|
| 1 | NS items |
| 2 | Designing, providing, fixing, testing and commissioning of CHLORINE GAS DRY SCRUBBER as per technical specifications issued by Head Office, PHED, Haryana Memo No.-23070-23142 dated 28-02-2024 |
| 3 | Designing, providing, fixing, testing and commissioningof AUTO-SHUT OFF VALVEas per technical specifications issued by Head Office, PHED, Haryana Memo No.-23070-23142 dated 28-02-2024 |
| 4 | Designing, providing, fixing, testing and commissioning of ONLINE COLORIMETRIC WATER QUALITY ANALYZER FOR RESIDUAL CHLORINE AND TURBIDITY including RTU-Cum-Gateway with Cellular (GSM, GPRS,4G/L TE,5G, NB-IoT), LoRa or other RF technology for remote data transfer as per technical specifications issued by Head Office, PHED, Haryana Memo No.-23070-23142 dated 28-02-2024 |
| 5 | Designing, providing, fixing, testing and commissioning of VACUUM-OPERATED AUTOMATIC SWITCHOVER SYSTEM WITH ALTERNATE CHLORINATOR as per technical specifications issued by Head Office, PHED, Haryana Memo No.-23070-23142 dated 28-02-2024 |
| 6 | `Designing, Supply and erection of PETROL GENSET set of 10 KVA capacitywith noise controlled devices acoustic of suitable rating, testing and commissioning of diesel generating set, radiator cooled, 3 phase, 4 wire, 50 cycles 415 plus (-)1% volts AC alternator coupled directly through a set of flexible coupling on a common MS fabricated base frame with diesel engine complete with suitable size incoming cable from generator to change over/AMF panel, making 2nd incoming cable connection from transformer, outgoing cable connection from changeover/ standard panel, making second incoming cable connection from transformer, outgoing cable connection from changeover / STD panel to incomer of motor starter panel, fenced enclosure with platform for Petrol Genset complete as per following detailed scope and specifications anddirections of Engineer-in-charge.The rating should be at 1500 RPM.a) Petrol Engineb) Alternatorc) Battery 24 V.d) Base Plate.e) suitable sq mm suitable core copper cable upto 40 metres.f) Tools, standard panelg) Metering set 415 VAC-1 set (Amp. meter, Volt Meter, ASS, VSS, Phase Indicator, control fuse, frequency meter, CT`s)h) Metering set 60/5A/110V (Amp. Meter, Volt Meter)i) Overload protection for DC-1 No.j) Battery Charger 24V DCk)Copper bus bar of suitable sizel) KWH meter 96 sqmm sizem) Starting fuse button and key switch (on/off)n) Indicating lamps for low lubricated oil pressure, high coolant temperature, set running, load on, Dc control and other required accessories complete in all respects to the satisfaction of Engineer-in-charge` |
| 7 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumables including reagents of original make , general insurance of system, SIM data cost, network and cloud storage etc for 1st year after trial period of three months and defect liability period of one year |
| 8 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumables including reagents of original make , general insurance of system, SIM data cost, network and cloud storage etc for 2nd year |
| 9 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumables including reagents of original make , general insurance of system, SIM data cost, network and cloud storage etc for 3rd year |
| 10 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumables including reagents of original make , general insurance of system, SIM data cost, network and cloud storage etc for 4th year |
| 11 | Comprehensive maintenance of complete system under this DNIT in all respect including replacement of any part and consumables including reagents of original make , general insurance of system, SIM data cost, network and cloud storage etc for 5th year |