|
| 1 | Preventive & schedule maintenance of split Air conditioners as per specifications. |
| 2 | Split Air Conditioners |
| 3 | Preventive & schedule maintenance of Package Air conditioners as per specifications. |
| 4 | Package Air conditioners (16.5 TR & 17.5 TR) |
| 5 | Supply and installation of various parts of split Air conditioners as per specifications. |
| 6 | Rewinding of burnt motors of Air Conditioners (for 1.5 TR split AC) |
| 7 | Supply and installation of Fan blade(for 1.5 TR split AC) |
| 8 | Supply and installation of Fan blower(for 1.5 TR split AC) |
| 9 | Supply and installation of Air Filter(for 1.5 TR split AC) |
| 10 | Supply and installation of Compressor (Rotary/Hermatic)(for 1.5 TR split AC) |
| 11 | Supply and installation of Thermostate(for 1.5 TR split AC) |
| 12 | Supply and installation of Power circuit plate (PCB)(for 1.5 TR split AC) |
| 13 | Supply and installation of Condenser(for 1.5 TR split AC) |
| 14 | Supply and installation of Display(for 1.5 TR split AC) |
| 15 | Supply and installation of Remote(for 1.5 TR split AC) |
| 16 | Supply and installation of Swing motor(for 1.5 TR split AC) |
| 17 | Supply and installation of Sensor for Split AC(for 1.5 TR split AC) |
| 18 | Gas charging with fresh R-22/ R-134a/ R-410a/R32 refrigerant (as per model)to the required pressure as recommended by OEM |
| 19 | Supply and installation of Fan capacitor(for 1.5 TR split AC) |
| 20 | Shifting of Split AC from one place to another place(including un-installation and instalation) |
| 21 | Supply and installation of 1/2\" PVC pipe for drain of Split AC with bends, clamps & screws etc.. |
| 22 | Supply & Installation of insulation Foam for copper pipe line, 6mm to 8 mm Thick |
| 23 | Supply and installation of Copper pipewith fittings, Size : 1/2 \" |
| 24 | Supply and installation of Copper pipewith fittings, Size :3/8\" |
| 25 | Supply and installation of Copper pipewith fittings, Size : 5/8\" |
| 26 | Supply and installation of Copper pipewith fittings, Size : 1/4 \" |
| 27 | Supply and installation of various parts of Package Air conditioners (PAC). |
| 28 | Rewinding of burnt motors of outdoor units of Package Air Conditioners (for 16.5 TR or 17.5 TR PAC) |
| 29 | Supply and installation of Fan blade(for 16.5 TR or 17.5 TR PAC) |
| 30 | Supply and installation of Fan blower(for 16.5 TR or 17.5 TR PAC) |
| 31 | Supply and installation of Air Filter(for 16.5 TR or 17.5 TR PAC) |
| 32 | Supply and installation of Compressor (Scroll/Hermatic)(for 16.5 TR or 17.5 TR PAC) |
| 33 | Supply and installation of Thermostate(for 16.5 TR or 17.5 TR PAC) |
| 34 | Supply and installation of Power circuit plate (PCB) (for 16.5 TR or 17.5 TR PAC) |
| 35 | Supply and installation of Condenser (for 16.5 TR or 17.5 TR PAC) |
| 36 | Supply and installation of Display (for 16.5 TR or 17.5 TR PAC) |
| 37 | Supply and installation of Control system (for 16.5 TR or 17.5 TR PAC) |
| 38 | Supply and installation of Fan capacitor (for 16.5 TR or 17.5 TR PAC) |
| 39 | Gas charging with fresh R-22 refrigerant to the required pressure as recommended by OEM |
| 40 | Blower Belt A28 & A36 |
| 41 | Supply of labour chargesfor Operation of PAC system for shift operations |
| 42 | Technician/ AC Machanic |
| 43 | Trade Helper |
| 44 | Miscallaneous spare part for Split ACs, PACs, Water cooler and portable water purifiers |
| 45 | Supply and installation of Split AC cable 3 core (2.5 sq mm) |
| 46 | Supply and installation of Split AC cable 4 core (2.5 sq mm) |
| 47 | Supply and installation of Bearing (outdoor fan motor) bearing number 6203 |
| 48 | Supply and installation of Bearing (Blower) bearing number UC205 |
| 49 | Supply and installation of Split ac outdoor stand |
| 50 | Supply and installation of 1/4 \"\"charging Valves 1.5 TR split AC units |
| 51 | Supply and installation of1/2 \"\"charging Valves 16.5 TR package units |
| 52 | Supply and installation of 16 Amps Plug top |
