Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | S&F in repair LED street light fitting of 45 watts, 5700k, IP 66 power factor >0.95, IK-08 having 120 lm/watt efficacy with invidual lens cover oneach LED, rendering index > 70, 4 KV integrated surge protection, external 10 KV surge protection potted driver, toughned glass cover in high pressure die-cast powder coated aluminium housing and making connection using 3 core flexible copper cable complete all as specified and directed by Engineer -in-charge. |
| 2 | All as per srl item No. 1.00 here-in beforebut 60 watt |
| 3 | All as per srl item No. 1.00 here-in beforebut 70 watt |
| 4 | All as per srl item No. 1.00 here-in beforebut 90 watt |
| 5 | All as per srl item No. 1.00 here-in beforebut 120 watt |
| 6 | All as per srl item No. 1.00 here-in before but LED flood light 150 watt, 6000K |
| 7 | All as per srl item No. 1.00 here-in before but LED flood light 250 watt, 6000K |
| 8 | Note :-For item no. 1.00 to 7.00 :-a) Operating temperature of fitting shall be -10to 50 C and voltage range of 120 V-270V.b) LM-79,(not more than 1 year old) LM-80 reports for fitting are mandatory.c) The fitting shall have minimum 50000burninghours with LM 70 report.d) BIS stamp is mandatory on fixture & driver. |
| 9 | S&F in replacement potted driver with 4 KV surge protection suitable for street / Flood light fitting of size 25 W - 45W of make asper ground requirement and complete all as specified and directed |
| 10 | All as per srl item No. 8.00 here-in before but size of 60 W - 70W |
| 11 | All as per srl item No. 8.00 here-in before but size of 90 W - 120W |
| 12 | All as per srl item No. 8.00 here-in before but size of 130 W - 150W |
| 13 | S&F in replacement external surge protection of 10 KV complete all as specified and directed |
| 14 | S&F in replacement power contractor 3P, 25 A complete all as specified and directed |
| 15 | S&F in replacement MCB SPN 6 - 32 Amp complete all as specified and directed |
| 16 | S&F in replacement of bracket for fixing of street light fittings bend to shape, made out of32 mm dia GI pipe medium grade upto 1.5 mtr long fixed with and including two sets of MS clamp made out of Flat iron of size 50x6 mm, fabricated to shape and fixed with nuts, bolts & washers & two coats of aluminum paint over a coat of red oxide primer on iron component complete all as specified and directed by Engr-in-charge. |
| 17 | S&F in replacement three core Aluminium conductor PVC insulatedcable of size 2.5 sqmm FR multistranded 1100 volts grade complete all as directed by Engr-in-charge. |
| 18 | Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth and getting out in soft/loose soil for laying of cable ,pole foundation,stay,laying of pipe etc complete all as specified and directed. |
| 19 | Returning filling in, including spreading ,leveling ,watering and well ramming in layers not exc 25 cm complete all as specified. |
| 20 | M&L for sand cushioning to under ground cables with a layer of sand 8 cm before laying the cable and 15 cm after laying the cable complete all as specified(Note:-Punned thickness shall be measured and paid) |
| 21 | M&L for brick covering equal to length of bricks as mechanical protection to cable with well burnet sub class ‘B’ bricks laid as directed by the Engr-in-Charge. |
| 22 | Removing excavated soil to a distance not exceeding 50 mtr and deposting where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed. |
| 23 | Supply, laying and testing in replacement ofLT XLPE insulated, screened, PVC bedded, galvanised steel strip or wire armoured, electric power cable (heavy duty) with aluminium conductor, 1100 volts, grade cross sectional area 16 sq. mm 4 core complete all as specified |
| 24 | Supply, laying and testing in replacement ofLT XLPE insulated, screened, PVC bedded, galvanised steel strip or wire armoured, electric power cable (heavy duty) with aluminium conductor, 1100 volts, grade cross sectional area 10 sq. mm 2 core complete all as specified |
| 25 | S&F in repair GI tubing light grade 50 mm bore for cable protection laid in trenches in road crossing or fixed to wall/Pole complete all as specified and directed. |
| 26 | S&F in replacement for cable junction box made out of polycarbonate duly powder coated in grey colour, of size min 150 X 200 X 75 mmshock proof, termite proof, weather proof, UV-resistant, temperature resistant, IP 66, IK 09, with aluminium bus bar terminals, suitable to have MCB SPN and entry / exit of XLPE cable upto the size of 35 Sqmm 2 core, fitted on pole with clamp made out of 20 X 2 mm strip complete all as specifiedand directed by Engr-in-Charge |
