Tender For Ctsb And Ctb Work Under Non-Bituminous Work In First Phase On 24M Wide 18.00 M And 12.00 M Road In New Jail Road Bhoomi Vikas Evam Grihsthan Yojna Mohanlalganj Lucknow, Mohanlalganj-Uttar Pradesh
TDR : 45761576
Tender Notice
BOQ
Expired
Mohanlalganj
Uttar Pradesh
Tender For Ctsb And Ctb Work Under Non-Bituminous Work In First Phase On 24M Wide 18.00 M And 12.00 M Road In New Jail Road Bhoomi Vikas Evam Grihsthan Yojna Mohanlalganj Lucknow
Name of Work:CTSB and CTB work under non-bituminous work in first phase on 24m wide 18.00 m and 12.00 m road in New jail road bhoomi vikas evam grihsthan yojna Mohanlalganj Lucknow
Sl. No.
Item Description
1
Dag belling 15 cm (6\") deep in one line aligned, with flags and jhandis as directed by Engineer in incharge. Dag belling shall be two each for each painted surfaces/tile path. Therefore total number is 1+1=2
2
Lime Stabilisation for Improving Sub-gradeProviding, laying and spereading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread soil in a place with soil stabilizer with 2% slaked lime using binder, spreader machine, having minimum content of 70% CaO, grading with motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved sub-grade. [clause 402(i)]
3
Cement Treated Crushed Stone Sub Base (Plant mix method)Construction of granular sub-base by providing graded Material, mixing with cement in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with Mechanical Paver on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per [clause 403A]
4
Cements Treated Crushed Stone Base (Plant mix method)Providing and laying, spreading and compacting graded stone aggregate mixed with cement to crushed stone treated base specification including premixing the material with water OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (morth 406)
5
Edging with straight over burnt bricks laid dry lengthwise including excavation, refilling, consolidation with a hand packing and spreading nearly surplus earthwithin a lead of 50m.(SI No-11.15, Morth&H)
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.