| 1 | Site cleaning in the Lighthouse premises & along with the pathway including cutting grass, vegetation, uprooting of rank vegetation, sapling etc. and disposing the debris within a lead of 50m. Including supply of all labour, tools etc. complete as directed by the engineer in charge.. |
| 2 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under with cement mortar 1:4 (1cement: 4 coarse sand), including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all completeincluding a supply of all materials, labours, tools etc. complete as directed by the engineer incharge. |
| 3 | Painting two coats to the outside surface of the Lighthouse tower with approved quality Sy. Enamel paint in Black and white bands after cleaning and preparing the surface properly including the cost of materials, labour, tools etc. complete as directed by the engineer incharge. |
| 4 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary reparis to scratches etc. completeincluding a supply of all materials, labours, tools etc. complete as directed by the engineer incharge |
| 5 | Providing and applying white cement based putty of average thickness 1mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth etc. including supply of all materials, tools, labours etc. complete as directed by the engineer incharge. |
| 6 | Wall painting two coats with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour on existing white washed surfaces to give an even shade after removing white wash by throughly brushing the surface, scrapping , brooming, sand papering, cleaning all dirt & dust, preparation of surface with filling the holes by applying putty etc. whereever required includingsupply of all materials, labours, tools etc. complete as directed by the engineer incharge. |
| 7 | Painting two coats over previously painted doors & windows metal surfaces with 1st quality S.E.Paint of approved make(Asian/Berger/Shalimar) & colour to give an even shade after thoroughly brushing, scraping, brooming, sand papering, cleaning the surface of all dirt, dust & other foreign matter etc as directed including supply of all materials, labours, tools etc. complete as directed by the engineer in charge. |
| 8 | Finishing walls with 1st quality Premium Acrylic Smooth exterior paint with Silicone additives of required shade (Asian/ Snowcem/ Berger) on new work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) at all heights to give an even shade etc. wherever required including supply of all materials, labours, tools, scaffoldings etc. complete as directed by the engineer in charge. |
| 9 | Repairing and fixing swing type fully glazed single leaf aluminium window shutter with aluminium frame including all other Aluminium fixtures like Aluminium butt hinges, tower bolts, handles, hooks & eyes etc., fixing as per drawing including supply of all materials,labours,tools & plants and all other charges etc., complete as directed by the engineer in charge. |
| 10 | Minor repair to damaged doors and windows including replacing the damaged Al. hinges and all other fittings including carpentary work for easy opening and closing of shutters as directed including the cost of all materials. Labours, tools & plants and all other charges etc. complete as directed by the engineer in charge. |
| 11 | Providing and fixing bright finished brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete. |
| 12 | 300mmAluminium aldrop (300x16mm) |
| 13 | Providing and laying in position cement concrete of 1:2:4 (1cement: 2 coarse sand: 4graded stone aggregate 20mm nominal size) up to plinth level including laying, compacting, curing complete with all materials, tools, labours etc. as directed by the Engineer in charge but excluding the cost of formwork and reinforcement. |
| 14 | Cleaning of the interior and exterior chequerred tiles flooring of lighthouse tower with soap solution, removing vegetation, dirt, algea from the surfaces of tiles, including the cost of all materials, labours, brushes, broom, cleaning cloth etc complete as directed by the Engineer in charge. |