|
| 1 | M&L in replacement unserviceable hermiticallysealed compressor of refrigerator 310/285 litres capacity with fresh new uncut sealed compressor including suitable relay and over load with new sealed unit as per the company scheme supplied by the manufacturer complete including flushing out system, checking and rectification of leakage,gas charging, complete and testing after completion of work at MES Store yard for satisfactory function complete all as specified and directed.Note:-(i)The rate quoted by the contractor shall be inclusive of all charges like transportation, fitting etc complete with necessary guarantee period as per company terms and conditions.(ii)The new unit will be purchased from authorized dealer. |
| 2 | M&L in replacement unserviceable hermiticallysealed compressor of refrigerator 165/180/196litres capacity with fresh new uncut sealed compressor including suitable relay and over load with new sealed unit as per the company scheme supplied by the manufacturer complete including flushing out system, checking and rectification of leakage,gas charging, complete and testing after completion of work at MES Store yard for satisfactory function complete all as specified and directed.Note:-(i)The rate quoted by the contractor shall be inclusive of all charges like transportation, fitting etc complete with necessary guarantee period as per company terms and conditions.(ii)The new unit will be purchased from authorized dealer. |
| 3 | M&L in replacement unserviceable hermiticallysealed compressor of refrigerator 240/260litres capacity with fresh new uncut sealed compressor including suitable relay and over load with new sealed unit as per the company scheme supplied by the manufacturer complete including flushing out system, checking and rectification of leakage,gas charging, complete and testing after completion of work at MES Store yard for satisfactory function complete all as specified and directed.Note:-(i)The rate quoted by the contractor shall be inclusive of all charges like transportation, fitting etc complete with necessary guarantee period as per company terms and conditions.(ii)The new unit will be purchased from authorized dealer. |
| 4 | S&F in repairs relay suitable for 260/280 litres capacity refrigerator complete all as specified and directed.Make:- Renutrol/Shriram/Anpurna/klixon |
| 5 | S&F in repairs relay suitable for 165 litres capacityrefrigerator complete all as specified and directed.Make:- Renutrol/Shriram/Anpurna/klixon |
| 6 | S&F in repairs thermostat automatic `R\"frost with knob suitable for 165/286/310 litres capacity refrigerator complete all as specified and directed.Make :-Anpurna/Indofos |
| 7 | S&F in repairsfreezer assembly complete with screw, jointing of tubes etc. and testing of capacity 286/310 litres refrigerator complete all as specified and directed. |
| 8 | S&F in repairs freezer assemblycomplete with screw, jointing of tubes etc. and testing of capacity 165/175 litres refrigerator complete all as specified and directed. |
| 9 | S&F 15 watt lamp with lamp holder suitable for upto 300Ltr capacity refrigerator complete including taking down old unsv lamp with holder complete all as specified and directed. |
| 10 | S&F in replacement of condenser coil unit with necessary fixing arrangements and testing suitable for 285/310 Liters capacity refrigerator complete all as specified and directed. |
| 11 | S&F in replacement of condenser coil unit with necessary fixing arrangements and testing suitable for 165/170/180 Liters capacity refrigerator complete all as specified and directed. |
| 12 | M&L flushing out system , checking and rectification of leakages if any and make it serviceablegas charging with refrigerant R-12/R-134A or as per actual requirement, oil charging complete in refrigerator of capacity 286/310 litres complete all as directed & with entire satisfaction of Engineer-in-Charge.Note:-Gas charging will be measure and paid under relevant item separately. |
| 13 | M&L flushing out system , checking and rectification of leakages if any and make it serviceable gas charging with refrigerant R-12/R-134 A or as per actual requirement, oil charging complete in refrigerator of capacity 165/180 litres complete all as directed & with entire satisfaction of Engineer-in-Charge.Note:-Gas charging will be measure and paid under relevant item separately. |
| 14 | M&L flushing out system , checking and rectification of leakages if any and make it serviceable gas charging with refrigerant R-12/R-134 A or as per actual requirement, oil charging complete in refrigerator of capacity 165/180 litres complete all as directed & with entire satisfaction of Engineer-in-Charge.Note:-Gas charging will be measure and paid under relevant item separately. |
