| 1 | Excavation in foundation in ordinary soil including lift upto 1.50 m and lead up to 30.0 m. Including watering, ramming and dressing etc.SI.No.251 |
| 2 | Concrete with 40 mm gauge brick ballast,coarse sand of 2.25F.M and cement in proportion of 1:4:8 in foundation and under floor including supply of all materials labour T & P etc.required for proper completion of the work. SI.No.275 |
| 3 | M-150 Brick work in 1:6 cement mortor in foundation and plinth including supply of all materails ,labour and T&P etc requierd for proper completion of the work SI.No. 305 |
| 4 | R.C.C work with cement approved coarse sand 2 cm gauge approved dalla grit proportion of 1:2:4.Foundation SI No279(b) |
| 5 | R.C.C work with cement approved coarse sand 2 cm gauge approved dalla grit proportion of 1:2:4. beam SI no 283 |
| 6 | R.C.C work with cement approved coarse sand 2 cm gauge approved dalla grit proportion of 1:2:4. Column SI No 289 |
| 7 | Mild steel iron in plain work such as in reinforcement concrete or reinforced brick work wrought to required shape as necessary cutting,bending for proper completion of the work and incliding supply of steel its wastage bend hooks and authorised overlaping shall be measured required to proper completion of work S.I.No.504 |
| 8 | M-150 Brick work in 1:4 cement mortor in super structure including supply of all materails ,labour and T&P etc requierd for proper completion of the work SI.No. 303,309,310 |
| 9 | 12 mm thick plaster on roughface of wall with cement mortar consisting of 1 part cement and 4 part of approved coarse sand.minimum thickness not to be less than 10 mm including supply of all materials, labour and T & P etc.required for proper completion of work as per S.I.No.584-596 |
| 10 | Earthwork in embankment in ordinary soil cutting and cartage from 4.00 km distance including ramming dressing and leveling for widening of road for completion of work as per S.I.No.253 |
| 11 | Sand filling in Plinth excluding supply of necessary quantity of sand from a destance not exceeding 8kg(5miles) from the site of work and including watering. Ramming dressing etc. rate to include cost of all material,labour and T & P etc. required for proper completion of the work (Labour + Material) |
| 12 | 2.5cm thick 1:2:4 plain cement concrete floor with cement,coarse sand and 2 cm dalla grit laid in panels finished with 3 mm floating coat of neat cement as per S.I.No.605 |
| 13 | 110 mm dia MS Steel Pipe (Heavy). |
| 14 | Mild steel or iron work in heavy size such as trusses,built up gates ,record rack,roof work gates etc,wrought to required from including drilling holes rivetting or welding where necessary and their fixing.required for proper completion of work as per S.I.No. 503 |
| 15 | Providing corrugated G.S.sheet roofing(0.80mm thick with zinc coating not less than 275gm/m) including vertical/curved surface fixed with polymer coated J or L hooks,bolts and nuts 8mm dia meter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead,including a coat of approved steel primer and two coats of approved paint overlapping of shees complete (upto any pitch in horizontal/vertical or curved surfaces),excluding the cost of purlins,rafters and trusses and including cutting to size and shape wherever required.DSR12.1.2(2023) |
| 16 | Providing and applying white cement based putty of averege thickness 1 mm of approved brads and manufacture ,over the plastered wall surface to prepare the surface even and smooth complete. |
| 17 | Painting or varnishing new iron work in small areasor new wood with one coat (up to one Sqm) of ready mixed priming painting and one coat of approved superior quality ready mix paint (2nd quality synthetic enamel pain,shalimar,asian or equivelent as approved by E/I)or varnish including supply of all materials, labour T&P etc.required for proper completion of work.paint to be used should confirm to theI.S.I.No.103-1950 as per S.I.No.641-642 |
| 18 | One priming coat of cement primer and one coat dry distemper on new work including supply of all materials,labour ,T&P etc.as per S.I.No.649-650 |
| 19 | Finishing wall with water proof cement paint of approved make and quality of new work with two coat to give an even shde including supply of all materials labour and T & P etc. as per S.I.No.660 |
| 20 | Concrete with 40 mm gauge brick ballast,coarse sand of 2.25F.M and cement in proportion of 1:6:12 in foundation and under floor including supply of all materials labour T & P etc.required for proper completion of the work. SI.No.273 |
| 21 | Providing and laying of Rubber moulded reflective Zig-Zag Interlocking concreteBlock pavements having thickness of 80mm As per specification clause 1504.chapter 21 SI. No.2. |
| 22 | S/F of Ceremic Touch Board including supply of all materials labour T & P etc. required for proper completion of the work. |
| 23 | S/F of Projector Stand including supply of all materials labour T & P etc. required for proper completion of the work. |
| 24 | S/F of Computer Core 3 including supply of all materials labour T & P etc. required for proper completion of the work. |
| 25 | S/F of UPSKVA including supply of all materials labour T & P etc. required for proper completion of the work. |
| 26 | S/F of VGA Cable 15m. Including supply of all materials labour T & P etc. required for proper completion of the work. |
| 27 | S/F of Speaker including supply of all materials labour T & P etc. required for proper completion of the work. |
| 28 | S/F of Table including supply of all materials labour T&P etc. required for proper completion of the work. |
| 29 | S/F of Splitter including supply of all materials labour T&P etc. required for proper completion of the work. |
| 30 | S/F of School Bench including supply of all materials labourT & P etc. required for proper completion of the work |
| 31 | S/F of Mat including supply of all materials labour T&P etc.required for proper completion of the work |
| 32 | Door |
| 33 | Window |
| 34 | 3D Wall paper Sticker (WaterProof) including supply of all materials labour T & Petc.required for proper completion of the work |
| 35 | Provision of Jhula including supply of all materials,labour and T&P etc. required for proper completion of the work. |
| 36 | Provision of Slider including supply of all materials,labour and T&P etc. required for proper completion of the work. |
| 37 | Provision of See-Saw including supply of all materials,labour and T&P etc.required for proper completion of the work. |
| 38 | S/F Sign board and photography |