|
| 1 | Kanjirathadi pumb house |
| 2 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 3 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 4 | OD18299/2024-2025: Engaging man mazdoor for removing the debris in the inlet channel of the petty |
| 5 | OD18297/2024-2025: Supplying and laying grease including cost and conveyance etc. complete as per the direction of departmental officers at site. |
| 6 | OD18312/2024-2025:Supplying and laying empty bags of size 0.60x0.35x0.15 filled with earth as per the direction of the departmental officers at site |
| 7 | OD18313/2024-2025:Engaging man mazdoor for removing and replacing the sand bag etc. complete as directed by departmental officers at site |
| 8 | OD18314/2024-2025:Supplying and fixing 150mm Dunlop belt including all cost and conveyance and labour charges etc. complete as per the direction of departmental officers at site. |
| 9 | OD19359/2024-2025: Supplying best quality of second class teak wood planks for replacing the damaged portion of petty including all cost and conveyance of materials, labour charges etc. complete Observed Data for 10 Cubic decimeter |
| 10 | OD18316/2024-2025:Engaging carpenter for repairing Petty para etc. complete as per the direction of the departmental officers at site. |
| 11 | OD19362/2024-2025: Supplying at site Galvanized steel bolts & nuts 10mm dia. and 125 mm long round head with slots etc. complete |
| 12 | OD19361/2024-2025: Supplying and fixing trosa bearing 1 set including cost and conveyance of material, labour charges etc. complete |
| 13 | OD19364/2024-2025: Supplying and fixing chain type bearing 1 set including cost and conveyance of material, labour charges etc. complete |
| 14 | OD19360/2024-2025:Supplying and fixing 63mm dia. ball bearing including cost and conveyance of material, labour charges etc. complete |
| 15 | OD18805/2024-2025:Supplying and renewing transformer oil (Colour less) of good quality including cost and<br>conveyance etc complete as per the direction of departmental officers at site |
| 16 | Pandarakkari pumb house |
| 17 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 18 | OD18250/2024-2025: Engaging man mazdoor for removing the debris in the inlet channel of the petty |
| 19 | OD18253/2024-2025:Supplying and laying empty bags of size 0.60x0.35x0.15 filled with earth as per the direction of the departmental officers at site |
| 20 | OD18260/2024-2025:Engaging man mazdoor for removing and replacing the sand bag etc. complete as directed by departmental officers at site |
| 21 | OD18263/2024-2025: Supplying and laying grease including cost and conveyance etc. complete as per the direction of departmental officers at site. |
| 22 | OD18264/2024-2025:Supplying and fixing 150mm Dunlop belt including all cost and conveyance and labour charges etc. complete as per the direction of departmental officers at site. |
| 23 | OD18420/2024-2025: Supplying best quality of second class teak wood planks for replacing the damaged portion of petty including all cost and conveyance of materials, labour charges etc. complete Observed Data for 10 Cubic decimeter |
| 24 | OD18268/2024-2025:Engaging carpenter for repairing Petty para etc. complete as per the direction of the departmental officers at site. |
| 25 | OD18269/2024-2025: Supplying at site Galvanized steel bolts & nuts 10mm dia. and 125 mm long round head with slots etc. complete |
| 26 | OD18270/2024-2025: Supplying and fixing trosa bearing 1 set including cost and conveyance of material, labour charges etc. complete |
| 27 | OD18272/2024-2025: Supplying and fixing chain type bearing 1 set including cost and conveyance of material, labour charges etc. complete |
| 28 | OD18273/2024-2025:Supplying and fixing 63mm dia. ball bearing including cost and conveyance of material, labour charges etc. complete |
| 29 | 12.1.1:Providing corrugate G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete ( up to any pitch in horizontal / vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.1.00 mm thick with zinc coating not less than 275 gm/m2 |
| 30 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes |
| 31 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 32 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 33 | Nilamakkari pumb house |
| 34 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 35 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 36 | OD18346/2024-2025: Engaging man mazdoor for removing the debris in the inlet channel of the petty |
| 37 | OD18345/2024-2025:Supplying and fixing 150mm Dunlop belt including all cost and conveyance and labour charges etc. complete as per the direction of departmental officers at site. |
| 38 | OD18347/2024-2025: Supplying and laying grease including cost and conveyance etc. complete as per the direction of departmental officers at site. |
| 39 | Manglikari pumb house |
| 40 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 41 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 42 | OD18363/2024-2025: Supplying and laying grease including cost and conveyance etc. complete as per the direction of departmental officers at site. |
| 43 | OD18364/2024-2025:Supplying and fixing 150mm Dunlop belt including all cost and conveyance and labour charges etc. complete as per the direction of departmental officers at site. |
| 44 | Madhupalam pumb house |
| 45 | OD18423/2024-2025: Supplying and laying grease including cost and conveyance etc. complete as per the direction of departmental officers at site. |
| 46 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |