|
| 1 | EXCAVATION OF POLE PITS / Stay Set: |
| 2 | Excavation of Pole pits for pole upto 8.00mm length by using JCB/Manual |
| 3 | Excavation of Pole pits for pole above 8.00mm length by using JCB/Manual |
| 4 | Excavation of Pole pits for pole in rocky area (common to all size of poles) by blasting / Manual |
| 5 | Excavation for Stay pit 4.5\" to 5\" depth using JCB /Manual |
| 6 | Excavation & Backfillingof Stay Pit per location - Hard rock without blasting |
| 7 | Erection of REC/RCC/PSC pole upto 8.0 m length using Crane/Manual |
| 8 | Erection of REC/RCC/PSC pole above 8.0 m length using Crane/Manual |
| 9 | Erection of metal supports above 9.0m / RSJ/Rail pole/Tubular |
| 10 | Erection of Stay set complete with fixing up stay wire, Eye Bow, Guy Shackle binding etc., |
| 11 | Erection of Additional Stay in the same Stay Rod excluding excavation of Stay pit and burrial of stay rod |
| 12 | Erection of Stay set complete including excavation of Stay pit in the Rock area by blasting with fixing of Stay wire, eye, bow, Guy Shackle, Binding etc., |
| 13 | Replacement of Stay rod only (including stay pit excavtion refilling and erection) |
| 14 | Replacement of Guy shackle only in existing stay |
| 15 | Fixing of LT 3 Ph Cross Arm |
| 16 | Fixing of LT 1 Ph Cross Arm |
| 17 | Fixing of V Cross Arm 3.5 Feet |
| 18 | Fixing of V Cross Arm 4.5 Feet |
| 19 | Fixing of HT/LT TI Fitting |
| 20 | Fixing of Double Channel cross Arm |
| 21 | Fixing of Guarding X Arm |
| 22 | Fixing of Tapping channel cross Arm |
| 23 | Fixing of Two Tapping cross arm per cut point upto 33KV line including fixing of Discs, Insulators and Jumbering etc |
| 24 | Fixing of HT PIN Insulator withpin 11KV |
| 25 | Fixing of HT PIN Insulator withpin 22KV |
| 26 | Fixing of HT PIN Insulator withpin 33KV |
| 27 | Fixing of LT Pin insulator |
| 28 | Fixing of HT Strain disc 11KV |
| 29 | Fixing of HT Strain disc 22KV |
| 30 | Fixing of HT Strain disc 33KV |
| 31 | Fixing of LT Shackle with Hardwares |
| 32 | Fixing of Alumium Knob |
| 33 | Fixing of HT LAS (3 Nos) |
| 34 | Fixing of LT LAS (3 Nos) |
| 35 | Fixing of open type fuse unit arrangements |
| 36 | Providing of line spacers in LT lines 1 phase |
| 37 | Providing of line spacers in LT lines 3 phase |
| 38 | Paving and stringing of conductors of sizes upto 7/2.59mm ACSR or other equivalent conductor |
| 39 | Paving and stringing of conductors of sizes above 7/2.59mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor |
| 40 | Paving and stringing of conductors of 7/4.09 mm ACSR or other equivalent conductor |
| 41 | Resagging of lines for All sizes at cutpoint location per wire /span |
| 42 | Earthing of Poles with GI wires 4 or 6 SWG by coil earthing |
| 43 | Concreting with 1:4:8 mix using 40 mm Jelly including curing (Material + Labour) Sleeve Concreting per pole |
| 44 | Mass Concreting of poles |
| 45 | Stay Concreting |
| 46 | Erection of Distribution Transformer structure as per TNEB standard including painting, feeders arrangement, color washing of RCC Poles etc., Fixing of poles type to be unit LT/HT LAS and Jumbering 3 Nos Earth pits with earth through except erection of Distribution Transformer. (Data as per Annexure II) |
| 47 | Erection of Distribution Transformer including loading of Distribution Transformer at stores and Erection of Stucture or vice versa upto 25KVA Distribution Transformer/ Metering Set |
| 48 | (ii) Above 25 KVA to 100 KVA |
| 49 | (iii) Above 100 KVA to 250 KVA |
| 50 | (iv) 500 KVA and Above |
| 51 | (v) Failed DT replacement below 100 KVA |
| 52 | (v) Failed DT replacement 100 KVA and Above |
| 53 | Erection of 11 KV Single pole Structure including erection of DT Complete without centre support.(Data as per Annexure III) |
| 54 | Erection of 11 KV Single pole Structure including erection of DT Complete with centre support.(Data as per Annexure III) |
