| 1 | 1. Construction of a culvert in Kosavapatty A.D. colony at Kappiliapatty Panchayat Estimate Amount Rs.33.60 Lakhs |
| 2 | Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B |
| 3 | Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc, (Foundation) |
| 4 | CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Super structure) |
| 5 | Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc.,using mild steel angles of sizes 90x60x10cmgauge stiffness welded mild steel angles of sizes |
| 6 | Sub structure |
| 7 | Super structure |
| 8 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. |
| 9 | RCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc.,complete as directed by the Engineer (Bed block) |
| 10 | Rein Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works includingcost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. |
| 11 | Gravel filling behind the Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, including labour charges for filling in layers, watering, tamping under optimum moisture content to get the maximum densityall other incidental charges etc., complete. |
| 12 | Providing and fixing 100 mm Dia PVC Seepage pipes of required lengths for abutment and retaining walls including cost and conveyance of all materials to work site. Cost and labour for semispherical back fill arrangements with 100 mm size broken granite chips at the periphery and labour charges for fixing etc complete to drain the backfill as per standard specification. |
| 13 | Towards the costfor Supply and fixing of Bitumen pad including cost and conveyance and all charges etc., complete. |
| 14 | Supplying and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite, labour for fixing the same in correct position and all other incidental charges etc., complete. |
| 15 | Construction of Retaining wall |
| 16 | Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth etc, complete |
| 17 | Cement concrete 1 : 4: 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Foundation) |
| 18 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (below sill) |
| 19 | Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc.,using mild steel angles of sizes 90x60x10cmgauge stiffness welded mild steel angles of sizes |
| 20 | Provision forName Board with work details and Information boardincluding cost and conveyance and all labour charges etc.,complete |
| 21 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |