|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to a lead of 50 metres from road boundary including removal and disposal of top organic soil not exceeding 150 mm in thickness as directed by Engineer. In area of thorny jungle |
| 2 | Construction of embankment with approved materials deposited at site available from roadway cutting and excavation from drain and foundation of other structures, graded and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 as per MoRT&H specification clause 305. |
| 3 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Earth Rate for Lead 5 Km |
| 4 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. |
| 5 | Cleaning and removal of earth, silt, sludge, kankar, boulder, building material and garbage in existing nallah/drains including construction of bye pass arrangement to byepass water with 1.5m lift from ground level and lead up to 50 m including foul & saturated condition where pumping out or bailing out of water is required, including shoring, shuttering where required and dewatering. Making access for disposal and dressing disposal side as per the directed of theEngineer. For depth up to 1.5 m |
| 6 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto two stories excluding cost of centring, shuttering, finishing and reinforcement : 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) (As per design mix) |
| 9 | Reinforcement for R.C.C. work at all levels includingstraightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars |
| 10 | Centring and shuttering up to two stories or height up to 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. |
| 11 | Centring and shuttering with plywood or steel sheet up to two stories or height up to 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 12 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications and as per clause 2504 of MoRT&H Specification.With R.R. Stone/ bolder, weighing not less than 40 kg, thickness notless than 150mm, Specific gravity not less than 2.65. selection of stone as per the directions of site enginner in charge |
| 13 | Supplying & Laying of a geotextile filter between pitching andembankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching/ cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching. |
| 14 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 15 | Painting two coats on specified surface with synthetic enamel paint of approved brand and shade, after thorough cleaning and necessary filling to give even shade as per clause 803 of MoRT&H Specification including all material, labour. On steel surface |
| 16 | Providing and fixing precast dense cement concrete M-20 Grade(Vibro-pressed) drain section block of different size as per approved drawing, design and strength as per IS:2185 (part I) of grade \"D\" (5.00 N/mm2) proper quality of additive/admixture like plasticizer etc. added to produce high quality and durable drain section Blocks of \"L\" shape \"U\" shape etc. over 50mm thick CC M15 base course with fixing and joining with C.M.1:4 in proper grade and level complete in all respect. (cost of earth work, steel & welded mesh shall be paid extra). 80 mm thick |
| 17 | Providing and fixing of reinforced Ferro-Cement drain covers designed for \"A\" class loading duly marked on cover with adequate steel reinforcement having thickness 75mm to 150mm anti corrosivebitumen painted M.S. plate , Rim and M.S. lifting hooks, Admixtures like plasticizer, bond improving compound, shrinkage, resistance compound, abrasion resistant complete as per approved design etc. Standard Size 600x800mm (75mm thick) for span 300 to 450mm |
| 18 | Providing and Constructing gabion structure 0.5 to 1 meter high of required section made up of soft mechanically woven hexagonal shaped G.I. wire confirming to IS 16014:2012 having zinc plus PVC coating of overall diameter of 3.7 mm and tying lacing wire of 3.2 mm with edge wire confirming to overall diameter 4.4 mm edges being mechanically selvedge including placing in position, fitting neatly with trap stone rubble (15 to 23 cm) all loose ends to be securely tied (Excluding transportation) etc. complete. ( In Dry condition and for under water installation extra cost to be considered) |
| 19 | Finishing walls with textured exterior paint of required shade : New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including base coat of water proofing cement paint applied @ 2.20kg/10 sqm. |
| 20 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand). |