| 55 | Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc. - With 22 / 33 KV AB switch using all types of poles of size 9 m and above length |
| 56 | Provision of guarding with two numbers earth pits excluding stay set erection - flat guarding with earth pit |
| 57 | Split neutral |
| 58 | Loading of REC/ RCC/PSC/Metal Pole upto 8.00m length |
| 59 | Loading of REC/ RCC/PSC/Metal Pole above 8.00m length |
| 60 | Loading of Metal poles all sizes |
| 61 | Unloading of REC/ RCC/PSC/Metal Pole upto 8.00m length |
| 62 | Unloading of REC/ RCC/PSC/Metal Pole above 8.00m length |
| 63 | Unloading of Metal poles all sizes |
| 64 | Loading or unloading of Distribution Transformer Upto 100 KVA |
| 65 | Loading or unloading of Distribution TransformerAbove 100 KVA and upto 500 KVA |
| 66 | Loading / Unloading of line materials |
| 67 | Loading / Unloading of 11 KV strain disc |
| 68 | Loading / Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., |
| 69 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM |
| 70 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading ) Above 5 KM of lead of every KM |
| 71 | Transportation of all sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.5 Km |
| 72 | Transport of Conductors of all sizes from Road side to pit locations upto 1 KM of Conductor |
| 73 | Transport of Distribution Transformer/Line Materials from sub stores to office/site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
| 74 | Transport of Distribution Transformer/Line Materials from sub stores to office/site above 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
| 75 | Dismantling of RCC, RCC, PSC metal poles all sizes 7.5m /8.0m /9.0m / 9.14m poles(RCC/PSC) including the closing of the pit |
| 76 | Dismantling Stay set complete including stay rod |
| 77 | Dismantling Stay set complete including without stay rod |
| 78 | Dismantling of Double channel X Arm |
| 79 | Dismantling of Guarding X Arm |
| 80 | Dismantling ofTapping channel cross Arm |
| 81 | Dismantling of 11 KV pin with insulator |
| 82 | Dismantling of 11KV composite Disc with MP |
| 83 | Dismantling of 22 KV pin with insulator |
| 84 | Dismantling of 22 KV composite Disc with MP |
| 85 | Dismantling of 1372 mm (4\"6\"\" V X Arm) |
| 86 | Dismantling of 1068 mm (3\"6\"\" V X Arm) |
| 87 | Dismantling of HT /LT TI fitting |
| 88 | Dismantling of 3 ph X Arm |
| 89 | Dismantling of 1 ph X Arm |
| 90 | Dismantling of Aluminium Knob |
| 91 | Dismantling of LT Shackle with Mp |
| 92 | Dismantling of LT Pin with Insulator |
| 93 | Dismantling of LT Open Type |
| 94 | Dismantling of metering set 11KV/22 KV/33KV |
| 95 | Dismantling of DT below 200KVA |
| 96 | Dismantling of DT 200KVA and above upto 500KVA |
| 97 | Dismantling of HT LAS (3 nos) |
| 98 | Dismantling of LT LAS (3 nos) |
| 99 | Dismantling of Cross arm clamps TI fitting hardwares, insulators, etc., |
| 100 | Dismantling ofconductor upto 7/3.35mmincluding transporting the conductors to the nearest road side and stocking of coils |
| 101 | Dismantling ofconductor above 7/3.35mmincluding transporting the conductors to the nearest road side and stocking of coils |
| 102 | Releasing and reerection (resagging) of one run of all sizes of conductor |
| 103 | Releasing and Erection of 1 Ph SC wire (During conductor or Support Change |
| 104 | Releasing and Erection of 3 Ph SC wire (During conductor or Support Change |
| 105 | Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side |
| 106 | Numbering of poles including base painting and with cost of paint |
| 107 | Manufacturing / Altering of Clamps |
| 108 | Drilling of holes in the structure materials clamps etc., |
| 109 | AB switch or open type side arm stud, cutting and drilling holes |
| 110 | Clearing tree branches of Coconut tree |
| 111 | Clearing tree branches of Neem, tamarind, country tree etc., |
| 112 | Leveling of Ground using Bul Dozer |
| 113 | Clearing of Branches / Trees with JCB |