| 53 | Supply and installation of White roll for insulation |
| 54 | Supply and installation of Single phage preventor for Package AC |
| 55 | Supply and installation of Connector for split ac electrical |
| 56 | Supply and installation of Connector for Package AC |
| 57 | Supply and installation of Contactors for Package AC panel board |
| 58 | Supply and installation of Relays for Package AC (Elec) |
| 59 | Supply and installation of Water cooler 40 ltrs (80 lts/hr) compressor |
| 60 | Supply and installation of Water cooler 40 ltrs (40 lts/hr) compressor |
| 61 | Supply and installation of Water cooler fan blade |
| 62 | Supply and installation of Water cooler capacitor |
| 63 | Supply and installation of Water cooler fan motor |
| 64 | Supply and installation of Water cooler thermostat |
| 65 | Supply and installation of Water cooler Over Load Protector |
| 66 | Supply and installation of Water cooler relay |
| 67 | Supply and installation of Water cooler gas (R-134a) 10KG |
| 68 | Supply and installation of Water cooler level switch with sensor type (WLC-1m 10A) |
| 69 | Supply and installation of Water cooler float valve |
| 70 | Supply and installation of Water cooler condenser |
| 71 | Supply and installation of Expansion valve for Package AC |
| 72 | Supply and installation of Drier for package AC |
| 73 | Supply and installation of Anchor bolt 8 mm |
| 74 | Supply and installation of Flexible drain pipefor split AC |
| 75 | Supply and installation of Main drain pipe for indoor unit Split AC |
| 76 | Supply and installation of stabilizer |
| 77 | Supply and installation of anti resistive coating paint for outdoor condensers |
| 78 | Supply and installation of paint for outdoor and indoor structures |
| 79 | Supply and installation of Rubber pad |
| 80 | Supply and installation of Sun film in square feet |
| 81 | Supply and installation of Fresh air filter 600X600 |
| 82 | Supply and installation of Duct hanger |
| 83 | Supply and installation of Thermostatic expansion valve for package unit |
| 84 | Supply and installation of Package AC HP and LP switch |
| 85 | Supply and installation of Nuts Bolts and screws and washers for all equipments |
| 86 | Supply and installation of RO membrane |
| 87 | Supply and installation of RO filters (spaun/carbon/sand) |
| 88 | Supply and installation of RO membrane casing |
| 89 | Supply and installation of RO system booster pump |
| 90 | Supply and installation of RO fittings like L,T and reducers |
| 91 | Supply and installation of RO PVC pipes 1/4 \"\" |
| 92 | Supply and installation of RO PVC pipes 1/2 \"\" |
| 93 | Supply and installation of RO UV filters |
| 94 | Supply and installation of AIR Diffuser (600X600) (Supply air diffuser/) |
| 95 | Supply and installation of AIR control (600X600) ( Dampers) to be installed near SAD/RAD |
| 96 | Supply and installation offollowing thickness of GI rectangular ducting including neoprene rubber gaskets, elbows, hangers, supports etc as per approved drawing complete as required with leak proof. |
| 97 | Thickness 0.63mm sheet |
| 98 | Thickness 0.8mm sheet |
| 99 | Supply and installation of flexible thermal insulated flexible duct (min 200mm dia) duly supported at regular intervals |
| 100 | Supply installation nitrile rubber insulation (of minimum 19mm thick) on existing duct including suitable aluminum foil along with suitable adhesives. |
| 101 | Supply and installation of Gasket (Neoprene) |
| 102 | Supply and installation of Supply Air Damper ( 475 X 450mm) at the discharge outlet ofPAC indoor unit |
| 103 | Supply installatllation testing of GI volume control damper complete with neoprene rubber gaskets, nuts, bolts, flanges, screws for completion of work. |
| 104 | Supply and installation of CPVC pipe for drain 40mm |
| 105 | Supply and installation of CPVC pipe for drain 25mm |
| 106 | Core cutting 77mm dia & 300 mm depth |
| 107 | Supply and installation of Corrugated PVC casing for copper tubings |