| 27 | S&F in replacement automatic street light timer switch three phase, suitable to take load of minimum 5 kw 3 phase, 415 V based on weather proof photoelectric timer adjustable upto min 10 lux , alongwith suitable power contactor & MCB TPN 40 Amp on both input and output duly prewired with suitable size of copper wiring with proper lugs and terminal blocks with facility of manual ON/OFF switch complete enclosed in polycarbonate IP 66 enclosure shock, rust, weather & termite proof uv-resistant, FR grade fixed on pole with MS strip of size 20 X 2 mm complete all as specified & directed by Engineer -in -charge |
| 28 | S&F in replacement automatic street light timer switch single phase, suitable to take load of minimum 3 kw single phase, 230 V based on weather proof photoelectric timer adjustable upto min 10 lux , alongwith suitable power contactor & MCB SPN 20 Amp on both input and output duly prewired with suitable size of copper wiring with proper lugs and terminal blocks with facility of manual ON/OFF switch complete enclosed in polycarbonate IP 66 enclosure shock, rust, weather & termite proof uv-resistant, FR grade fixed on pole with MS strip of size 20 X 2 mm complete all as specified & directed by Engineer -in -charge |
| 29 | M&L for Pole painting with two coats of black bituminous paint externally through outfor embedded portion and making 30 cms wide strips with yellow and black paint at alternatively upto 1.50 metre height and applying two coats of aluminium paint over a coat of red oxide primer on remaining exposed surface of existing pole any size any type including numbers of cross arms, channels, clamps streetlight brackets and GI protection pipe also be painted,complete all as specified and directed by the Engr-in-Charge. |
| 30 | Taking out the acummulated sludge/mud mixed with sewage water from the clarigestor, Clasifier, Deteriorator including Pit chamber up to the depth of 8 Mtr open to the sky above ground level as well as below ground level, cleaning sewage sump by manually or mechanically using (spl T&P such as movable sewage cleaning tanker) scrapping inside wall and bottom by steel wire bush to remove rawmaterial and transport it tooutside cantonment area with in 10 Kms distance for disposal at low lying area at his own arrangment where the sanitary hazard do not take place and as per guidelines of civil authority all as directed. Thereafter cleaning/washing of internal surface using high grade bleaching powder and lime mixed water. Only settled down sludge and mud will be measured and contractor shall make his own arrangement for dewatering by diesel driven engine pump without any extra costcomplete in all respect all as specified and directed by Engineer-in-charge. Detail of Locations : SP No 6 or Sewage treatment plant (Clarigestor -02 Nos,Classifier,Deteriorator including Pit chambers. |
| 31 | Taking out the acummulated sludge/mud mixed and Cleaning/desludging of raw sewage in under ground sump well up to the depth of 8 Mtr including screening chamberand various sewage pumping installation by closing main incoming manhole and pumping out raw sewage to neat drain by using portabale non clog pump set, cleaning of raw sewage sump by manually or mechanically using (spl T&P such as movable sewage cleaning tanker) scrapping inside wall and bottom by steel wire bush to remove rawmaterial and transport it to out side the STP complex & outside cantonment areafor disposal at low lying area up to the distance of 10 Kms at his own arrangment where the sanitary hazard do not take place and as per guidelines of civil authority all as directed for disposal. Thereafter cleaning/washing of internal surface of UG sump using high grade bleaching powder and lime mixed water incl painting with two coat of cement based paint complete in all respect all as specified and directed by Engineer-in-charge. Detail of Locations :SP No 1, 3, 4, 5, 7, 8 & 9. |
| 32 | Supply and pouring of gear oil C-60 in clarigester, Agitator & deteriorator complete in all respect all as specified and directed by Engineer-in-charge. |
| 33 | Taking out non clog submersible sewage pump set from the sewage well and dismantling thepump set at site or taking to workshop for repair & maint of capacity1HP and of any make and refixing after complete repair and maint at the same sitecomplete in all respect all as specified and directed by Engineer-in-charge. (Note: Spare parts required for replacement shall be measured under respective items of BOQ.) |
| 34 | Rewinding with super enamelled copper wire non-clog submersible motor complete all as specified and directed. |
| 35 | Replacment of Rotor and bushes complete all as specified and directed. |
| 36 | Replacement of thrust plate complete all as specified and directed. |
