|
| 1 | Remuneration for Local Staff |
| 2 | Key Professional StaffResident-cum-Senior Structrual Engineer-1 No. |
| 3 | Material-cum-Quality Control Engineer 1 no. |
| 4 | Electrical Engineer (Part time) 1no. |
| 5 | P.H. Engineer (Part Time) 1no. |
| 6 | Architect (Part Time) 1no. |
| 7 | Sub-Professional StaffSupervision Engineer (Civil 2 nos.) |
| 8 | Supervision Engineer (Electrical 1 no.) |
| 9 | Quantity Surveyor 1 no. |
| 10 | Field Support StaffSurveyor 1 no. |
| 11 | Lab Technican 2 nos. |
| 12 | Administrative Support Staff |
| 13 | Office Assistant with Computer Knowledge |
| 14 | Data Entry Operator |
| 15 | Office Boy |
| 16 | Transportation (Rental only) (Fixed cost) |
| 17 | Insert Type of Vehicle 1 no. (1 x 30 Months, Bolero or Equivalent) |
| 18 | Office Rent - Fixed cost (Rental only) |
| 19 | The rent cost of maintenance, cleaning, repairperiod of 30 months. |
| 20 | Office Supplies, Utilities and Communication (Fixed cost) 1 x 30 months = 30 months |
| 21 | Office Supplies |
| 22 | Drafting Supplies |
| 23 | Computer running costs and software compatible with that of civil work. |
| 24 | Domestic and International Communication. |
| 25 | Office Furniture and Equipment (Fixed cost Rental) 1 x 30 months = 30 months |
| 26 | Office furniture rental shall comprise to run the consultant’s office items like desks, chairs, computer table, cupboards, filing cabinet, meeting table with chairs, white boards, sofa set etc. |
| 27 | Office equipments rental shall comprise to run consultant’s office items includes plotter, laser printer, photo copy machine, external CD writer, lap top, camera, SLR, generator, refrigerator etc. |
| 28 | Report and Document Printing |
| 29 | Monthly Progress Report. (4 Nos. of Copies) |
| 30 | Quarterly Progress Report |
| 31 | Supervision Manual |
| 32 | Part Completion Report |
| 33 | O & M Manual. |
| 34 | Final Completion Report with CD. |