| 1 | Supply Partof 100KVA S/Stn. |
| 2 | Prov.Distribution Transformer 100 KVA,22/.04 KV (O/D Cu wound) |
| 3 | Prov. Steel pole 10 mtr long |
| 4 | Providing Muff 2 Mtr longwith concrete filling . |
| 5 | Providing x-Arms (Channel Iron(100x50x6mm) Length 2800mmx2Nos. |
| 6 | Providing MS Angle Iron (50x50x6mm) Length 2800mmX1Nos for LA\"s |
| 7 | Prov- X-Arms (Channel Iron (75x40x6mm) Length 2800mmX4Nos for supporting DO fuse unit &GO switch |
| 8 | Transformer Belting & Knee bracing. |
| 9 | Prov. X-Arms Channal Arms (100X50X6mm) length 2800mmX2Nos.) for transformer Bed. |
| 10 | Prov. X-Arms Channal Arms (100X50X6mm) length 460mmX2Nos.) for supporting for main channel of Transformer. |
| 11 | i)MS Angle Iron (50x50x6mm) Length:2800mmx2Nos |
| 12 | ii)MS Angle Iron (35x35x5mm) length 460mmx2Nos |
| 13 | iii)MS Angle Iron (50x50x6mm) Length:950mmx2Nos for bed knee bracing |
| 14 | Transformer LT distribution Box and GO switch fixing Assembly |
| 15 | MS Angle Iron (50x50x6mm) Length:2800mmx2Nos |
| 16 | MS Angle Iron (50x50x6mm) length 450mmx1Nos |
| 17 | GO switch handle supporting (channel (75x40x5mm) length 460mm |
| 18 | Go switch unit (22Kv,400A,25KV) Tripple pole O/Dtype |
| 19 | Providing DO Fuse Unit |
| 20 | Providing Surge Arrester 9KV Station Class (Porcelain Type) |
| 21 | Providing Disc Insuator Sets (comparising 1 No. Disc (Procelain BS 12KV ,90KN) including dead and clamp. |
| 22 | Providing Stay set complete |
| 23 | Providing Stay Wire 7/3.15 mm (@6.0 Kg. Per Stay Set ) |
| 24 | Providing Stay clamp |
| 25 | Prov. Pipe Earthing Set. |
| 26 | Prov. 6SWG GI wire for earthing |
| 27 | Providing LT Distribution Pannel Box With MCCB 160Amp. For 100KVA DTR |
| 28 | Providing Half Clamp(MS Flat 50x6mm) |
| 29 | Providing Full Clamp(MS Flat 50x6mm) |
| 30 | Providing Nut and Bolts of various sizes(galvanised/coated preferably 16mm or more with flat and spring washers) |
| 31 | Providing AluminumThimble |
| 32 | Providing Copper Thimble 200Amp. |
| 33 | Danger Plate.(Provided by HPSEBL) |
| 34 | Providing Barbed wire |
| 35 | Providing XLPE LT cable 3.5 Core 120MM² |
| 36 | Engry Meter (3-Ø,4-Wire) DLMS compliant CT operated static Trivactor meter with Box (Provided by HPSEBL) |
| 37 | Providing Aluminumpaint |
| 38 | SUPPLY OFMATERIALFOR 22 KV HT LINE |
| 39 | ACSR/6/1/3.35(50mm2) includes 3 conductor length for 3 phase and additional 1% jumpering |
| 40 | SteelTubular pole 10mtr. Mtr. |
| 41 | Providing Muff 2 Mtr longwith concrete filling . |
| 42 | X-Arms (MS Channel Iron(2800x100x50x6)mm |
| 43 | provding X-bracing Set (2800+1500) 50X50X6 |
| 44 | MS Angle Knee bracing |
| 45 | Prov. Disc Insuator Sets (comparising 1 No. Disc (Procelain BS 12KV ,90KN including ,socket ball eye clevis, straight stapples & Bend Stapples etc. complete in all respect. |
| 46 | Providing 22KV Pin insulator (Porcelain,36kv,10kn), 3No. Per double pole structure (Provided by HPSEBL) |
| 47 | Providing Stay Set complete in all respect.(i/c Stay Clamp)(1No. /Single Pole,4No./Double Pole Structures) (Provided by HPSEBL) |
| 48 | Providing Stay wire (7/4.00mm)(10.0kg per stay set)(Provided by HPSEBL) |
| 49 | Single continuous Earth wire(G.I 8SWG a/w 1 wire lengths for avg. one road crossing @ 20m and additional 1% sag and wastage @ 0.102 kg/m.(Provided by HPSEBL) |
| 50 | Providing HT Earthing set complete.(Provided by HPSEBL) |
| 51 | Prov. Eye Hook for earth wire . |
| 52 | Pole Clamp. |
| 53 | Providing Danger Plate.(250x200x1.6mm) (Provided by HPSEBL) |
| 54 | Providing Nut and Bolts of various sizes(galvanised/coated preferably 16mm or more with flat and spring washers) |
| 55 | Providing Barbed wire |
| 56 | Prov. Egg Insulator |
| 57 | Providing Aluminium Paint |
| 58 | SUPPLY OFMATERIALFOR3ØLT LINE |
| 59 | Prov. ACSR /6/1/3.35(50mm2) includes 3 conductor length for 3 phase and additional 1% jumpering |
| 60 | Prov. SteelTubular pole 9 Mtr. |
| 61 | Providing Muff 2 Mtr longwith concrete filling . |
| 62 | Prov.Shackle insulator (16 kn) |