| 15 | Supply and charging of freon gas R-12 for refrigerator, deep freezer complete all as specified and directed. |
| 16 | Supply and charging of freon gas R-22 for Air conditioner complete all as specified and directed. |
| 17 | Supply and charging of freon gas R-134A/410Afor Air Conditioners or as per site requirement complete all as specified and directed. |
| 18 | S&Fin replacement of door gasket of best quality suitablefor up to 286 liters capacity refrigerator complete as per manufacturer\"s instruction complete all as specified and directed. |
| 19 | S&Fin replacement of door handle of best quality suitablefor up to 286 liters capacity refrigerator complete as per manufacturer\"s instruction complete all as specified and directed. |
| 20 | S&Fin replacement bottle self of best quality suitablefor up to 286 liters capacity refrigerator complete as per manufacturer\"s instruction and as directed by Engineer-in-Charge. |
| 21 | S&Fin replacement of vegatable tray of best quality suitablefor up to 190/286 liters capacity refrigerator complete as per manufacturer\"s instruction and as directed by Engineer-in-Charge. |
| 22 | S&Fin replacement ofcabinate shelves of best quality suitablefor up to 286 liters capacity refrigerator complete as per manufacturer\"s instruction and as directed by Engineer-in-Charge. |
| 23 | S&Fin replacement crisper glass of best quality suitablefor up to 286 liters capacity refrigerator completeas per manufacturer\"s instruction and as directed by Engineer-in-Charge. |
| 24 | S&Fin replacement door lock of best quality suitablefor up to 286 liters capacity refrigerator completeas per manufacturer\"s instruction and as directed by Engineer-in-Charge. |
| 25 | Repair to unserviceable/burnt stablizer of 0.5KVA to 5 KVA capacity complete including replacement of knobs, rewinding of burnt transformer etc complete all as specified and directed. Note : The other item like time delay relay, over load relay etc shall be measured and paid seprately as supply only. |
| 26 | Supply only time delay relay 500 volts complete all as specified and directed. |
| 27 | Supply only over load relay 25-40 Amp complete all as specified and directed. |
| 28 | M&L servicing /overhauling of Split/Window/Tower type Ac unit of capacity1.5/2.0/2.5 Ton including painting to outer cover and components with two coats of synthetic enameled paintof colour as directed) complete including following:-(a) Cleaning and descaling of condensing unit and cooling coil with caustic soda mixed water and air blower and taking out all dirt /sludge etc. all as directed by EIC.(b) Greasing / oiling of blower fan motor.(c) Change the defective parts of AC likecondensar fan motor, fan balt, blower/relay/PCB card/thermostate/copper pipe/heating assembly/capacitor/ Chargingthe gas as required to full fill the rated cooling effect etc, if change during servicing then same shall be measured and paid separately. |
| 29 | M&L in replacement unserviceable5 Star Hermetically cut sealed compressor of Tower type ACs 2.5 TR capacity with new uncut sealed hermetically compressor unit supplied by the manufacturer complete unit including wiring as required to unit with flushing out system checking and rectification of leakage, gas charging complete and testing after completion of work at MES store yard for satisfactory functioning complete all as specified and directed. NOTE:- (i)The rate quoted by the contractor shall be inclusive of all charges like transportation, fitting etc complete with necessary guarantee period as per company terms & conditions |
| 30 | M&L in replacement unserviceable5 Star Hermetically cut sealed compressor of Split ACs 2.0 TR capacity with new uncut sealed hermetically compressor unit supplied by the manufacturer complete unit including wiring as required to unit with flushing out system checking and rectification of leakage, gas charging complete and testing after completion of work at MES store yard for satisfactory functioning complete all as specified and directed.NOTE:- (i)The rate quoted by the contractor shall be inclusive of all charges like transportation, fitting etc complete with necessary guarantee period as per company terms & conditions. |
| 31 | Material and labour in replacement of unserviceable5 Star Hermetically cut sealed compressor of Split ACs 1.5 TR capacity with new uncut sealed hermetically compressor unit supplied by the manufacturer complete unit including wiring as required to unit with flushing out system checking and rectification of leakage, gas charging complete and testing after completion of work at MES store yard for satisfactory functioning complete all as specified and directed. NOTE:- (i)The rate quoted by the contractor shall be inclusive of all charges like transportation, fitting etc complete with necessary guarantee period as per company terms & conditions.(ii)The new compressor unit will be purchased from authorized dealers only as perexisting make and model |
