| 1 | 1 :-Removingdoorsandwindowswithframesandstackingthematerialsasdirectedwithall leads, lifts etc. complete. |
| 2 | 2 :-Removing cement tiles, or marble or polishedshahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete |
| 3 | 3:-Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. |
| 4 | 4:-Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. |
| 5 | 5 :-Providing and laying in situ cement concrete of 1:4:8 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work, compacting and curing etc. complete. (with reversible drum type mixer with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) |
| 6 | 6 :- Providing andfixing in position(as per 1868 / 1982) Alluminium sliding window of three tracks with rectangular pipe 95 x 38.10 x 0.90 mm at weight 0.637 Kilogram/One Running Metre. with window frame |
| 7 | 7 :-Providing and fixing mild steel grill work for windows, ventilators etc. 20 Kilogram/ One Square Metre asperdrawing including fixtures,necessarywelding andpainting withone coatsof anticorrosive paint and two coats of oil painting complete. |
| 8 | 8:-Providing & Fixing in position, Fabric wrapped Compressed polyester fibre nonwoven 9mmpanels above the wood wool board panelling or existing sal wood frame, using adhesive, as per Architectural & Acoustical Design & Instructions & Complete in all aspects.including all materials labour,finishing etc complete |
| 9 | 9:-Providingandfixinggreenmarbleof18to20mmthickfordoorframe/dado/window boxing etc. On C.M. 1:6 including filling joints with polymer base filler nosing / moulding the sharp edges wherever necessary, curing,etc. complete. |
| 10 | 10:-Providing and fixing 3.5 to 4 mm thick Veneer finish wall Panaling made out of 50 x 25 mm (finished size) C.C.T.W. frame work or size of 600 x 600 mm center or as per site condition coveredby6mmthickmarineplywoodofthegenerallyconfirimingtoI:S710-1980 finishedwith3.5to4mmthickmatchingVeneerofapprovedcolorandinsatinwallnut groovmatchedveneerpatternanddesignincludingmelaminepolishing&designwith antitermitetreatmentetc.toplywoodandwoodworkwithtenyearsguaranteebondetc. including all lead and lifts complete as per Architects Drawing and instructions of Engineer Inch |
| 11 | 11:-Providing and fixing single or double leaf panelled door shutter excluding frame with glazed openablefanlightshutter35mmthickasperdetaileddrawingconsistingpanelledvertical styles 100 mm x 35 mm and lock and bottom rail 200 mm x 35 mm and panels 12 mm thick both side commercial ply faced particleboard including stainless steel fixtures and fastening and T.W. beading at junctions of panel insertsandasinstructedbytheEngineerinchargeincluding3coatsofoilpaintingetc. complete. |
| 12 | 12:-Providing and applying interior wall finish luster of approved make on internal wall surface as detailed below Scrapping the surface with emery paper andwipe clean wall primer with brush withmineralturpentinewithbrush8to10%andoil15to20%withrollerand allowingtodryforaperiod6to8hours.wallputtywithappropriateproportionofwater allowing to dry forperiod4to 6hours.Scrapping withEmerypaper180andwipe clean. Applyingwall primer withbrushwithmineral turpentine 8 to 10% andoil 15 to 20% with rollerScrappingEmerypaper320andwipeclean,interiorwallfinishluster1stcoatwith brush/rubber/spraywithmineralturpentine 7to 9%andOilwithroller19 to 21% After8 hours of activity Applying 2nd coat or wall finish Lustre with mineral turpentine 7 to 9% withbrushandOil withroller 19 to 21% after allowing dry for the period of 6 to 8 hours activity.(With prior approval of S.E.) |
| 13 | 13:- Providingandapplyingexternalraincoatpaintingwithcrackfilling acrylicpolymerbased chemical compound coating to the external surface of walls to prevent water seepage in the masonry walls during monsoon added with required shade Steiner to give required shade to the surface in two coats. Including providing three coat of priming of polymer base primer including preparing surface scrapping the existing loose old paint, removing loose particles of sandonthesurfaceopeningandcleaningthecracksdevelopedintheexternalplaster, removinglooseparticlesbychiseling,fillingcracksbychemicalscompoundofapproved makewithproperpenetrationetc.CoatingofRaincoatwiththehelpofbrushandasper instructions andspecificationgivenby manufacturerandwithinstructionfrom Engineer in- charge. Work shall be executed by certified applicator only and covering gurantee of 3 years on court stamp paper of Rs. 500/- and necessary testing etc. complete. |
| 14 | 14 :- Providing and applying two coats of synthetic enamel paint of approved colour to new /old structural steel work and wood work in buildings, including scaffolding if necessary, cleaning and preparing the surface (excluding primer coat) etc. complete. |
| 15 | 15:-Providing and applying two coats of exteriorweather shield paint of approved manufacture andofapprovedcolourtotheplasteredsurfacesincludingcleaning,preparingtheplaster surface ,applying primer coat ,scaffolding if necessary, and watering the surface for two days etccomplete. NOTE: ForItem One Number 15 to 18 prior approval of Superintending Engineer will be necessary |
| 16 | 16:-Providing and laying chequered tiles of approved qualityof size 30 cm x 30 cm, confirming tocorrespondingI.S.forflooringinrequiredpositionlaidonabedof1:4cementmortar including cement float, filling joint with cement slurry cleaning curing etc. complete. |
| 17 | 17)Curtain |
| 18 | Quality Control Material testing charges |
| 19 | Royalty ChargesSand |
| 20 | Royalty Charges Rubble |
| 21 | Item No.18 :LED Panel Light 18w(DSR-IW 2./15) |
| 22 | Item No. 19 :LED Tube Fitting 22w(DSR-IW 2./18) |
| 23 | Item No. 20 :Point Wiring (DSR-IW 1/7/19 ) |
| 24 | Add G.S.T 18% |
| 25 | Add 0.50% for Insurance |
| 26 | Add 1% for Contengency |
| 27 | Add 0.50% for Sqm Charges |