|
| 1 | PART : A : BARRICADING & TENTAGE WORK |
| 2 | Hire charges includes transporatation at site within Muncipal Limits, Loading, Unloading, Placing and removing complete. |
| 3 | Steel pipe pedded chair |
| 4 | white cotton cloth cover for padded chair inculding ribbon |
| 5 | Kanat fixed without Tent. (15\"x6\") |
| 6 | Non woven synthtic carpet (Red/Green) (New) |
| 7 | Woolen Carpet (New). |
| 8 | Curtain cloth (View cutter ) made out of steel pipe frame covering with good quality white cloth to cut view including making holes and made necessary strengthening support against wind pressure complete . |
| 9 | Deluxe sofa |
| 10 | Three Seater |
| 11 | Two Seater |
| 12 | Single Seater |
| 13 | VIP Chair with cushion |
| 14 | Aluminium German Hanger Tent Roof made up of Waterproof, Fire resistant Synthetic Rubber fabric of885 GSM. |
| 15 | Chemical toilet with house keeping arrangement and providing liquid soap, tissues, comb, freshener etc. |
| 16 | Water Proof Tent with pipe pandal supported with Bamboo/Balli /MS Pipe frame. |
| 17 | Water Proof Tripal. |
| 18 | White Cotton chader (Sheet) (Washed) |
| 19 | Non woven synthtic carpet (Red/Green) (New) |
| 20 | Water proof dome with truss steel strcture, inner ceiling & curtains 90\" span |
| 21 | Water proofing canopy with ornamental frill, inner ceiling & curtains Upto size 20\"x20\" |
| 22 | Wooden Table 6\" x2\" (Babool). |
| 23 | Wooden stage height 120 to 180 cm.with steps made of 50 mm dia iron pipe frame with adjustable height system and having smooth top wooden board complete . |
| 24 | Barricading with Sal ballies as per design including tying with vertical post by coconut strings including digging out holes in all types of soil complete in all respect with two horizontal members height 1.2 m upto 1.5m above ground level and vertical supports upto 2.5 centre and upto 3 days period including removal and cleaning the site complete in all respect &including dressing of sides and providing retro reflective tapes for traffic safety as per direction of Engineer-in charge in all types of soil. |
| 25 | Making of holes in cement concrete/ Bitumenous road by power driven hammer for barricating work as per direction of Engineer in charge |
| 26 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr.: All kinds of soil |
| 27 | Providing Beldar |
| 28 | Add extra for hire charge for providing welded mesh size 25x25 mm (16SWG) over barricating (excluding hire charge of barricating) |
| 29 | Carriage ofBuilding Rubbish Stone metal (Grit and ballast etc.) including loading, unloading complete with all lead |
| 30 | Barricading with M.S. Pipe as per design including tying with vertical post including digging out holes in all types of soil complete in all respect with two horizontal members height 1.2 m upto 1.5m above ground level and vertical supports upto 2.5 centre and upto 3 days period including removal and cleaning the site complete in all respect &including dressing of sides and providing retro reflective tapes for traffic safety as per direction of Engineer-in charge in all types of soil. |
| 31 | Hire charges includes transporatation at site within Muncipal Limits, Loading, Unloading, Placing and removing complete PVC chair |
| 32 | PART : B : CONSTRUCTION OF HELIPAD WORK |
| 33 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per MoRTH Specification Clause 201 By Manual Means |
| 34 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr.: All kinds of soil |
| 35 | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 |
| 36 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401 For Grading IIIMaterial |
| 37 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. By Mechanical Means with 1 km lead |
| 38 | Extra rate for carriage of mixed material additional lead from in item 4.6 2nd Km. to 10th Km |
| 39 | White washing with lime to give an even shade including all scaffoldingNew work (three or more coats). |
| 40 | Marking Centre Line and stop lines etc. on road as per IRC pattern with thermoplastic paint of approved quality and make with 8% glass beads laid on the road surface at temperature 160\" C with a special applicator machine complete with a special applicator machine complete with labour material and traffic diversion arrangements. |
| 41 | Mud Mortar including specified ingredients. |