire Fighting system ModelNOVEC 1230 Following jobs to be undertaken in yearly routine a Check Manual operation b Calibrate all pressure d.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EA 3005 ollowing sea water syatem valve to be removed overhaulked and pressure tested All material and spares Yard supply a Bilge syatem valve 40 NB T.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EA 3005 iremain Valve 40 NB TypeSDNR Qty01 d Firemain Valve 40 NB TypeBall Valve Qty03 e Firemain Hydrant Valve 40 NB Qty03 f Fuel System.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EA 3005 g Fresh water system Valve 25 NB TypeBall Valve Qty04 h AC system Valve 25 NB TypeBall Valve Qty02 j Shaft Cooling Valve 15 NB Type Ball .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EA 3006 Fresh water tank to be cleaned with liquid detergent Renew Man hole cover gasket; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EA 3007 Fuel Oil tank to be cleaned inspect and paint the as per paint scheme Paint Yard Supply Renew Manhole Cover gasket; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EA 3008 Fire Pump ot be overhauled and proved for satisfactory operation All spares and material yard supply Make CEM Model AM 512A; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EA 3009 Bilge pump to be overhauled and proved for satisfactory operation All spares and material yard supply Make CEM Model AM 512A; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EB 3010 Fresh water pump is not developing sufficient pressure Suspect excessive clearence between pump and impeller Pump to be overhauled and proved for.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EB 3011 Quick Shutt off valve cover of firemain syatem broken to be fabricated as per sample Material FRP Sheet Saize04x08x12 inches; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EB 3012 Securing Clamps of Sw Fw and fuel syatem coroded and deteriorated to be renewed as per sample a Dia12 inches Qty06 MaterialSS b Dia10 inch.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments Version 2) - WORK BOAT 507; EB 3012 c Dia08 inches Qty08 MaterialSS d Dia06 inches Qty08 MaterialSS e Dia04 inches Qty12 MaterialSS Dia02 inches Qty10 MaterialSS; Service.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; EB 3013 04 nos gland bush stud of port and stbd shafting thread wornout Stud to be fabricated and fitted as per sample Dia14 mm Length72 mm MaterailSS; Se.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; LA 5001 Engine Room supply fans with motors 02 Nos to be overhaul and bearings to be replace Make CEM Model VE35230M; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; LA 5002 05 in no Battery Charger to be overhauled and proved for satisfactory operation all spares and material yard supply MakeVICTRON ENERGY ModelBLUE S.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; LA 5003 Window Wiper Overhaul the window wiper motor and gear assembly Replace bearings if required Wiper blade to be changed as per sample All spares an.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 507; LA 5004 General Lighting Replace Total Quantity :

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 16.90 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail