| 1 | Demolishing cement concrete 1:3:6 manually/by mechanical means including disposal of material within 50 metres lead |
| 2 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead |
| 3 | Earth work in all kinds of soil in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1 Osqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level in 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) |
| 5 | Providing and laying in position cement concrete of specified grade 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size)excluding the cost of centring and shuttering- All work upto plinth level |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement-All work upto plinth level 1.1.5:3 (1 cement : 1.5 coarse sand : 3graded stone aggregate 20mm nominal size) |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete TMT bars |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 9 | Foundation, footings, bases of column etc |
| 10 | Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. |
| 11 | Suspended floors, roofs, landings, balconies and access platform. |
| 12 | Edges of slabs and breaks in floors and walls Above 20 cm wide |
| 13 | Stone aggregate below 40mm/sandfor an average lead of 30 Kms |