| 1 | Making one set of scaffolding only for replacing glass panels, painting, uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-in-charge. |
| 2 | 3.90 metre height :Labour for shifting : |
| 3 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.11th Floor/roof of 10th Floor : |
| 4 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directedwithin a lead of 75 m.11th Floor/roof of 10th Floor : |
| 5 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.11th Floor/roof of 10th Floor : |
| 6 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.11th Floor/roof of 10th Floor : |
| 7 | Brick work with 1st class bricks in cement mortar (1:6)In superstructure, ground floor :11th Floor/roof of 10th Floor : |
| 8 | Labour for scrapping and picking up olddilapidated mortar / plaster (Cement / Surki / Lime mortar) from the surface of old Brick faces including cleaning the frog without damaging the Brick and stacking the Bricks at Site / Stacking yard as per direction of Engineer-in-charge including removing all debris rubbish from site complete. |
| 9 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.For works in first floor / above 4 m.11th Floor/above 10th Floor : |
| 10 | Removing corroded worn out portion of reinforcement (when the area of bar is damaged by more than 25%) by cutting and replacing the same by a new plain round bar of requisite diameter by binding with required lap / welding with old bar, including cost of reinforcement, complete in all respect including removing unserviceable materials from site as per direction of theEngineer - in - charge. Note : Payment on weight (Kg.) of new reinforcement. |
| 11 | Cleaning the exposed reinforcement preferably upto full diameter by wirebrush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer\"s specification] |
| 12 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out aftercompletion of works (upto roof of ground floor)Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. --11th Floor/roof of 10th Floor : |
| 13 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed andraking out joints including throating, etc. With 1:6 cement mortar -- For works in first floor /above 4m. -- 20mm thick plaster.11th Floor/roof of 10th Floor : |
| 14 | 15 mm thick plaster : |
| 15 | M.S. works in brackets made from flats, angles, tees etc. to sizes specialy bent, twisted, forged; making holes drilled and fitted to rafter of trusses with necessary bolts, nuts, washer or screws etc. |
| 16 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : -- On steel or other metal surface :With super gloss (hi-gloss) - Two coats (with any shade except white) : |
| 17 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. |