Tender for Supply Of Items As Per Schedule Of Requirements
Tender Overview
Project Description
Supply Of Supply Of Items As Per Schedule Of Requirementssupply Of Items As Per Schedule Of Requirements,Files Consisting Of Following Items In One Set: 1) Flat File 8 Inch Rough (Bastard- 203Mm), 2) Fla T File 8 Inch Second Cut (Smooth- 203Mm), 3) Half Round File 8 Inch Rough (Bastard- 203Mm), 4) Flat File 12 In Ch Second Cut (Smooth- 304Mm). One Set Consist Of 1 No. Of Each Item. Make- Thunder Bolt/ J.K/ Miranda [ W Arranty Period: 30 Months After The Date Of Delivery ] ] , Electric Hand Drill Machine Power Source- Corded Electric For Ms And Wall, Maximum Rotational Speed- 2600 Rpm, Voltage- 240V, Single Phase, Power- 500W (Input) And 250V (Output), Chuck Capacity- 1.5 Mm To 12Mm. Make- Bosch/ Decker/ Gsb-600 Or Similar [ Warranty Period: 30 Months After The Date Of D Elivery ] ] , Compact Flash Memory Card 128Mb For Speedometer Type Telpro-Z For Wag-9 As Per Spec: 341 0007400. Make- Aal Or Similar [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Lp Tool Box For Loco [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Hammer Box Complete And Fixing In Locomotives. [ Warranty Period: 30 Months After The Dat E Of Delivery ] ] , Telescopic Inspection Camera With Light For Taking Photographs, Articulating Borescope, Essenti Al Tools For Inspection And Repair, 1.0 Mp Cmos Sensor, Battery Capacity: 3000Mah, Wifi Display For Smartpho Ne, Length Of Camera Phone Tube: 5 Ft, Camera Is Ip67 Waterproof With 12-100 Mm Focal Distance, Bidirection Al Steering. Max Steering Angle 210, Bending Radius: 35Mm. Make- Teslong Or Similar [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Frequency Meter Fzq72 Din:400V(Ac) As Per Rcf Spec Edts 103 Rev-D Amd-7. Make- Ae/ Mu Ller [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Electric Shock Treatment And Management Chart Made From 19Mm Thickness Premium Sun Bo Ard Base And Multi Color Glossy Eco Print Sheet Pasted On It Framed In Thick Aluminium Frame. Displaying The Instructions For Electri
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender