Tender For Construction work of ghats and pathways of Harichandan pond in Mohalla Chand Thok of Sumerpur Nagar Panchayat., 1 Dewataring of Nala pmping set before and during work including disel & operator for 8 hours a day. 2 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (In area of non-thorny jungle-A) 3 Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. S.I. No. 251 4 Supplying, laying and consolidation of coarse sand of approved quary & quality in foundationin compacted thickness of 10 Cm by hand rammer including cost of all materials, labour, T&P etc. required for porper completion of work as per direction of Engineer-in-charge. S.I. No.255 5 Cement concrete with 4cm (1/2) gauge approved stone ballast, approved coarse sand. cement in the proportion 1: 4 : 8 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. 6 RCC work with cementapproved coarse sand and 2cm. (3/4) gauge approved stone ballast in the proportion 1:2:4 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. As in item (283) above but in RCC T-beam and slab roof in1.1.5.3S.I. No.-288 7 Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured.SI No. 504 8 Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. 9 Supplying, laying and consolidation of granular material i.e. Stone Dust of approved quarry & quality in granular sub base (Blanket Coat) by 3-wheeled steel/vibratory power roller 8-10 tonne with required quantity of water to achieve the desired density after preparing the existing surface in proper camber, spreading the material in uniform layer, proper camber and required thickness of 15 Cm (compacted) including hire & fuel charges of power roller with driver, maintenance of barriers, caution posts, light at night and also including cost of all materials, labour, T&P etc. required for porper completion of work as per direction of Engineer-in-charge in - 10 Cement concrete with 4cm (1/2) gauge approved stone ballast, approved coarse sand. cement in the proportion 12 : 6 : 1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. 11 Providing and Laying of Rubble moulded Zig Zag InterlockingConcrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. 12 Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302Chapter 14 (14.6) 13 Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragmentweighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 14 Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. 15 12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 2 part of find sand of 1.25 fineness modulus.(1:4) 16 Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work. 17 Raised pointing with cement and fine sand of 1.25 fineness modulus mortar on brick work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work 18 2.5 cm (1) thick 1:2:4 plain cement concrete floor with cement approved coarse sand and 2cm (3/4) graded approved stone laid in panels finished with 3mm (1/8) floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified over and including 8cm (3) thick base concrete consisting of cement fine sand of 1.25 fineness modulus and brick ballast 4 cm. (1½) gauge in the proportion of 1:4:8 and removing any overlapping mortar at the joints ofthe panels if any and giving them a uniform finish including supply of all materials, labour and tools and plants etc. required for proper completion of the work. S.I. No. 601(a) 19 Providing and fixing of 100 mm. dia A.C. pipes in weep holes 20 Kota Stone work (machine cut edges Veneer work) for wall lining upto 10 m height,backing filled with a grout of 12 mm thick cement mortar 1:3 (1 Cement : 3 coarse sand) and jointed with cement mortar 1:2 (1 cement : 2 stone dust), including rubbing and polishing complete. (To be secured to the backing and the sides by means of cramps and pins which shall be paid for separately). 21 Providing and placing in position precast reinforced cement concrete waffle units, square or rectangular, as per design and shape for floors and roofs in 1:1½:3 (1 Cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 10 mm nominal size), including flush or deep ruled pointing at joints in Cement mortar 1:2 (1 Cement : 2 Fine sand), making necessary holes of required sizes for carrying through service lines etc., providing steel hooks for lifting etc, form work in precasting, handling, hoisting, centering and erection complete for all floor levels but, excluding the cost of reinforcement. 22 Supply of M.S. Grill of a approved quality and drawing made of flat iron not bigger then 20x4 mm size including supply of materials, fabrication, labour, T&P and also one coat of red oxide paint complete in all respect as per direction of Engineer-in-charge for proper completion of work at site. @ 25 Kg/m2(For Abadi Side)(DSR. 10.25.1-172.6*0.735*106/107)*100 23 Supply and Installaction of Solar Light Panal with Pillar on Both side of Inter Locking at 15 Mtr. Distance. 24 Supply and Plantataion of Plant Around the Talab 25 Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. (S.I. No.251) 26 Sand filling in plinth including supply of necessary quantity of sand approved quarry from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. 27 Cement concrete with 4cmgauge approved stone ballast, approved coarse sand. cement in the proportion 1:4:8 including supply of all materials,labour and tools and plants etc. required for proper completion of the work as per direction of the Engineer. 28 Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. S.I. No.-305 29 12 mm thick plaster on brick work not less than 10 mm with cement mortar in proportion 1:4 cement and fine sand of 1.25 F.M. including cost of all material labour, T&P etc. required completion of the work as per direction of the Engineer-in-charge. (SI.No.584) 30 Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.