|
| 1 | Supply,Testing,Loading,Transportation,Unloading,andErection ofSteel Tubular Pole, 11 mtr long Pole(ST-410 SP69) with planting depth of 1/6 th of the height of the pole, (9 mtr. Long ) as per approved drawings/standards |
| 2 | Supply,Testing,Loading,Transportation,Unloading,andErection ofSteel Tubular Pole, 11 mtr long Pole(ST-410 SP56) with planting depth of 1/6 th of the height of the pole, (9 mtr. Long ) as per approved drawings/standards |
| 3 | Supply,Testing,Loading,Transportation,Unloading,andErection ofSteel Tubular Pole, 9 Mtr. Long Pole(ST-410 SP33) with planting depth of 1/6 th of the height of the pole, (9 mtr. Long ) as per approved drawings/standards |
| 4 | Supply,Testing,Loading,Transportation,Unloading, , Laying ,Stringing, Tensioning & Binding of ACSR Conductor, (30mm2 ACSR Conductor) as per approved drawings/standards |
| 5 | Supply,Testing,Loading,Transportation,Unloading, , Laying ,Stringing, Tensioning & Binding of ACSR Conductor, (50mm2 ACSR Conductor) as per approved drawings/standards |
| 6 | Supply,Testing,Loading,Transportation,Unloading andFixing of11KV Polymeric composite pin insulators 12kV, 5kN, lightening impulse 75kV positive and 80kV negative , creepage distance 320mm |
| 7 | Supply,Testing,Loading,Transportation,Unloading andFixing of 11KV Polymeric composite disc insulators 12kV, min falling load 45kN, lightening impulse 75kV positive and 80kV negative , creepage distance 320mm |
| 8 | Supply,Testing,Loading,Transportation,Unloading andFixing ofGI Pipe of 150mm dia 2mtr. Long for Pole butts |
| 9 | Transformer pad / GI Channel bedding |
| 10 | G.I Channel V-X arms 75x40x6mm with Top bracket including suitable clamps/collars As per REC Standard |
| 11 | G.I Channel-X arms 75x40x6mm including suitable clamps/collars As per REC Standard |
| 12 | G.I Angle 50x50x6mm for braces 9\" long including suitable clamps/collars As per REC Standard |
| 13 | Supply,Testing,Loading,Transportation,Unloading andFixing of11KV G.O, AB switch 3-phase, 3pole,200Amp, vertical type |
| 14 | Supply,Testing,Loading,Transportation,Unloading andFixing of 11kV Horn Gap Fuse Set 3 Phase 200A |
| 15 | Supply,Testing,Loading,Transportation,Unloading andFixing of11kV Link Set |
| 16 | Supply,Testing,Loading,Transportation,Unloading andFixing ofGalvanised Nuts & Bolts |
| 17 | Galvanised stay set with 50X8mm stay clamp, guy insulator (02nos), anchor plate (200X200X6)mm nut bolts, 02nos turn buckle, 1.8m long, 16mm diameter solid GS stay rod & 7/3, 15mm dia GI stranded wire complete |
| 18 | Supply,Testing,Loading,Transportation,Unloading andFixing ofCement bottoming 1:2:4 as per standards0.78cum / pole |
| 19 | Supply,Testing,Loading,Transportation,Unloading andFixing ofCement bottoming 1:2:4 as per standards0.66cum / pole |
| 20 | Supply,Testing,Loading,Transportation,Unloading andFixing ofCement bottoming 1:2:4 as per standards0.48cum / pole |
| 21 | Supply,Testing,Loading,Transportation,Unloading andFixing ofSpike earthing rod 20mm 2.5mtr long with G.i strip (25X3)mm |
| 22 | Providing & Painting of Poles with one coat of Red Oxide and two coats of aluminium paint and as per approved drawings/standards |
| 23 | Supply,Loading,Transportation,Unloading and fixing ofDanger Plate with clamps as per approved drawings/standards |
| 24 | Supply,Loading,Transportation,Unloading and fixing of GI Barbed wire for Anti climbing deviceas per approved drawings/standards |
| 25 | Supply,Loading,Transportation,Unloading and fixing of Sign Board (2X2 feet) along with required accessories like clamps, nuts and bolts with all details viz. Name of the Village, Name of the Work,Head,Date of Start,Date of completion, Implementing Agency(KPDCL O&M Division Baramulla), Name of the contractor. |