| 32 | S&F in replacement swing blade motor suitable for 1.5/2.0 TR Split AC/ Tower AC complete all as specified and directed.Note: Sample needs to be verified, before using at site.Make:- LG/Voltas/Samsung |
| 33 | S&F in replacement Indoor AC Blower fan suitable for 1.5/2.0 TR Split AC/ Tower AC complete all as specified and directed.Note: Sample needs to be verified, before using at site.Make:- LG/Voltas/Samsung |
| 34 | S&F in replacement Indoor AC Blower motor suitable for 1.5/2.0 TR Split AC/ Tower AC complete all as specified and directed.Note: Sample needs to be verified, before using at site.Make:- LG/Voltas/Samsung |
| 35 | S&F in replacement Outdoor Fan motor suitable for 1.5/2.0 TR Split AC/ Tower AC complete all as specified and directed.Note: Sample needs to be verified, before using at site.Make:- LG/Voltas/Samsung |
| 36 | S&F in replacement Outdoor Fan motor Capacitor suitable for 1.5/2.0 TR Split AC/ Tower AC complete all as specified and directed.Note: Sample needs to be verified, before using at site.Make:- LG/Voltas/Samsung |
| 37 | S&F in replacement Indoor Cooling Coil suitable for 1.5/2.0 TR Split AC/ Tower AC complete all as specified and directed.Note: Sample needs to be verified, before using at site.Make:- LG/Voltas/Samsung |
| 38 | S&F in replacement to outdoor Condensor Coil suitable for 1.5/2.0 TR Split AC/ Tower AC complete all as specified and directed.Note: Sample needs to be verified, before using at site.Make:- LG/Voltas/Samsung |
| 39 | S&F in repair AC Indoor unit Main Board (PCB Card) with display unit suitable for 1.5/2.0 TR Split AC/ Tower AC complete all as specified and directed.Note: Sample needs to be verified, before using at site.Make:- LG/Voltas/Samsung |
| 40 | S&F in replacement AC Indoor unit Drain water pipe suitable for 1.5/2.0 TR Split AC/ Tower AC of any make and of any type, and also making good the entire surface as it was before doing job complete all as specified and directed.Note: Sample needs to be verified, before using at site.Make:- Prince/Supreme |
| 41 | S&F in replacement copper pipe of size 1/4 \" complete with 13mm insulation from outdoor unit to indoor unit including soldering and brazing complete all as specified and directed. |
| 42 | S&F in replacement copper pipe of size 1/2 \" complete with 13mm insulation from outdoor unit to indoor unit including soldering and brazing complete all as specified and directed. |
| 43 | S&F in replacement copper pipe of size 3/8 \" complete with 13mm insulation from outdoor unit to indoor unit including soldering and brazing complete all as specified and directed. |
| 44 | S&F in replacement copper pipe of size 5/8 \" complete with 13mm insulation from outdoor unit to indoor unit including soldering and brazing complete complete all as specified and directed. |
| 45 | S&F in repairs heating assy for Air Conditioner capacity1.5/2 Ton complete all as specified and directed. |
| 46 | S&F in repairs indoorAir Filter for Air Conditioner of capacity 1.5/ 2T complete all as specified and directed. |
| 47 | S&F in repairsrunning capacitor clip type of cap. 36 MFD, 240 volts 50 cycles for window type/Split typeair conditioner 1.5 Ton capacity complete all as specified and directed.Make:- Escop/Kell/Tesla/Sharda |
| 48 | S&F in repairsstarting capacitor clip type of cap. 80-100 MFD,440 volts 50 Hz for window type /Split type air conditioner 1.5 ton capacity complete all as specified and directed.Make:- Kell/Tesla/Sharda/Epcos |
| 49 | S&F in repairsrunning capacitor clip type of cap. 45MFD, 240 volts 50 cycles for Split /window type air conditioner 2 Ton Capacity complete all as specified and directed.Make:- Epcos/Kell/Tesla/Sharda |
| 50 | S&F in repairs starting capacitor clip type of cap. 100-120 MFD,440 volts 50 Hz for window type/split typeair conditioner 2 Ton capacity complete all as specified and directed.Make:- Kell/Tesla/Sharda/Epcos |
| 51 | S&F in repairscapacitor 4 Mfd in split type AC complete all as specified and directed. |
| 52 | S&F in repairs capacitor 6 MFD in split type AC complete all as specified and directed.Make: Epcos/texla |
| 53 | S&F in repairs capacitor 2.5 MFD in split type AC complete all as specified and directed.Make:Epcos/texla |
| 54 | S&F in repairs valve of any size (1/2 \", 1/4 \" 3/8\"and 5/8 \")for split type of capacity 1.5/2/2.5 TRin split type AC complete all as specified and directed. |
| 55 | S&F in repairs thermostat switch suitable for 2 ton /1.5 ton capacity air Conditioner complete all as specified and directed. |
| 56 | S&F in repairs relay suitable for 2 ton/1.5 ton capacity Air Conditioner as per sample complete all as specified & directed. |
