| 1 | fo|qr forj.k [k.M&’k’Ve] cqyUn”kgj ds dk;Z{ks= esa fo0fo0m0[k0&izFke] vkSjxkackn@f}rh;] VkaM+k] cqyUn”kgj ds vUrxZr iw.kZ tek ;kstuk en esa izkUrh; [k.M yksd fuekZ.k foHkkx] ty thou fe”ku@vU; ljdkjh foHkkxksa }kjk izsf’kr vkosnukuqlkj la;kstu fuxZr djus gsrq ykbZu fuekZ.k vkfn dk;ZA |
| 2 | Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms. |
| 3 | PCC Pole 8.5 mtr Long. |
| 4 | S.T Pole 11/13 Mtr. Long |
| 5 | Carriage of All line Material from store center BSR to at site ACSR Weasel conductor, ABC 4 condictor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc. |
| 6 | Erection of Single pole support including complete IT fittings with channelas per RESPO 5 manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 7 | Erection of 11/13Mtr. STP Double pole/Scation Pole support including complete IT fittings as 6 per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 8 | Erection of 8.5 Mtr. Pcc Double pole/Scation Pole support including complete IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 9 | Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8=30x3030 cms. including the cost of cement, sand, birck hallast/stone ballast, etc. as 8 per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 10 | Grouting of Double pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8=30x3030 cms. including the cost of cement, sand, birck ballast/stone 9 ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 11 | Cutting/drilling/fabrication of channel and angleWelding of MS Angle iron for making 10 guarding angle size 65x65x6/50x50x6 mm including the work of fixing the bracket on PCC/ST pole for construction of the line. |
| 12 | Carriage and mounting of 10/25/63 KVA T/F fallowings from ESC. BSR to pit site on 11 kachcha pacaa road including loading and unloading chagres at both ends, requried for proper completion of work, distance about to 60 Kms. |
| 13 | Shifting of 25/63/100 KVA T/F |
| 14 | fixing of 11 Kv Stay rod with Stay wire in proper way with Nozelling |
| 15 | Grouting of 11 Kv Stay rods |
| 16 | Laying, sagging. Stringing and binding and jumpering of ACSR Weisal, rabbit, dog newly erected pole as per RESPO manual and as per direction of supervising engineer. It |
| 17 | Fixing of Earthing Complete |
| 18 | ACSR rabbit conductor |
| 19 | Received back old and use ACSR Weasel/rabbit/LT AB Conductor |
| 20 | Received back old and use ms iron scarpe |
| 21 | Fixing of 11 Kv DP Fues Set |
| 22 | Fixing of Droper Channel/Top Chennal/T-off chennel |
| 23 | Fixing of 11 Kv Pin Insilator with pin and nut |
| 24 | Fixing of 11 Kv Disc Insilator with fitting |
| 25 | Fixing of TF Base Angle/bracing |
| 26 | Laying/sagging/strenghting of overhead XLPE Cable 3*185 |
| 27 | Guarding of Gl wire swg |
| 28 | GI PIPE FIXING AND PROVIDING |
| 29 | Fixing of 11 Kv Cross Arm |
| 30 | Laying of 11 kv XLPE cable of various size via Cutt-open method. |
| 31 | Laying of 33 kv XLPE cable by cutt-open method. |
| 32 | Laying of 33 kv XLPE cable with HDPE Pipe Method |
| 33 | Making/filling of 33 kv jointing kit 3*185mm etc. (1/D & O/D) |
| 34 | The folloing material is required to be Providing & Fixing by contractor |
| 35 | Danger Board with clamps |
| 36 | Holding clamp. |
| 37 | F-Bracket with clamps |
| 38 | Barbed Wire |
| 39 | MS nut & Bolt off size. |
| 40 | providing and Fixing of telness unit with proper grouting of Required and Earthing. |