Tender For Rcc Flooring And Renovation Of Godown No.15 For Stacking Of Ilmenite.; 1 Earthwork in excavation for ground leveling in all types of soils, using mechanical means (hydraulic excavator) or manual methods. The work includes excavation, consolidation, watering, removal of excess soil/sand from the site, and unloading. All costs associated with conveyance, hire charges for tools, and mechanical equipment are to be included, ensuring the work is carried out as per standard specifications and guidelines. 2 Supplying and placing RMC of M-7.5 mix (cement content of 200 Kg/m³) for base concrete in flooring and road construction. The work includes all costs associated with the conveyance of RMC with addmixtures , hire charges for concrete motor pumps, boom placers/pump, and shuttering materials. It also covers all labour charges, watering, curing, and compacting the concrete using mechanical or electric vibrators, ensuring complete adherence to standard specifications. The cost of MS reinforcement is excluded’’.The placement of concrete requires the use of concrete motor pumps and boom placers. All hire charges, operational costs, and any other associated expenses are included in the contractors quoted rates. No additional claims for these charges will be entertained.To ensure quality and compliance with specifications, RMC test certificates must be submitted. These certificates shall include details on mix proportions, compressive strength, and other relevant properties. The costs associated with testing and certification are to be included in the contractors quoted rates.It is important to note that IREL will not entertain any price escalation beyond the initially quoted rates under any circumstances, including factors such as market dynamics, fluctuations in raw material prices, or other relevant influences. Bidders are required to thoroughly review the Special Conditions of the Contract (SCOC) to ensure full awareness before submitting their rates. 3 Supplying & PlacingRMC M-35 mix (cement -420 Kg/M3) for concrete flooring & road concrete including all cost and conveyance of RMC with admixtures,hire charges for concrete motor pumps and boom placers,shuttering materials, all labour charges, watering,curing etccomplete as per standard specification but excluding cost ofMS reinforcement. (Concrete should becompacted with mechanical/electric vibrator)The placement of concrete requires the use of concrete motor pumps and boom placers. All hire charges, operational costs, and any other associated expenses are included in the contractors quoted rates. No additional claims for these charges will be entertained.To ensure quality and compliance with specifications, RMC test certificates must be submitted. These certificates shall include details on mix proportions, compressive strength, and other relevant properties. The costs associated with testing and certification are to be included in the contractors quoted rates.It is important to note that IREL will not entertain any price escalation beyond the initially quoted rates under any circumstances, including factors such as market dynamics, fluctuations in raw material prices, or other relevant influences. Bidders are required to thoroughly review the Special Conditions of the Contract (SCOC) to ensure full awareness before submitting their rates. 4 Sundry & Petty works Miscellaneouswork etcSkilled labour 5 Supplying, bending, tying, and placing Fe 500 MS reinforcement bars in position for all RCC works at all heights and levels. The work includes all costs and conveyance of MS bars and binding wire, loading and unloading charges, and labour for straightening, cutting, bending, and binding with approved annealed binding wires or welding as required. The work shall be carried out as per standard specifications.