| 37 | Replacement of oil seal complete all as specified and directed. |
| 38 | Replacement of roller bearing complete all as specified and directed. |
| 39 | Replacement of CI impeller complete all as specified and directed. |
| 40 | Taking out non clog submersible sewage pump set from the sewage well and dismantling thepump set at site or taking to contractor\"s workshop for repair & maint of capacity 4HP and of any make and refixing after complete repair and maint at the same sitecomplete in all respect all as specified and directed by Engineer-in-charge. (Note: Spare parts required for replacement shall be measured under respective items of BOQ.) |
| 41 | Rewinding with super enamelled copper wire non clog submersible motor complete all as specified and directed. |
| 42 | Replacment of Rotor and bushes complete all as specified and directed. |
| 43 | Replacement of thrust plate complete all as specified and directed. |
| 44 | Replacement of oil seal complete all as specified and directed. |
| 45 | Replacement of DE & NDE roller bearing set complete all as specified and directed. |
| 46 | Replacement of rubber rings complete all as specified and directed. |
| 47 | Replacement and pouring of oil complete all as specified and directed. |
| 48 | Replacement of locking arrangement complete all as specified and directed. |
| 49 | Welding, turning, polishing to rotor shaft and grinding upto reqd size of bearing and replacement of ball bearing as per sample providing new sleeve as per bearing size complete all as specified and directed. |
| 50 | Taking out non clog submersible sewage pump set from the sewage well and dismantling thepump set at site or taking to contractor\"s workshop for repair & maint of capacity 15 to 21 HP and of any make and refixing after complete repair and maint at the same sitecomplete in all respect all as specified and directed by Engineer-in-charge. (Note: Spare parts required for replacement shall be measured under respective items of BOQ.) |
| 51 | Rewinding with super enamelled copper wire of non clog submersible motor complete all as specified and directed. |
| 52 | Replacment of Rotor and bushes complete all as specified and directed. |
| 53 | Replacement of thrust plate complete all as specified and directed. |
| 54 | Replacement of oil seal (set of 2) complete all as specified and directed. |
| 55 | Replacement of DE & NDE roller bearing set complete all as specified and directed. |
| 56 | Replacement of rubber rings (set of 4) complete all as specified and directed. |
| 57 | Replacement and pouring of oil complete all as specified and directed. |
| 58 | Replacement of locking arrangement complete all as specified and directed. |
| 59 | Welding, turning, polishing to rotor shaft and grinding upto reqd size of bearing and replacement of ball bearing as per sample providing new sleeve as per bearing size complete all as specified and directed. |
| 60 | Dismantling of sewage pump set (centrifugal type) from the underground well and taking out with chain pulley system,split opening of motor and pump, reassembling, refitting and testing the same after complete repair at site ofcapacity 0.5 to 2 HP of any makecomplete in all respect all as specified and directed by Engineer-in-charge. (Note: Spare parts required for replacement shall be measured under respective items of BOQ.) |
| 61 | Rewinding with super enamelled copper wire of motor as per sample complete all as specified and directed. |
| 62 | Replacement of CI Impeller as per samplecomplete all as specified and directed. |
| 63 | Replacement of gland bush as per sample complete all as specified and directed. |
| 64 | Replacement of oil seal (set of 2) complete all as specified and directed. |
| 65 | Replacement of DE & NDE roller bearing set complete all as specified and directed. |
| 66 | Replacement of cast iron coupling set as per sample complete all as specified and directed. |
| 67 | Replacement of gland cup as per sample complete all as specified and directed. |
| 68 | Replacement of stud gland cup as per sample complete all as specified and directed. |
| 69 | Replacement of gland packing as per sample complete all as specified and directed. |
| 70 | Welding, turning, polishing to rotor shaft and grinding upto reqd size of bearing and replacement of ball bearing as per sample providing new sleeve as per bearing size complete in all respect all as specified and directed by Engineer-in-charge. |
| 71 | Replacement of nuts, bolts and stud of appropriate size complete all as specified and directed. |
