|
| 1 | Preventive maintenance of 40 HP to 60 HPMotors & its associated control modules of AC Ventilation Systems. |
| 2 | Preventive maintenance of 15 HP to 30 HP Motors & its associated control modules of AC Ventilation Systems. |
| 3 | Preventive maintenance of 1 HP to 12.5 HPMotors & its associated control modules of laboratories and AC Ventilation Systems of RCL. |
| 4 | Preventive maintenance ofPower distribution panel / Motor Control Centre |
| 5 | Overhauling of 40 HP to 60 HP motors in ACV plant |
| 6 | Overhauling of 15 HP to 30 HP motor in ACV plant |
| 7 | Overhauling of 1 HP to 12.5 HP motorsinACV plant |
| 8 | Calibration of Thermal Over load relay forvarious motors used in ACV plant & other systems. |
| 9 | Maintenance of Earth Pits including supply of Sodium Bentonite, and measurement of Earth Pit Resistance as per the specification. (Refer Sec VI (MNC), Clause No.2). |
| 10 | Supply and installation of Philips 2\" X 2\" LED Lights Model RC099V G2 LED36/840 PSU W60L60 OC. |
| 11 | Supply and installation of 2x 20 W 4\" LED luminaire with suitable sheet steel box type batten with powder coated finish(IGP162LT8-16 Twin holder fixture with 2 Nos. of 4 FT. LED Lamp LT8-865-2) of crompton make or equivalent |
| 12 | Supply and installation of 16 pin FEEDTHROUGH Allied connector SET, Female connector MS 3106F 28L-61S & Male connector MS 3100E 28L-61P in 12 mm thick SS Flanges Glove Boxes. |
| 13 | Surveillance of Emergency lighting, blackout lighting system |
| 14 | Surveillance and performance check of UPS system up to 10 kVA |
| 15 | Identification & rectification of fault in 10W to 40W LED/FTL luminaries including replacement of Lamps/starters/holders (Refer Sec VI (MNC), Clause No.4). |
| 16 | Identification of fault and Replacement of 5A to 16A switches/sockets, telephone jacks, 20A Modular motor starters, Modular plates of different sizes in Flush/Concealed type MS switch boxes, 3/4pole MCBs up to 63 Amps in labs and low bay areas (Refer Sec VI (MNC), Clause No.4). |
| 17 | Identification and rectification of shunt or series fault in lighting or power circuit wiring in labs / building as per scope of work –minor fault |
| 18 | Identification and rectification of shunt or series fault in lighting or power circuit wiring in labs / building as per scope of work- major fault |
| 19 | Attending to Fuse off calls in lighting circuits/Power Points/ Power boards (Refer Sec VI (MNC), Clause No.22). |
| 20 | Overhauling and servicing of ceiling /pedestal/wall mounting / Exhaust/Air circulator fans (single phase) as per the Scope of work. (Refer Sec VI (MNC), Clause No.14). |