| 21 | 40 mm thick rubbed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement :5 coarse sand) with joints 3mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar . Red sand stone. |
| 22 | Flooring with Cobble stone of approx. Size 125x125x75 mm (thick) laid on 25 mm average thick cement mortar 1:3 ( 1 cement : 3 Coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the stone, laid in approved pattern complete in all respect as per direction of Engineer-in-charge. |
| 23 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level up to two stories in all shapes and sizes in :Cement mortar 1:4 (1 cement : 6 coarse sand). |
| 24 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 15 mm cement plaster on the rough side of single or half brick wall of mix : 1:4 (1 cement : 4 fine/ coarse sand). |
| 25 | Providing and fixing of 60mm thick precast cement concrete interlocking paver block casted with rubber moulds in approved reflective colour and design having minimum compressive strength of 300 kg/ sq cm. The CC paving blocks be laid on average 50mm thick bed of coarse sand and the joint is to be filled with fine sand. Laying procedure on compacted sub-base as defined. Complete job is to be executed as per the instruction of Engineer in charge. The rates to be inclusive of all lead & Lifts etc. complete as per specifications. |
| 26 | Providing and laying cast-in-situ cement concrete M-20 grade kerb stone channel top and bottom width 115 and 165 mm respectively, 250mm high laid with kerb laying machine, on 150 mm thick PCC M-10 grade foundation (laid manually) as per design, including fixing at site as per clause 408 of MoRT&H Specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. Using Concrete Batching and Mixing Plant |
| 27 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m |
| 28 | Providing and laying Precast reinforced Drain of U section of M-40 grade designed as per IRC specifications including the effect of impact, EQ etc.The work includes required safety measures, construction of drain for diversion of flowing water, cost of design of RCC Precast Box and any proof check requiredSize 0.3X0.45 |
| 29 | Providing precast cement concrete Jali 1:2:4 (1 cement : 2 coarsesand : 4 graded stone aggregate 6mm nominal size) reinforced with 1.6 mm dia mild steel wire including centring and shuttering, roughening cleaning, fixing and finishing in cement mortar 1:3 (1 cement: 3 fine sand) etc. complete excluding plastering of the jambs, sills and soffits. |
| 30 | ElectricalSupply installation testing & Commissioning of high mast lighting system (as per PLG 07 of ILP UK techinical report no 7 of ILE UK /IS:875 Part-1 – 2015//BSEN10025/and IS:2062 )consisting of totally hot dip galvanised by piecewise single dipped method high mast, lantern carriage suitable for up to 12 nos luminaries with welded arm (excluding luminares), mast head frame assembly with full cover, including 1 No. LED 15 Watts aviation obstruction lights, double drum type self sustaining winch, integral power tool accesible from door with padlocking arrangement (winch motor with control circuit) hot dipped galvanised heavy duty pipe lightening finial, Stainless steel 6 mm dia. wire ropes (AISI 316, 7 / 19 costruction 3 no. rope for lantern carrage & 2 no. rope for winch assembly ) foundation bolt, torque limiter,EPR insulated PCP sheathed 5 core x 2.5 Sq.mm trailing cable, including outdoor type control panel for auto on / off, reverse / forward motor operation. The mast is constructed from mild steel plates (as per IS 5986 Gr. 510 ) cut and folded to form a polygonal section, telescopic jointed and welding as per BS 5135.etc. as required on Existing Foundation. ( See table P - 03 for specs.) OEM Must have Type test certificate for wind tunnel test .All as per pre approved by Engineer in-charge. All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \"A\" attached with this BSR . |
| 31 | Providing and Laying RCC Foundation for Octagonal / Conica Street Light poles, High mast Poles as per Drawing attach at Table P-4 with Following Procedure & All as per pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure \"A\" attached with this BSR .A) Excavation of Pit for Foundation Size upto required depth from Ground levelB) Dressing of Pit and Dry stone pitching 200 mm thick including supply of stones and preparing surface complete.C) Providing and laying in position cement concrete of M-10 grade of 75 mm thicknessD) Reinforcement for R.C.C. work with TMT bars including straightening, cutting, bending, placing in position and binding all complete.E) Centring and shuttering including strutting , propping etc. and removal of form work for Footing and PedestalF) Providing & Fixing of 2 no. Required Size PLB HDPE Pipe & Foundation Bolt with template as per OEM Recommendations.G) Providing and Laying Reinforce cement Concrete of M-25 grade in Footing and Pedestal including Curing the foundation for 7 days.H) Providing and Fixing Nosing Angle 40 mm x 40 mm x 6mm with 2 no. 100 mm long, 10 mm dia. Lugs on each face.Pole Foundation for Octagonal pole from 10 Mtr. To 12 Mtr |