| 72 | Dismantling of sewage pump set (centrifugal type) from the underground well and taking out with chain pulley system, split opening of motor and pump, reassmebling, refitting and testing the same after complete repair at site ofcapacity 7.5 HP of any makecomplete in all respect all as specified and directed by Engineer-in-charge. (Note: Spare parts required for replacement shall be measured under respective items of BOQ.) |
| 73 | Rewinding with super enamelled copper wireof motor as per sample complete all as specified and directed. |
| 74 | Replacement of CI Impeller as per samplecomplete all as specified and directed. |
| 75 | Replacement of gland bush as per sample complete all as specified and directed. |
| 76 | Replacement of oil seal (set of 2) complete all as specified and directed. |
| 77 | Replacement of DE & NDE roller bearing set complete all as specified and directed. |
| 78 | Replacement of cast iron coupling set as per sample complete all as specified and directed. |
| 79 | Replacement of gland cup as per sample complete all as specified and directed. |
| 80 | Replacement of stud gland cup as per sample complete all as specified and directed. |
| 81 | Replacement of gland packing as per sample complete all as specified and directed. |
| 82 | Welding, turning, polishing to rotor shaft and grinding upto reqd size of bearing and replacement of ball bearing as per sample providing new sleeve as per bearing size complete in all respect all as specified and directed by Engineer-in-charge. |
| 83 | Replacement of nuts, bolts and stud of appropriate size complete all as specified and directed. |
| 84 | Dismantling of sewage pump set (centrifugal type) from the underground well and taking out with chain pulley system,split opening of motor and pump, reassmebling, refitting and testing the same after complete repair at site ofcapacity 15 HPand of any makecomplete in all respect all as specified and directed by Engineer-in-charge. (Note: Spare parts required for replacement shall be measured under respective items of BOQ.) |
| 85 | Rewinding with super enamelled copper wireof motor as per sample complete all as specified and directed. |
| 86 | Replacement of CI Impeller as per sample complete all as specified and directed. |
| 87 | Replacement of gland bush as per sample complete all as specified and directed. |
| 88 | Replacement of oil seal (set of 2) complete all as specified and directed. |
| 89 | Replacement of DE & NDE roller bearing set complete all as specified and directed. |
| 90 | Replacement of cast iron coupling set as per sample complete all as specified and directed. |
| 91 | Replacement of gland cup as per sample complete all as specified and directed. |
| 92 | Replacement of stud gland cup as per sample complete all as specified and directed. |
| 93 | Replacement of gland packing as per sample complete all as specified and directed. |
| 94 | Welding, turning, polishing to rotor shaft and grinding upto reqd size of bearing and replacement of ball bearing as per sample providing new sleeve as per bearing size complete in all respect all as specified and directed by Engineer-in-charge. |
| 95 | Replacement of nuts, bolts and stud of appropriate size complete all as specified and directed. |
| 96 | Replacement of tyre type rubber coupling complete all as specified and directed. |
| 97 | Dismantling of sewage pump set (centrifugal type) from the underground well and taking out with chain pulley system,split opening of motor and pump, reassembling, refitting and testing the same after complete repair at site ofcapacity 25 to 40 HPand of any makecomplete in all respect all as specified and directed by Engineer-in-charge. (Note: Spare parts required for replacement shall be measured under respective items of BOQ.) |
| 98 | Rewinding with super enamelled copper wire of motor as per sample complete all as specified and directed. |
| 99 | Replacement of CI Impeller as per sample complete all as specified and directed. |
| 100 | Replacement of gland bush as per sample complete all as specified and directed. |
| 101 | Replacement of oil seal (set of 2) complete all as specified and directed. |
| 102 | Replacement of DE & NDE roller bearing set complete all as specified and directed. |
| 103 | Replacement of cast iron coupling set as per sample complete all as specified and directed. |
| 104 | Replacement of gland cup as per sample complete all as specified and directed. |
| 105 | Replacement of stud gland cup as per sample complete all as specified and directed. |
| 106 | Replacement of gland packing as per sample complete all as specified and directed. |
| 107 | Welding, turning, polishing to rotor shaft and grinding upto reqd size of bearing and replacement of ball bearing as per sample providing new sleeve as per bearing size complete in all respect all as specified and directed by Engineer-in-charge. |