| 63 | Prov. D-iron(U-Clamps) (Provided by HPSEBL) |
| 64 | Prov. Eye Hook Bolt |
| 65 | Prov. LT Stay set(i/c Stay Clamp) |
| 66 | Prov. Stay wire 7/3.15mm (6.0kg per stay set) |
| 67 | Prov. Egg insulator |
| 68 | Prov. Earthing Set |
| 69 | Single continuous Earth wire(G.I 8SWG a/w 1 wire lengths for avg. one road crossing @ 20m and additional 1% sag and wastage @ 0.102 kg/m.(provided by HPSEBL) |
| 70 | Providing Nut and Bolts of various sizes(galvanised/coated preferably 16mm or more with flat and spring washers) |
| 71 | Providing Aluminium Paint |
| 72 | Erection of Sub-Station |
| 73 | Manual carriage of 1 no 100 Kva trasformer and allied material from road head to site of work Av. Lead 0.500Kms |
| 74 | Erection of 22/0.4 KV Distribution Sub-Station |
| 75 | Digging of pit for 2Nos. pole |
| 76 | Drilling of hole in pole & X-Arms |
| 77 | Preparation of Plate form Str. Members CI, AI i.e. X-Arm & Knee Bracing Set |
| 78 | Erection of Doublepole |
| 79 | Erection of Plateform |
| 80 | Erection of X-Arms, Drop-out |
| 81 | Erection of 2 Nos. Stay Set HT |
| 82 | Erection of Jumper |
| 83 | Earthing for 3Nos. Earths |
| 84 | Digging of Pit |
| 85 | Fixing of earth rod, clamp,earth wire and connecting to the structure |
| 86 | Providing Charcoal and Salt for the eathing |
| 87 | filling of the pit with material . |
| 88 | Providing EarthingConn. ToG.O Swich,Transformer LightningArrestoretc. & Poles |
| 89 | Providing earthing to the transformer ,LT Box,Meter Box etc. |
| 90 | Barbed Wiire & Paining |
| 91 | Erection of 100KVA S/Stn, LT Box ,MCCB Switch , cable ,service Cable and Energy Meter |
| 92 | Prov. Transformer Bed for 100KVA (Civil Work) |
| 93 | Prov. chain link fencing Angle Iron gate etc. for Transformer fencing (as per HPRS) |
| 94 | Errection of 22KV HT line |
| 95 | Manual carriage of HT line material (S/T pole 5Nos. ACSR Cond. GI wire, Cross Barcing Set, Stay Set etc.)from road head to site of work Av. Lead 0.500 Kms |
| 96 | ERECTION OF STEEL TUBULAR POLE ( single pole 10 Mtr long) |
| 97 | Erection ofsingle steel tubular poles 10 mtr.long Single str. Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of insulator , X-Arm, Knee bracing set , top clamp, fixing of danger plate, painting of poles complete in all respect . |
| 98 | ERECTION OF STEEL TUBULAR POLE ( Double pole 10Mtr. long) |
| 99 | Erection ofDouble steel tubular poles 10mtr.long Single str. Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of insulator , X-Arm, Knee bracing set , top clamp, fixing of danger plate, painting of poles complete in all respect . |
| 100 | Sagging of conductor 1Km. Single wire ACSR Cond. 50mm2 |
| 101 | Laying of Conductor,Stringing & Sagging, Binding with insultor |
| 102 | Sagging of Single Continuous Earth wire (8 SWG) |
| 103 | Laying of Conductor,Stringing & Sagging, Binding with insultor and gaurding etc. |
| 104 | HT Earthing Set |
| 105 | Digging of pit,fixing of GI wire to the earth system and filling of pit |
| 106 | ERRECTION OF STAY SET HT |
| 107 | Digging of pit, Fixing of stay rod, Filling of pit, Nozzeling & tightening. |
| 108 | ERECTION OF 3Ø LT LINE |
| 109 | Manual carriage of 3Ø LT LINE material |
| 110 | Manual carriage of LTline material ( i.e S/T pole 4Nos. Shackle insulator D-Iron Stay Set etc.) from road head to site of work Av. Lead 0.500Kms |
| 111 | ERECTION OF STEEL TUBULAR POLE ( Single pole 9 Mtr long) |
| 112 | Digging of pit, drilling of holes in poles & x-arms, erection of pole, Erection of X-Arm,Shackle Insulator, filling of pit ramming. |
| 113 | Sagging of ACSR Conductor 6/1/3.35mm2. |
| 114 | Laying of Conductor,Stringing & Sagging, Binding with insultor |
| 115 | Sagging of Single Continuous Earth wire (8 SWG). |
| 116 | Laying of Conductor,Stringing & Sagging, Binding with insultor and gaurding etc. |
| 117 | Earthing |
| 118 | Digging of pit, Fixing of Gi wire to the Earthing System, Filling of pit. |
| 119 | ERRECTION OF STAY SET LT |
| 120 | Digging of pit, Fixing of stay rod, Filling of pit, Nozzeling & tightening. |