| 32 | Providing & Fixing of IK08 IP-66 protected high power LED flood light system with single piece Pressure diecast aluminium housing, toughened glass diffuser with suitable lenses on LED to achieve various beam angles, of high power LED of 3 to 5 watt each .Integrated potted driver as a unique BIS R number having efficiency more than 85 % and in compliance to BIS certified and Trade mark certificate. The System level Luminaire efficacy >=125 lm/ wt. LED driver Input Voltage AC 120 to 270 V AC with High voltage Cutoff @>=300 V AC and Auto resetting Safety .Power Factor >0.95 , THD(I) <10% , driver current <=750mA. driver should be Phase to phase protection of 440 V for 4 Hrs. Electrical Connector , Surge Protection Min >=4KV internal and 10KV external but inside drivercompartment, System life of 50000 Burning hours with 70% of Initial Lumens maintained, CRI>70 and CCT 5700K ±355K.Manufactures Word Mark/Name Engraved/Embossing/Screen printing on die cast housing to allow traceability/authenticity. Fixture shall be IS 10322 Complianced.OEM Must have its own in house NABL lab setup for all testing facilities for LED fixtures. (LM79/LM80) Certificate/ report with liable warranty of product/accessories from OEM shall be submitted. All as per pre approved by Engineer in-charge. For additional technicalparameters of products/ work , refer Annexure \"A\" attached with this BSR .High Power LED Flood Light Minimum lumen output 14800 lm |
| 33 | S& F of all in one solar LED street light fixture with Integrated high efficient Monocrystalline panel with Lithium (LiFePO4) Ferro Phosphate battery with BIS approved make .luminaire should be secondary optic lenses for better distribution with delivered efficacy of > 100 Lumen perwatt.Bidder shall have in house R&D Laboratory which is recognised by ministry of Science & Technology department, Govt. OfIndia/ NABL. Bidder shall have inhouse pole & luminaire manufacturing facility. Luminaire can be supplied with Hybrid switch along with indicator to understand the source of power( either from solar or AC supply).shall have certificate tested fromMNRE approved Lab. Guarantee for total system is two years .Note: All the above should be integrated and should be 1 system. make: Bajaj/Philips / Crompton. Compact Solar LED Street Light - 20W(MONO) 18V/ 12.8V9Ah/12W |
| 34 | Providing & Laying P.V.C. / XLPE insulated & P.V.C. sheathed Arrmoured Aluminium cable confirming to IS:1554 P-I / IS :7098 P -I of 1.1 KV with H4- Grade electrolytic aluminium conductor confirming to IS 8130 of purity >99.6 %, round / flat strip armouring of cables, Inner / outer sheath confirming to IS:5831 in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench / Cabletray(with cable tie) including testing etc. as required of following size. OEM must have it\"s own in house NABL accrediated Laboratory for testing procedure as per IS:10810.For additional technical parameters of product / work refer Annexure \"A\" attached with this BSR 3.5 core |
| 35 | Supplying and stacking good earth at site of work. Note: 1) Loading, unloading and carriage to be paid extra as per actual lead. 2) Earth measured in stacks will be reduced by 20% foe payment |
| 36 | Supply at site of work well decayed farm yard manure, from any available source, approved by the engineer in charge including screening and stacking |
| 37 | Supply and planting following in poly bags / earthen pots well branched, well established & free from disease of 300 mm min. height ground covers at site in 0.3 m dia holes, 0.3 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, backfilling the hole watering etc as required. Rhoeo spathacea \"Compacta‘ ( Oyster, Boat Lily) |
| 38 | Planting permanent hedges including digging of trenches, 60 cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard manure, supplied at the rate of 4.65 cum per 100 metres and supplying and planting hedge plants at 30 cm apart. |
| 39 | Grassing with \"Doobs\" grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed. In rows 7.5 cm apart in either direction |