| 108 | Replacement of nuts, bolts and stud of appropriate size complete all as specified and directed. |
| 109 | Replacement of tyre type rubber coupling complete all as specified and directed. |
| 110 | Material and labour for Dismantling of centrifugal /Non clog submersible sewage pump from inline pumpset assembly in theunderground sumpby chain pully or other mechanical devices and opening of pump, cleaningthe unwanted materials such as brick bats/ stone /cloth pieces/any solid/semisolid /any type foreign materialfrominner portion of the pumpsby opening theall nuts and bolts and refixing and fully alignthe complete pumps on the same existing place and make trouble free as directed by Engineer-in-charge. (Note:- the requiredmaterial such as Grease, cotton waste, Nut , bolt and washer to be deemed in the same job work). |
| 111 | M & L for preparing and cleaning the joints of RCC pipe after removing existing treatmentand applying leak proof cement compound (Dr Fixit) to stop the leakage RCC pipe upto 600mm dia and then apply a coat of cement base adhesive paint complete all as specified and directed by Engr-in-charge. |
| 112 | Testing of sewage effluent at the inlet of raw sewage sump and equalization tank and out let of chlorine mixing tank,sampling and anaylisis is to be carried out by NABL accredited authorized LAB per IS - 3025 for essential parameters such as BOD, COD, TSS, F-Coil, etc complete all as specified and directed. (Note:- Sample of raw sewage & post treated effluent is to be collected by contractor in presence of rep of accepting offr and submit result of the test to AGE E/M office as per directed by Engineer-in-charge.) |
| 113 | Supply and fixing in replacement of Star Delta starter suitable for 7.5 HP motor 415V AC, 3 Ph fixed on existing panel board include testing and commissioning complete with suitable contactors with coils and relays complete all as specified and directed. |
| 114 | Supply and fixing in replacement of Star Delta starter suitable for 15 HP motor 415V AC, 3 Ph fixed on existing panel board include testing and commissioning complete with suitable contactors with coils and relays complete all as specified and directed. |
| 115 | Supply and fixing in replacement of Star Delta starter suitable for 20 /25HP motor 415V AC, 3 Ph fixed on existing panel board include testing and commissioning complete with suitable contactors with coils and relays complete all as specified and directed. |
| 116 | Supply onlyin replacementPower contactor MNX 40 with relays and coils415 Vcomplete in all respect all as specified and directed by Engineer-in-charge. |
| 117 | Supply onlyin replacement Power contactor MNX 70 with relays and coils 415 V complete in all respect all as specified and directed by Engineer-in-charge. |
| 118 | Supplyonlyin replacement Delay timer relay ST-100(3-30 sec) suitable for 20 HP-40 HP startercomplete in all respect all as specified and directed by Engineer-in-charge. |
| 119 | Cleaning of sewage pipe lines in any depth (0.60 m to 6.00 mtr) of size 100/150/200/300 mm bore laid in trenches by HydraulicJet pressure machine as required at site flushing the line to make fully functional line upto entire satisfaction of Engr-in-charge and removing sludge outside cantonment area with in 10 Kms distance for disposal at low lying area at his own arrangment where the sanitary hazard do not take place and as per guidelines of civil authority all as directed and covering the same.(NOTE:- Unit rate quoted by the bidder shall include taking out sludge from line (liquid/semi-liquid/solid), Extraction of Sludge, removing incl loading / unloading & tranportation, excavation and returning filling etc.) |
| 120 | Supply and fixing in replacement MCCB 3 Pole LT 415 volt 50 Hz, AC 63/100 amps 16 kA with thermal magnetic release for OL & SC protection complete all as specified and directed. |
| 121 | Supply and fixing in replacement MCCB 3 Pole LT 415 volt 50 Hz, AC 125 amps 16 kA with thermal magnetic release for OL & SC protection complete all as specified and directed. |
| 122 | Supply and fixing in replacement MCCB 3 Pole LT 415 volt 50 Hz, AC 160 amps 36 kA adjustable type with thermal magnetic release for OL & SC protection complete all as specified and directed. |
| 123 | Supply and fixing in replacement MCCB 3 Pole LT 415 volt 50 Hz, AC 200 amps 36 kA adjustable type with thermal magnetic release for OL & SC protection complete all as specified and directed. |
