Providing 25 Kw Rooftop Grid Connected Solar Power Plant In Judicial Court Complex At Hodal, Hathin In District Palwal, Judicial Court Complex Sohna, Pataudi In District Gurugram And District Court Complex Faridabad Under Electrical Division Pwd B&R Br., , Pataudi-Haryana
TDR : 45923131
Tender Notice
BOQ
Expired
Pataudi
Haryana
Providing 25 Kw Rooftop Grid Connected Solar Power Plant In Judicial Court Complex At Hodal, Hathin In District Palwal, Judicial Court Complex Sohna, Pataudi In District Gurugram And District Court Complex Faridabad Under Electrical Division Pwd B&R Br.,
Name of Work :PROVIDING 25 KW ROOFTOP GRID CONNECTED SOLAR POWER PLANT IN JUDICIAL COURT COMPLEX AT HODAL, HATHIN IN DISTRICT PALWAL, JUDICIAL COURT COMPLEX SOHNA, PATAUDI IN DISTRICT GURUGRAM AND DISTRICT COURT COMPLEX FARIDABAD UNDER ELECTRICAL DIVISION PWD B&R BR., GURUGRAM UNDER eCourts PHASE III PROJECT
Sl. No.
Item Description
1
S/E mark double walled corrugated (DWC) HDPE, pipe 10 Kg/Cm2 ,laid 0.75 Mtr below ground level includingdiging and refilling of earth including cost of suitable size socket/cuppler for HDPE pipe including the cost of labour and material required to complete the job in all respect up to the entire satisfaction of Engineer in charge of the work. DWC/HDPE pipe 63/50 mm outer dia/inner dia
2
Providing & erection/ laying of PVC/ XLPE insulated underground aluminium conductor underground cable loose in existing pipe or trenches complete in all respect with necessary connection upto the entire satisfaction of engineer in charge of the work. 16 Sq mm 4 core (Arm.)
3
Providing & erection/ laying ofPVC/ XLPE insulated underground aluminium conductor underground cable on surface/ existing cable tray complete in all respect with necessary connection upto the entire satisfaction of engineer in charge of the work 16 Sq mm 4 core (Arm.)
4
Innovating Technologies, New Materials and Solar Panels NA SOLAR PANELSSupply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Modulemanufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. other specifications as per DNIT in PDF.Above 100 kWp and up to 500 Kwp
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.