| 40 | Preparation of mounds of various size and shape by available excavated/surplus/earth in layers not exceeding 20 cm in depth, breaking clods, watering of each layer, dressing etc.lead upto 50 meters and lift upto 1.5 m as per direction of officers in-charge. |
| 41 | Supply and planting following in poly bags / earthen pots well branched, well established & free from disease of 900 mm min. height plants at site in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, backfilling the hole watering etc as required.Ficus panda |
| 42 | Tecoma capensis ( Ratanjot) |
| 43 | Tabernaemontana variegated ( Chandni) |
| 44 | Hamelia patens ( Firebush, Thal Kamal) |
| 45 | Hibiscus variegated ( Guddal) |
| 46 | Supplying, erecting and fixing in position specified precast RCC bench made of RCC grade M-30 consisting of 2 Nos. “L” shaped base support of thickness 100 mm back height 1000mm, front height 450 mm, base width 420mm and 5 Nos. RCC planks of size of 1500x100 x 50 mm and 1 Nos RCC planks of 150x200x50mm including joining all parts with galvanised nuts and bolts of suitable size. All bolts to be sealed after assembly with nice finish and appearance and level complete in all respect as per direction of engineer in charge. Every bench should have a manufacture‘s logo of appropriate size Engraved at suitable place. |
| 47 | RUIDP Tecknology - Design, supply, erection, installation, jointing, testing, trial run, and commissioning of prefabricated micro Sewage Treatment Plants based on RUIDP Technology for Inlet parameter (Ph-6.5-7.5; BOD5 @ 20 degree C-300 mg/l; COD-650 mg/l; TSS600 mg/l; TKN-55 mg/l) and outlet parameter (Ph-6.5-9.0; BOD5 @20 degree C < 10 mg/l; COD-<= 50 mg/l; TSS- <=20 mg/l; N-Total-<=10 mg/l & Faecal Colliform-<100 MPN/100 ml)complete in all respects. STP will have following components:-A) Pretreatment Unit:- Design, Supply, Fabrication of Coarse Screen with Grit Separator Unit. The fine screen (2 Nos.; 1 W+1S) installed in sequence shall be made in SS316L using flat bars of 3 mm thick, 50 mm wide and spacing of 5 mm, tear shape and dimensions of the bar screen as per design approved by engineer. The grit and oil filter separation unit shall be also provided in SS 316 L with interconnecting pipeline made in 90 mm HDPE PE-100 PN-6 as per IS 14333 (amended up to date), necessary fittings while maintaining the hydraulic levels with capacity of removing grease, oil and grit particles having specific gravity 2.85 with removal efficiency of 80%. Prefabricated sump with non clog sewage submersible pump set 1 W +1S of 2% Ni CI Cascading, Impeller CF 8M ,Shaft SS 410,mechanical seal with 10M Power & Control cable , 5M Galvanized Chain,,10M, 50mm MS galvanized Guide pipe, Duck Foot Bend, with Guide wire SS 304 etc. installed after the oil and grease chamber. Adequate arrangements shall be made for access to remove the screened waste and settled grit on manual basis.B) Primary Settling Tank Unit:- Design, Supply, Fabrication of Primary Settling Tank in Mild Steel of 2-4 mm thickness with FRP coating from inside and epoxy corrosion resistance paint on the outer surface having dimensions as per approved design and drawing by engineer. Necessary support elements shall be provided inside the Primary Settling Tank at a depth of 700mm(minimum) from the top and further down minimum depth of 1.250 m (0.50 m free board extra) for support of the Tube Deck Media. A conical section with adequate slope (1: 12) for sludge to settle and flow down into the sludge storage tank shall be provided. The construction shall be as per the provided drawing. Safety Rails shall also be provided around the top of the tank in 2 rows connected with vertical poles of 1.2 m height at 1.2 m distance apart of Aluminium pipe of 32 NB with modular fittings. A partition shall be provided after the Tube Deck media for collection of clarified effluent which shall be collected while flowing in upward direction. Including GST, Taxesand duties and erection at site. C) Secondary-cum-Biological Treatment Unit:- Design, Supply, Fabrication of Secondary cum Biological Treatment Unit in Mild Steel of 2-4 mm Thickness with FRP coating from inside and epoxy corrosion resistance paint on the outer surface having dimensions as per approved design drawing by employer with 3 vertical partitions (minimum) at equal spacing for a minimum length of 3.0 m. The depth of the partitions shall be minimum 1.250 m (0.50 m free board extra) from the vertical. The bottom of the unit shall be conical in shape for sludge collection , fraction of which shall be recycled |