| 124 | Making goodsurface by cutting/digging/chiselingunwanted existing surface and filling of mass concreteof PCC1:3:6 type C2 (using 40mm graded stone aggregates) in foundations, filling aroundsump well for prevention of direct hitting from rain water flow ofsump well complete all as specified and asdireceted by Engr -in-charge. |
| 125 | Surface dressing n exc 15 cm deep Cutting ofbushes / wild growth of any kinds andtaking outroot of wild growth by digging and making good surfaceincluding removing all unwantedmaterial such as bushes branches, bushes roots, shrubs, brushwood, undergrowth roots and sweeping neat and clean around outer area of sum well and sewage pump houses premises complete all as specified and asdireceted by Engr -in-charge. |
| 126 | Cross arms, bracings, supports,clamps and back plates fabricated from structural steel sections including nuts, bolts, washers,welding, bending cold or hot,drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat of paint complete all as specified and asdireceted by Engr -in-charge. |
| 127 | S & F in replacement of cast iron suice valve 150 mm dia both side flanged PN-1.6 conforming to IS 14846 (ISI marked) with stainless steel spindle and iron wheel non raising type including, nuts and bolts complete all as specified and directed. |
| 128 | All as per srl Item no 56.00 here-in-before but of 200 mm dia complete |
| 129 | All as per srl Item no 56.00 here-in-before but of 100 mm dia complete |
| 130 | S & F in replacement of cast iron non return valve 150 mm dia both side flanged (ISI Marked) confirming to IS 5312 (Pt-I) including nut & bolts complete all as specified and directed. |
| 131 | All as per srl Item no 59.00 here-in-before but of 200 mm dia complete |
| 132 | All as per srl Item no 59.00 here-in-before but of 100 mm dia complete |
| 133 | Supply and fixing in replacement of Star Delta starter suitable for 40HP motor 415V AC, 3 Ph fixed on existing panel board include testing and commissioning complete with suitable contactors with coils and relays complete all as specified and directed. |
| 134 | Servicing/maintenance and repairs (as and when defect occurs) of OCEMS from the rep of manufacturer during the period of contract including recharging of data pack of a year for continuous monitoring by PPCB & CPCB complete all as specified and directed by the Engineer- in-Charge. |
| 135 | Servicing/maintenance and repairs (as and when defect occurs) of CCTV cameras (incl UPS, Monitor & connected peripherals) by the experienced mechanic during the period of contractfor continuous monitoring complete all as specified and directed by the Engineer- in-Charge. |
| 136 | Servicing/maintenance and repairs (as and when defect occurs) of Flow meter (incl Valve & connected peripherals) by the experienced mechanic during the period of contractfor continuous monitoring complete all as specified and directed by the Engineer- in-Charge. |
| 137 | S & F in repairs for PVC pipes 3\" dia for reuse of treated effluent lineincl all accessories, making connections and testing complete all as specified and directed by the Engineer- in-Charge. |
| 138 | Repair, servicing and comprehensive maintenance ofDG Sets of any make of the following capacities incl replacement of defective /burn out parts by new parts such as filters,gaskets,V belts,Engine oil , rubber hoses,cleaning of alternator by vacuum cleaner and greasing of bearing with cother connected work for the cap 62.5/63 kVA complete all as specified and directed by Engr-in-charge.(NOTE: Supply only of Spare parts required for repair/maint will be measured & paid separately under relavent items.) |
| 139 | All as per Srl Item No 67.00 here-in-before but of cap20-40 KVA of any Make& Type. |
| 140 | Supply only diesel filter element with O rings suitale for cap 62.5/63 kVA of any make and typeall as specified and directed by Engr-in-charge. |
| 141 | All as per item Sr No 69 here-in-before butfor cap 20-40 kVA. |
| 142 | Supply only Engine oil filter with by pass filter element with O rings suitale for cap 62.5/63 kVA of any make and typeall as specified and directed by Engr-in-charge. |
| 143 | All as per item Sr No 71 here-in-before but for cap 20-40 KVA. |
| 144 | Supply only Airfilter element suitale for cap 62.5/63 kVA of any make and type all as specified and directed by Engr-in-charge. |
| 145 | All as per srl item Sr No 73.00 here-in-before but for cap 20-40 KVA. |
| 146 | Supply only fan beltsuitale for cap 62.5/63 kVA of any make and type all as specified and directed by Engr-in-charge. |
| 147 | All as per srl item Sr No 75.00 here-in-before but for cap 20-40 KVA. |
| 148 | Supply only Rubber hose pipe set with clamp suitale for cap 62.5/63 kVA of any make and type all as specified and directed by Engr-in-charge. |
| 149 | All as per srl item Sr No 77.00 here-in-before but for cap 20-40 KVA. |
