annual maintenance of L/s work in Sector-27 Panchkula (Repair of boundary wall of park area, repair of Children Playing equipments, repair of open air Gym Equipments and all other works contingent thereto.)-10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. 2 [10.30.2]Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath and courtyard, joined eith neat cement slurry mixed wth pigment to match tha shade of tiles, including rubbing and cleaning etc. cpmlete, on 20 mm thick bed of cement motar 1:4 , 2 medium shade pigment using 50% white cement 50% Grey cement 3 [11.6.2]15 mm cement plaster on the rough side of single or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand) 4 [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. 5 [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works 6 [30.23.1]White washing with lime to give an even shade : 1. Old work (two or more coats) 7 [30.37.2]Finishing walls with Acrylic Smooth exterior paint of required shade : 2. Old work (One or more coat applied @ 0.90 litre/10 sqm). 8 [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil 9 [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) 10 [6.29.3]Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts 11 [6.8.2]Providing and laying damp-proof course with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) 2. 40mm thick 12 [7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) 13 Repair of Twister i.e. Unbuilding the Gym equipement at carriage at workshop cutting welding the iron pipe, plate, shaft and other repair, painting spray paint and carriage of Gym Equipment from work shop to sidc and refixed at site complete in all respect. 14 Repair of various type of Children Playing Equipment`s i.e Bridge Ladder and carriage at workshop, cutting welding the angle Refixing of the Missing/ broken round pipe. Priming. Spray painting and carriage of Children Playing Equipment`s from work shop to site and refixed at site with the nut Bolt etc complete in all respect and satisfaction of Engineer-in-charge. 15 various type of Children`s Playing Equipment`s i.e Chain Swing and carriage at workshop, cutting welding and Refaxing of Missing/broken, chain |round pipe, Priming, Spray painting and carriage of Children Playing Equipment`s from work shop to site and refixed at site with the nut Bolt etc complete in all respect and satisfaction of Engineer-in-charge. 16 Repair of Air walker i.c. Unbuilding the Gym equipement at carriage at workshop cutting welding the walker legs including fixing new change of bearng sct, shaft, |U-clups, painting spray paint and carriage of Gym Equipment from work shop to side and refixed at sitc complete in all respect 17 Repair of chest Press i.c. Unbuilding the Gym equipement at carriage at workshop cutting welding 06 Nos bearing sets shaft, hub, painting spray paint and carriage of |Gym Equipment from work shop to side and refixed at site |complete in all respect. 18 Repair of Knee Chain i.c. Unbuilding thc Gym |equipcment at carriage at workshop cutting wclding the walker legs including fixing new changc of bcarng set, shaft, |U-clups, painting spray paint and carriage of Gym Equipment from work shop to side and refixed at site complete in all respect 19 Repair of Multiplay station and replacement of Old damaged sides of Multiplay station with new FRP slides 6mm thick and approved color coating fixed at site with nut bold and clump CC complete fixed at site for complete job work 20 Repair of various type of Children Plaving Euipments ie Slide Ladder and carriage at workshop, cutting welding the sheet, Refixing of the Missing/broken round pipe -Clamps, Priming, Spray painting and carriage of Children Playing Equipments from work shop to site and refixed at site with the nut Bolt ctc complete in all respect land satisfaction of Engineer-in-charge 21 Repair of various type of Children Playing Euipments i.e See saw and carriage at workshop, cutting welding and Refixing of Missing/broken, -round pipc/Shect, Priming., Spray painting and carriage of Children Playing Equipments from work shop to site and refixed at site with the nut Bolt etc complete in all respect and satisfaction of Engineer-in-charge. 22 Providng and Fixing of GI Interlocking wire mesh jali (10 gauges) of 2`x2` as per design and drawing complete in all respect and to the entire satisfaction of engineer-in-charge.