| 57 | S&F in replacement of multi purpuse refrigerator base stand of best quality suitable for upto 300Ltr complete all as specified and directed. |
| 58 | Supplying and re-charging of refrigerant Gas R-22in AC Plant after detection of leakage & rectification of same in the system by using Carbon Di-oxide Gas and flushing the complete system thoroughly with Nitrogen gas, complete all as specified and directed .Note:-(i) Gas shall be brought by the contractor at Site from authorized Dealer/Manufacturers in sealed cylinders of standard packingsand re-filling shall be done in the presence of rep of Deptt. The empty cylinders after using the gas brought shall be returned to the contractor for payment purpose, only gas to the required extent used for charging shall be considered.(ii) The unit rate inserted is being to be inclusive of the cost of nitrogen gas used for leakage test and pressure test prior to filling/ charging of gas R-22 |
| 59 | Supply and re chargingcompressor oil (Non-freezing) in AC plant, complete all as specified and directed. |
| 60 | Descaling the condenser by recommended chemical cleaning agent by soaking method, disconnection condenser from the system by taking out nuts bolts, studs 2 Nos valves and MS/GI pipe line form both sides cover, cleaning each tube with nylon brush, flushing with alkaline solution connecting back both side cover including replacing leather gasket 4mm thick for following capacities of condensers suitable for AC plant capacities installed, complete all as specified and directed. |
| 61 | Descaling the Chillerby recommended chemical cleaning agent by soaking method, disconnection condenser from the system by taking out nuts bolts, studs 2 Nos valves and MS/GI pipe line form both sides cover, cleaning each tube with nylon brush, flushing with alkaline solution connecting back both side cover including replacing leather gasket 4mm thick for following capacities of condensers suitable for AC plant capacities installed, complete all as specified and directed. |
| 62 | Descaling the AHU Cooling Coilby recommended chemical cleaning agent by soaking method, disconnection condenser from the system by taking out nuts bolts, studs 2 Nos valves and MS/GI pipe line form both sides cover, cleaning each tube with nylon brush, flushing with alkaline solution connecting back both side cover including replacing leather gasket 4mm thick for following capacities of condensers suitable for AHU capacities installed, complete all as specified and directed. |
| 63 | Dismantling of worn out part of FRP cooling tower of capacity 60 TR,cleaning of water tanks and body of cooling tower to make the cooling tower functional and serviceable in all respect including rectification of minor leakages from the cooling tower with M Seal adhesive, complete all as specified and directed. |
| 64 | Supply & fixing side cover jalli for cooling tower for capacity 60 TR in replacement as per existing size and pattern, complete all as specified and directed. |
| 65 | Repair to heating unitof AC plant and change the burnt panel incl complete wiring and change the unserviceable power contactor, copper wore, Power relay, Phase indicator LED type lamp, amp meter, voltmeter and electric control panel complete. |
| 66 | Supply and fixtop protector cover to the CT fan motor at the top of the coolingtower made of GI sheet20 SWG, conical shape including flat iron of required size complete to protect the CT fan motor form rain water, complete all as specified and directed. |
| 67 | Supply & Fix metallic viscose fine filter in replacement made out of GI wire mesh interspaced with two crimp layers and three flat layers and housed in 2\" deep metal frame efficiency 65% as per existing size and pattern for AC Plant air handling unit at signal centre complex, complete all as specified and directed. |
| 68 | Supply & Fixwater pressure gauge 100 mm dia range 0-300 Lbs/Sq inch , complete all as specified and directed. |
| 69 | Supply & Fixair grills made out of GI sheet as per existing size and pattern complete with necessary nuts, bolts, clamps and MS frame made out of angle iron of required size damper for opening and closing of grills, complete all as specified and directed. |
| 70 | Supply & FixCast iron butterfly valve of size 100 mm dia (ISI Mark), complete all as specified and directed. |
| 71 | Supply & Fixcast iron butterfly valve of size 80 mm dia (ISI Mark), complete all as specified and directed. |
| 72 | Supply & Fix cast iron balancing valve of size 80 mm dia (ISI Mark), complete all as specified and directed. |
| 73 | Supply & Fixcast iron \"Y\" Strainer of size 80 mm dia (ISI Mark) complete all as specified and directed. |
| 74 | Supply and Fix in replacement 3 Way motorised valve with actuator motor complete in all respect.Size :80mmMake: Honeywell/ Siemens/Emerson |
