Supply Of Materials For Construction Of Kitchen Room For Govt. Lower Primary School At Iligeri Tota In Bagaranal Village Of Gokak Taluk. - Casurina Poles 100 - 150 Mm.,,Plastic Emulision Paint 01,Aluminium Window Frame Section 1.20 Mm Thick.0,Bib Cock 20Mm Nominal Bore.01,Pvc Pipe Of 4Kgcum,110 Mm.0,Pvc Pipe Of 4Kgcum, 63 Mm.00,Handling Loading And Unloading 3% On Material.04,Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Material.03,Polyenthylene Water Storage Tank Of Specified Capacity L.12,Add Providing And Removing Scaffolding At 3% On Labour.01,Enamel Paint,.,Add Brush, Putty, Sand Paper At 5%, On Cost Of Paint,Add Brush, Putty Glue At 5% On Cost Of Paint,Whitening,.,Dry Distemper.,.,Mathi/Nandi Wood Scantling,,Vitrified Tiles 10 Mm Thick 600 X 600, Mm,Add Hom Of Welding And Grinding Machine At 2% On Material,Fabricator_.,Add 15% Wastage For Glass,.,Plain Glass 5.50 Mm Thick_,Chrominum Plated Screws.,.,Cleat Angles_,Alluminium Handles - 15 Mm.,.,Alluminium Tower Bolt - 20 Cm.,.,Pvc Edge Beading.,Rubber Beading For Shutters Beading.,,Nylon Rollers,.,Add Brush At 1% On Cost Of Paint.,.,Enamel Metal Paint.,,Painter Class I.,,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint.,Ready Mix Primer Paint (Ready Mix Red Lead Paint).,Add Hom Of Welding And Grinding Machine At 4% On Materi,Fitter Class 1,Ms Flat,.,M.S Rods,,Hom Of Machinaries For Planing,.,Add Cutting And Other Wastage 5%,,Mathi/Nandi Wood Planks For Panels 25 Mm Thick,,Unit Cost As Per The Specification.,,Tools And Plants At 2% Of Material,Hom Of Cutting And Grinding Machine.,,Mechanic Class Ii / Mechanic Hmp Grade I/Eme Grade,Add,,Hom Of Welding And Grinding Machine.,,Welder Grade 1.,Corbon Electrodes.,,Rms Gusset Plate,,Ms Pipes Of 80 Mm To 100 Mm Dia,,Add Sundries Charges At, 1 % On Material.,Add Sundries Charges At, 2 % On Material,Add Handling Loading And Unloading At 1% On Material.,,Burnt Bricks Class 35 (Non Modular).,,Add Watering Charges At 1 % On Labour.,,Add Sundries Charges At 1 % On Labour.,,Stone Chistler Class - Ii,Mason Class I (With Tools).,.,,Mason Class Ii (With Tools).,.,Boulders.,,Size Stone 20 X 20 X 25 Cms.,,Mixer (Concrete Small Used In Culvert.),Bond Stone 20 X 20 X 45 Cm.,,Rubble Stones.,,Binding Wire,.,Tmt Bars Fe 500,.,Add Handling Loading And Unloading At 2% On Material.,,Casurina Poles 75 - 100 Mm Dia.,Jungle Wood Runners And Plank.,,Silver Oak, Or Equivalent Planks 38 Mm Thick.,,Hom Of Vibrator 0.71 Days.,,Plasticizer / Super Plasticizer.,.,Over Head, & Other Miscellaneous Charges,Add Watering Charges At 1 % On Material.,,Mixer (Concrete) - 1 Cum Capacity.,,Portland Cement,.,Coarse Sand (Zone Iii),,Broken Stone Aggregate 12 Mm To 10 Mm Size,,Broken Stone Aggregate 20 Mm Size,,Broken Stone Aggregate 40 Mm Size,