Name of Work : Strengthening the Road From East Rasapatty- Edayapatty Road to Malai Road Km.0/0-1/0(R-422)
Sl. No.
Item Description
1
Name of the Work : Strengthening the Road From East Rasapatty- Edayapatty Road to Malai Road Km.0/0-1/0(R-422)
2
Clearing the Scrub jungle including all labour charges for burrying and burning etc…
3
Earth work excavation and depositing on bank within Initial lead and lift in hard gravelly soil for Cutting sidedrain etc. complete, as per SS20 A
4
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density of 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic baricading and providing danger lights etc. complete.
5
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65%.4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%) & (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in place method).
6
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in Juniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
7
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
8
Providing and laying Tack coat over WMM surface treated with primer) using 2.5kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
9
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hat mix plant 20-30 ton capacity, carrying the mix by fipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc. including hire charges and fuel charges foe 20-301 CMP with bitumen boiler, tipper trucks.paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc.. complete as per specification using CMP as per clauses 507 of MORTH Part-5
10
Provision for KM stone
11
Provision for HM stone
12
Provision for Name Board
13
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks.GST Amount is the Total GST Amount for overall quoted amount above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.