| 150 | Supply & pouring in sump/topping up of Engine oil of grade 15W-40/20W-50 in engine or replacement after thorougly draing out/cleaning of Engineoil sump complete all as specified and directed by Engr-in-charge. Make - Servo/Castrol/IOCL/HPCL |
| 151 | Material and labour in replacement of coolant for radiator of any make any type DG set at various loactions all as directed by Engr-in-charge |
| 152 | Supply & pouring of Electrolyte for lead acid battries in sealed container all as directed by Engr-in-charge |
| 153 | Disconnectingof radiator from engine of DG setsofcapacity 62.5/63 kVA, taking it to workshop for overhauling, cleaning, descaling with restore plus solution, welding and brazing as required for repair of water leaking, refixing it at site duly repaired all as directed by Engineer -in-Charge. |
| 154 | All as per srl Item 82.00 here-in-before but of Cap 20-40 KVA complete |
| 155 | M&L for Cleaning of fuel tank both internally & externally by removing all the dust/sediments etc. incl taking down the fuel tank if required, welding/patch work for any leakages in tank, writing of tank cap, date of cleaning and next due date of cleaning incl replacement of fuel cap and replacement of fuel pipe (tank to DG set) complete for Cap 62.5/63 kVA of any make & type all as specified and directed by Engr-in-charge. |
| 156 | All as per srl Item No 84.00 here-in-before but of Cap 20-40 KVA . |
| 157 | S & F in replacement of water pump assy of DG set cap62.5/63 kVA of any make & type all as directed by Engr-in-charge |
| 158 | All as per srl Item No. 86.00 here-in-before but of Cap 20-40 KVA . |
| 159 | Taking out FIP from DG set ofcap62.5/63 kVA of any make & type, transportation to authorised service centre for overhauling and re-calibration and re-fixing to DG set including replacement of necessary spare parts such as delivery valves, plunger \"O\" ring spring, Fuel injector pipe set of suitable number & length,etc. complete all as specified and as directed by Engr-in-charge. |
| 160 | All as per srl Item No. 88.00 here-in-before but of Cap 20-40 KVA . |
| 161 | Scrapping of old paint from DG set of any Make & type of capacity 62.5/63 kVA,preparation of old pained surfaces for repainting and Material and labour for spray painting to DG set of any capacity with synthetic enamelled paint of superior quality over a coat of red oxideafter scrapping the old paint, making the surface smooth with sand paper etc. writing letter SM No/MES No, DG capacity & other by paint or glossy tapes complete all as specified and directed by Engr-in -Charge |
| 162 | All as per srl Item No 90.00 here-in-before but of Cap 20-40 KVA . |
| 163 | Taking out unserviceable door lock incl all hinges of DG set canopy and supply & fixing new lock with keys and all hinges as per sample including welding work & MS sheet wherever required and making good to match with existing surface for each DG set complete all as directed by Engr-in-charge. (Note: Replacing UNSV door locks, hinges, welding work with MS sheet & painting work of one DG set will be measured as one job.) |
| 164 | Material and labour for replacement of MS coupling with new coulping rubber bush /rubber disc by taking coupling from engine and generator/alternator joint of62.5/63 kVA Cap DG set of any make & type complete all as specifies and as directed. |
| 165 | All as per srl item no 93.00 here-in-before but of cap 20-40 KVA |
| 166 | Supply and fixing in repair asbestos rope 6 mmdiawrapped over the exhaust pipe complete all as directed by Engr-in-charge. |
| 167 | Supply and fixing in repair anti vibration pads suitable for 63/62.5 KVA DG setcomplete all as specified and as directed by Engr-in-Charge. |
| 168 | All as per srl Item No 96.00 here-in-before but of cap20-40 KVA. |
| 169 | Material and labourforpanel board wiring in replacement with 4 sqmm S/C multistranded copper wire cable for 63/62.5 KVA capacityDG set, complete all as directed by Engineer -in- Charge |
| 170 | All as per srl Item No 98.00 here-in-before but of cap20-40 KVA. |
| 171 | Supply and fixing in replacement battery Charger 12 Volts, 6 amps, complete all as directed by Engineer -in-Charge. |
| 172 | Supply and fixing in replacementAVR (Automatic Voltage Regulator) of DG set of capacity62.5/63 KVA of any make & typeall as directed by Engineer-in-Charge. |
| 173 | All as per srl Item No 101.00 here-in-before but of cap20-40 KVA. |
| 174 | Material and labour in replacement Turbo charging unit for 63/62.5 kVA DG Set complete all as specified and directed by Engr-in-Charge. |
| 175 | Material and labour in replacement Oil pressure Guage by replacing of old onesuitable for 20-63 kVA DG set of any Make complete all as specified and directed. |
