| 1 | Professional Staff |
| 2 | Team Leader Cum Senior Highway Engineer |
| 3 | Resident Cum Highway Engineer |
| 4 | Bridge/Structural Engineer |
| 5 | Senior Pavement Engineer |
| 6 | Senior Quality cum Material Expert |
| 7 | Road Safety Expert |
| 8 | Sub Peofessional Staff |
| 9 | Servey Engineer |
| 10 | Assistant Highway Engineer (2nos in Construction & 1nos in Maintenance) |
| 11 | CAD Expert |
| 12 | Environmental Engineer |
| 13 | Assistant Bridge Engineer |
| 14 | AssistantQuality cum Material Engineer (2 nos) |
| 15 | Elecrtical Engineer for utility shifting |
| 16 | Water Supply and drainage Engineer for utility shifting |
| 17 | HTMS/Toll Expert |
| 18 | Quantity Surveyor |
| 19 | Horticulture cum landscaping Expert |
| 20 | Lab Techncian (2 nos) |
| 21 | Document/Data Entry Operator |
| 22 | Support Staff |
| 23 | Office manager |
| 24 | Accountant cum Cashier |
| 25 | Steno cum computer operator |
| 26 | Office Boy |
| 27 | Transportation (Fixed Costs) |
| 28 | Toyota Innova Cryasta or equivalent (1 Nos) (not more than 6 months old)Including the cost of driver opeeration toll and maintenance etc. |
| 29 | Ertiga / Etios or equivalent(1 Nos) (not more than 6 months old)Including the cost of driver opeeration toll and maintenance etc. |
| 30 | Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. |
| 31 | Site to CE - RO , MoRTH Office for Key Professionals |
| 32 | Site to State PWDOffice for Key Professionals |
| 33 | Office Rent (Fixed Costs) Minimum 200 sqm area of office shall be rented The rent cost includes electricity and water charges maintenance cleaning repairs etc. |
| 34 | Office Rent (Fixed Costs) |
| 35 | Office Supplies Utilites and communication (Ficed Costs) |
| 36 | office suplies |
| 37 | Drafting Supplies |
| 38 | Computer Running Costs |
| 39 | domestic and International Communication |
| 40 | Office furniture and equipment (rental 0 as per RFP Apendix C - 3 VII |
| 41 | office furniture and equipment |
| 42 | Reports and Document Printing |
| 43 | Monthly reports (Design and Construction) |
| 44 | Half yearly reports |
| 45 | Various other reports as provided in the EPC agreement such as Completion Report |
| 46 | Road Survey Equipment and investigation as per RFP Apndix C-3 IX |
| 47 | Surface defects detection and roughness measurement using Netwok Survey Vecicle |
| 48 | Pavement strength measuerement using FWD |
| 49 | Bridge inspection using Mobile Bridge Inspection Unit |
| 50 | Road sign inspection using retro refiectoemeter |
| 51 | Contigencies |