| 1 | Route alignment map using remote sensing method along with field works GPS for both terminal points and along the route including cost of all materials, hire charges for GPS and other T & P including transportation, labour charges, lead, lift etc. complete as per standard specification and as directed by the department engineer at site. |
| 2 | Preparing route alignment with remotesensing and field verification in GTS map using 1:50,000 scale including procurement, processing GTS map GEO referanceing, route in the layout with identification of reserved forest developed area, etc., including cost of all materials, labour, all lead, lift etc., complete as per standard specification and as directed by the department engineer at site. |
| 3 | Preparationof route map in colour printout of topo sheet in 1:50,000 scale for route alignment using remote sensing method including cost of all labour, lead, lift etc., completeas directed by the department engineer at site. |
| 4 | Conducting preliminary survey and detialed survey with GPS, total station and DGPS, plotting profile and tower spotting and submission of report, tower schedule, justification of angle points (10 copies) and profile in duplicate including cost of all materials, transporting, labour, lead, lift, etc. and incorporating the details of exisitng structures viz., coal pipe conveyors, transmission lines, etc., complete and as directed by the Department Engineer at site. |
| 5 | Preparation of crossing drawing in Auto Cad and submission of P & T, EHT, Roads, Railway crossing etc., including cost of all materials, leads, lifts etc., complete. |
| 6 | Clearing the juliflora jungle for surveying including cost of labour, lead lift etc., complete as directed by department engineer at site. |
| 7 | GST for bidders within TamilNadu |
| 8 | SGST |
| 9 | CGST |
| 10 | GST for bidders outside TamilNadu (IGST) |