| 176 | Disconnecting incoming / outgoing cable connection from alternator of62.5/63 kVA DG set and taking out from DG set room checking carefully and transporting to auth workshop for repair and rewinding as per existing of alternator dismentling into parts and cutting the burnt/damage copper winding wire from alternator / stator cleaning slots and rewinding the stator/alternator with super enamelled copper winding wire of existing gauge & size and insulation paper etc complete varnishing of rewinded alternator replacement of carbon brush set bearing set etc complete and transporting the alternator to DG set room coupling with DG set and testing complete include water load test all as specified and directed by Engr-in-charge.(NOTE: All neccessary T&P for dismantling, transporting and installation cost is deemed in this work). |
| 177 | All as per srl Item No 105.00 here-in-before but of cap 20-40 KVA |
| 178 | Supply and fixing in repairs Battery lead acid 12 volt DC, 120 Ah to be fitted on DG set including connecting S/C copper leadof size 10 Sqmm dia with two nos of battery terminal complete all as specified and directed. |
| 179 | Supply and Fixing in replacement of controller including relays,PCBs & mimic visual displaycomplete with ON/OFF switches and phase indicators complete for62.5/63 kVA DG set of any make & type all as per specified and as directed. |
| 180 | All as per srl Item No 108.00 here-in-before but of cap20-40 KVA |
| 181 | S&F in replacement of ON load change over switch -AC 23 (Side Handle) 415 volt 50 HZ capacity 160 Amps, 25kA complete all as specified and directed. |
| 182 | S&F in replacement of ON load change over switch -AC 23 (Side Handle) 415 volt 50 HZ capacity 100 Amps, 16kA complete all as specified and directed. |
| 183 | S&F in replacement of copper tube (Thimbles) terminal heavy dutyof size 95 Sq.mm complete all as specified and directed. |
| 184 | S&F in replacement of copper tube (Thimbles) terminal heavy dutyof size 70 Sq.mm complete all as specified and directed. |
| 185 | S&F in replacement of Aluminium tube (Thimbles) terminal heavy dutyof size 150Sqmm complete all as specified and directed. |
| 186 | S&F in replacement of Aluminiumtube (Thimbles) terminal heavy dutyof size 120 Sq.mm complete all as specified and directed. |
| 187 | S&F in replacement of indicator lamp (LED type) fitting with neon lamp in three colour (Red/Green/Yellow) complete all as specified and directed. |
| 188 | M & L for Overhauling of DG set of any make & type upto 63 KVA by replacing the worn out parts and testing on load after completion of workincluding all spare parts as required at site for smooth functioning of DG set complete as pe all as specified and as directed by Engr-in-Charge. |
| 189 | Supply & fixing in replacementelectronic governor suitable for DG set of capacity uoto 63 KVA complete with electric actuator, electronic speed control unit and magnetic sensor all as specified and directedby Engr-in-Charge. |
| 190 | S&F in replacement of Exhaust system/ silencer For DG sets of capacity 20 to62.5/63 KVA as required at site for smooth functioning of DG set complete all as specified and as directed by Engr-in-Charge. |
| 191 | Supply, fixing and making connections in repairs Hour meters 220-240 V, AC suitable for any type & capacity DG sets complete all as specified and as directed by Engr-in-Charge. |
| 192 | S & F in replacement of Self starter 12/24 V, DC for diesel engine driven water cooled DG sets complete as pe all as specified and as directed by Engr-in-Charge. |
| 193 | Taking up or down GI tubing 15 mm dia bore including connections carefully,for relaying or removal to store complete all as specified and directed. |
| 194 | All as per srl item no 122.00 here-in-before but 20 mm dia bore. |
| 195 | All as per srl item no 122.00 here-in-before but 25 mm dia bore. |
| 196 | All as per srl item no 122.00 here-in-before but 40 mm dia bore. |
| 197 | All as per srl item no 122.00 here-in-before but 50 mm dia bore. |
| 198 | Supply and laying, fixing and testing of GI Pipe medium grade with all fitttings laid in trenches of size 15 mm dia complete all as specified and directed |
| 199 | All as per srl item no 127.00 here-in-before but 20 mm dia . |
| 200 | All as per srl item no 127.00 here-in-before but 25 mm dia. |
| 201 | All as per srl item no 127.00 here-in-before but 40 mm dia. |
| 202 | All as per srl item no 127.00 here-in-before but 50 mm dia. |
| 203 | Note:-The accepted amount will be arrived after deducting the Sch of credit i.e. Rs 86,209.45 and any other reduction if any from quoted amount. |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy