Tender For Electrical Works, Electrical Work Under Bp 2024-25 At Edd Salon, Name of Work: SCHEDULE OF RATES & QUANTUM OF WORKS COMPLETION IN INSTALLTION OF TAIL LESS UNIT( 500 AMP) FOR PROTECTION OF MEDIUM CAPACITY TRANSFORMERS (100 KVA) INSTALLED AT DEEH, SUCHI, MAU, BIRNAWAN, TIKARI, PEETAMBARPUR, MAJORGANJ, BHADOKHAR (2) 250 KVA INSTALLED AT NEAR S/S DEEH, OLD HOSPITAL, RAJEEV GANDHI CHAURAHA AND SUCHI CHAURAHA (3) BODY AND NEUTRAL EARTHING OF 250 KVA INSTALLED AT LALAPUR, ALI HASAN KA PURWA, ATAGANJ USARI AND 100 KVA T/F INSTALLED AT DOBHAN, KITHAWAN, GANESHGANJ, KESWAPUR. KAINALPUMP, GADDIPUR, KAPOORIPUR, RATASON, JHAPATTI KA PURWA, MULAYAMKHAN KA PURWA, KEWALPUR MAFI, SANDA SAIDAN, GADDIPUR, RAGHUPUR, AFSAR GANJ, RATANSO, KANJIHAR, AUNANISH, ATA NAGAR, MOHMDABAD, TERUHA, RAJAPUR CHAKBIBI, MADHAWPUR FATAK, BEWALI, REWALI, JODHI KA PURWA, MATKA (30 NOS) (4) BODY AND NEUTRAL EARTHING OF SMALL CAPACITY TRANSFORMERS INSTALLED AT DIFFERENT PLACES UNDER S/S DEEH/SUCHI UNDER BUSINESS PLAN-2024-25, IN GEOGRAPHICAL AREA OF EXECUTIVE ENGINEER, ELECTRICITY DISTRIBUTION DIVISION-SALON, RAEBARELI IN JURIDUCTION OF EXECUTIVE ENGINEER, ELECTRICITY DISTRIBUTION DIVISION- SALON, RAEBARELI. CORTAGE OF STOR ITEMS FROM ESC TRIPULA RAEBARELI TO DUMP SITE AND DUMP SITE TO WORK SITE ALONGWITH LOADING UNLOADING AND PROPER STACKING:- LT Cable PVC (1X400 sqmm) LT Cable PVC (3.5X120 sqmm) Earthing Complete (20X2500 MM, MS ROD AND 6SWQ G.I WIRE. 11 KV Composit Pin Insulators With Pins Dropper Channel (100X50X2028 MM) ERRECTION & LABOUR CHARGES:- Laying /Making/Fixing of LT Cable PVC (3.5X120 sqmm) as per RESSPO Norms. Laying /Making/Fixing of LT Cable PVC (1X400 sqmm) as per RESSPO Norms. Work for Earthing of small Capacity of 10/16/25/63 KVA T/F body and Neutral of Complete work as per resspo norms. Work for Installation/fixing of 11 KV Composit Pin Insulators The work for Earthing, Fensing and excavation of new Plinth size 2.00X2.00X1.50 for making outer wall of Plinth by 1st class brick work in Cement mortar of ratio1:6 of filling earth in Plinth and providing Ston ballast then plastering the top and all side of plinth wall with cement Corse and sand in ratio 1:4 and then proper spraying of water alongwith All materials & Labour for Mounting of 250 KVA T/Fs on Plinth alongwith fitting of all accessories,under BUSINESS PLAN 2023-24, as per RESPO Norms. Labour Charges for earthing of 250 KVA 11/0.4 KV Power Transformers- (03 Nos) and 100 KVA T/F - (27 Nos.) Total T/F 30 Nos, Completed for digging of 60 fit Borewell type pit (1.5-inch diameter) to install 60 fit long M.S. Pipe (60 fit long) with 1.5-inch diameter work followed by connection of M.S. Stirp 50X6 mm size for Suitable length to G.I. Pipe through proper welding ( Aluminium paint covering of welded joint) with tightening of nuts & bolts and fitting of spaces by homogeneous mixture of coke & sault against medium power transformer body and neutral earthing these includes connection of M.S Strip fot sepret common pit as there will be one pit of each earthing. All rewuired material will be provided by contractor. Clmap with nut and bolts for Dropper Channel, Material Provided By the Contractor. Work for Installation/fixing of All lug 120 sqmm Material Provided By the Contractor. Work for Installation/fixing of All lug 400 sqmm, Material Provided By the Contractor. Work for Installation/fixing of Tail Less Unit 500A, Material Provided by Contractor Work for Installation/fixing of Copper Z piece, Material Provided by Contractor