| 75 | Supply & Fixbearing set (set of Bearings) (ISI Mark) for AC Plant of capacity 60 TR, complete all as specified and directed. |
| 76 | Supply & Fixgasket set for AC Plant, complete all as specified and directed. |
| 77 | Supply & Fix filter for AC Plant, complete all as specified and directed. |
| 78 | Supply & Fix power contactor of rating 25 amp 4 pole complete all as specified and directed. |
| 79 | Disconnecting electric connection of centrifugal pump set, 10 HP, electric dirven, three phase, 415 volts, and taking out from AC Plant transporting the same to work shop, dismentaling the pump set, re-winding the motor with suitable size of cooper enamalled wire, change the bearings , change of shaft if required, change the impalar if required etc, re-assembling the same transport from work shop to site, re-fixing in same position, making etecric connection and testing complete all as specified and directed.Note:- All defective parts deemed to be included in repair cost. |
| 80 | Disconnecting electric connection of monoblock pump set, 5 HP, electric dirven, three phase, 415 volts, and taking out from AC Plant transporting the same to work shop, dismentaling the pump set, re-winding the motor with suitable size of cooper enamelled wire, change the bearings , change of shaft if required, change the impalar if required etc, re-assembling the same transport from work shop to site, re-fixing in same position, making etecric connection and testing complete all as specified and directed.Note:- All defective parts deemed to be included in repair cost. |
| 81 | Supply only MCCB415V, 16KA, 4 pole of rating 125A complete all as specified and directed.Make: L&T/Schinder/ABB |
| 82 | Supply only MCCB415V, 36KA, 4 pole of rating400A complete all as specified and directed.Make: L&T/Schinder/ABB |
| 83 | Repair/Replacement to Heating element of washing machine complete all as specified and directed. |
| 84 | Supply and fix Air Curtain Motor of suitable capacity as per site requirement and sample approved by GE complete all as specified and driected. |
| 85 | Disconnecting electric connection of washing machine Motot 3/5 HP, electric dirven, three phase, 415 volts, and taking out from Laundary plant transporting the same to work shop, re-winding the motor with suitable size of copper enamelled wire, change the bearings , change of shaft if required etc, re-assembling the same transport from work shop to site, re-fixing in same position, making etecric connection and testing complete all as specified and directed.Note:- All defective parts deemed to be included in repair cost. |
| 86 | M&L in replacement for water inlet control valve, as per sample approved, complete all as specified and directed. |
| 87 | M&L in replacement for Printed circuit board of washing machine , as per site requirement, complete all as specified and directed. |
| 88 | M&L dry tumbler/Washer/Hydro Extractor/ Dry cleaning unit of any capacity including painting to outer cover and components with two coats of synthetic enameled paintof colour as directed) complete including following:-(b) Greasing / oiling of fan/ motor/Bearings etc as instructed by Engr-in-charge..(c) Change the defective parts of Plant likeBelt Pulley, Heating elements, Wiring PCB etc, if change during servicing then same shall be measured and paid separately. |
| 89 | M&L in replacement for Belt and Pulley set as per site requirement, and sample approved, complete all as specified and directed. |
| 90 | M&L in replacement for Drum Support Rollers set as per site requirement, and sample approved, complete all as specified and directed. |
| 91 | M&L in replacement for Blower fan as per site requirement, and sample approved, complete all as specified and directed. |
| 92 | Supply and Fixing DOL Starter complete as per site requiremennt and sample approved. |
| 93 | Supply and fixingin replacement sheet metal enclosures with socket, plug top and MCBs single pole and neutral enclosures with a two pin and earth plug and socket complete with one single pole MCB 32 Amps240 Volts complete all as specified and directed. |
| 94 | M&L in replacement for sub main wiring with proper colour coding, insulated, unsheathed, multistranded, copper conductor FRLS, cable of 2 run 10 Sq mm for phase and neutral and one run of 10.0 Sq mm for earth wire unsheathed, multistranded, copper conductor FRLS, drawn through the medium grade ISI mark PVC concealed conduit/surface casing capping fixed on wall. Two runs of cable for phase/neutral and one run of cable for earth will be measured and paid as one unit length complete all as specified and directed. Note : Wiring shall be done in proper colour coding.Note: Cutting chases on the wall whereever required is deemed to be included in unit rate quoted. |