| 1 | fo|qr forj.k e.My&egjktxat ds v/khUk fo|qr forj.k [k.M&fupykSy ds vUrxZr tek ;kstuk ds vUrxZr ty thou fe\"ku ds rgr xzke lHkk& gjnh] t; Jh] ls[kqbZ rFkkteqbZ iafMresa dqy 04 vnn~ LFkyksa ij ykbu fuekZ.k dj ,y-,e-oh-&7 ds la;kstu fuxZr djusdk dk;ZA ¼leLr fodsUnzhd`r lkexzh Bsdsnkj }kjk vkiwfrZ djk;k tk;sxk½ |
| 2 | Loading and unloading and Carriage of 8.5 Mtr PCC Pole from ESC Maharajganj to Work Site. |
| 3 | Loading and unloading and Carriage of 9 Mtr/11.00 Mtr ST Pole from ESC Maharajganj to Work Site. |
| 4 | Loading and unloading and Carriage of 25/63 KVA Transformer from ESC Maharajganj to Work Site. |
| 5 | Mounting of Transformer On Double Pole with HT/LT Connection |
| 6 | The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support of 8.5 Mtr Single PCC Pole.as per drawing. |
| 7 | Erection of8.5 Mtr Single PCC Pole with all fittings .as per specification. |
| 8 | Erection of8.5 Mtr Double PCC Pole with all fittings .as per specification. |
| 9 | The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support of 11 Mtr ST Pole. |
| 10 | Erection of 11 Mtr Long Single STP, SP-55 Round Pole,as per specification |
| 11 | Erection of 11Mtr Long Double STP, SP-55 Round Pole,as per specification |
| 12 | Grouting of 8.5 Mtr. PCC Pole With Material as per Specification |
| 13 | Grouting of 9Mtr./11 Mtr. ST Pole With Material as per Specification |
| 14 | Plinthing of 9Mtr./11 Mtr. ST-Pole 300mm plinth above the ground level as per Specification |
| 15 | Erection of LT ABC |
| 16 | Erection of Weasel Conductor 3 Phase 3 Wire |
| 17 | Loading Unloading and Carriage of Line Material From Store Center to Work Site. |
| 18 | Erection of Stay Set |
| 19 | Earthing of Pole with MS Earthing Rod of 20x2500 mm and 6 SWG GI Wire Earthing etc. |
| 20 | Erection of Fuse Set |
| 21 | Provided & Installatio of V-X arm Clamp 11 KV |
| 22 | Provided & Installatio of F-Braket |
| 23 | Provided & Installatio of F Braket Clamp |
| 24 | Provided & Installatio of Top Channel |
| 25 | Provided & Installatio of Dropper Channel |
| 26 | Provided & Installatio of Top/Dropper Channel Clamp |
| 27 | Provided & Installatio of Transformer Base |
| 28 | Provided & Installatio of T-Off Channel |
| 29 | Provided & Installatio of ST PCC Pole Clamp |
| 30 | Provided & Installatio of Alluminium Cable |
| 31 | Provided & Installatio of Stone Pad |
| 32 | Provided & Installatio of Number Plate |
| 33 | Provided & Installatio of Barbed Wire |
| 34 | Provided & Installatio of Danger Board |
| 35 | Provided & Installatio of Nut & Bolt |