| 1 | 63 KVA Sub - Station |
| 2 | Distribution Transformer (Ordinary), 11/0.4 kV, 63 KVA |
| 3 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) |
| 4 | Muffs with concerete filling |
| 5 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incommer line. - Provided by HPSEBL |
| 6 | MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA\"s- Provided by HPSEBL |
| 7 | X-Arm: [Channel Iron (75x40x6 mm), Length : (2800mm) X 4 Nos] for supporting DO fuse unit & GO switch.- Provided by HPSEBL |
| 8 | Transformer Bed, Belting & Knee Bracing |
| 9 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed.- Provided by HPSEBL |
| 10 | X-Arm [Channel Iron (100x50x6 mm), Length : 460mm x 2 Nos for supporting Main Channel of Transformer]- Provided by HPSEBL |
| 11 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos - Provided by HPSEBL |
| 12 | MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos - Provided by HPSEBL |
| 13 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing - Provided by HPSEBL |
| 14 | Transformer LT Distribution Box and GO Switch fixing Assembly |
| 15 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos - Provided by HPSEBL |
| 16 | MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos - Provided by HPSEBL |
| 17 | GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm. - Provided by HPSEBL |
| 18 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type - Provided by HPSEBL |
| 19 | D.O Fuse Unit |
| 20 | Surge Arrester, 9 kV Station Class(Porcelain Type) |
| 21 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 22 | Stay set complete. - Provided by HPSEBL |
| 23 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set). - Provided by HPSEBL |
| 24 | Pipe Earthing Set. |
| 25 | Prov. L.T.Distribution Panel Box with MCCB 100 amp 3P 35kA , ICS =100 % ICU, KIT-KAT 200 Amp |
| 26 | Half Clamp (M.S. Flat 50X6 mm) - Provided by HPSEBL |
| 27 | Full Clamps (M.S. Flat 50X6 mm) - Provided by HPSEBL |
| 28 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] |
| 29 | Aluminium Thimble - Provided by HPSEBL |
| 30 | Copper Thimbles 200Amp. - Provided by HPSEBL |
| 31 | Danger Plate - Provided by HPSEBL |
| 32 | Barbed Wire |
| 33 | Chain Link fencing , Angle Iron ,Gate etc for transformer fencing. |
| 34 | Prov 1.1 kV XLPE Cable Unarmoured 3.5 X 185 mm² |
| 35 | Prov. Capacitor Bank 415v for 63 kVA DTR 27 kVAr |
| 36 | Prov. Fusung Unit for 63 KVA. |
| 37 | Energy Meter 3-ɸ, 4 wire CT operated Static Tri_x005fVector meter (CT-200/5 A) for 63 KVA Transformer. |
| 38 | Prov Tong Tester Clipon Type |
| 39 | Aluminium Paint. |
| 40 | Transporation Charges . |
| 41 | Erection Charges of Sub-Station complete in all respect. |
| 42 | LT Line |
| 43 | AAAC 6/1/3.35 (50mm²) { Neutral conductor including 3% (Sag, Jumpering and wastage} |
| 44 | Prov Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 45 | Prov 1.1 kV XLPE Cable Unarmoured 3.5 X 120 mm² |
| 46 | Prov 1.1 kV XLPE Cable Unarmoured 3.5 X 70 mm² |
| 47 | Prov Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (with Ruling Span 67 m) |
| 48 | Prov Muffs with concerete filling |
| 49 | Prov CI (75x40x4.8) Length- 0.95 Mtr |
| 50 | Prov AI (75x75x6) Length- 1.50 Mtr |
| 51 | Prov Shackle Insulator (16 kN) - Provided by HPSEBL |
| 52 | Prov D-Iron (U- Clamps) - Provided by HPSEBL |
| 53 | Prov Earth Knob |
| 54 | Prov LT Stay Set - Provided by HPSEBL |
| 55 | Prov Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) - Provided by HPSEBL |
| 56 | Prov Kit Kat200 A I.C. - Provided by HPSEBL |
| 57 | Prov Earthing Set complete |
| 58 | Prov Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] |
| 59 | Prov Aluminium Paint |
| 60 | Prov Spiral PVC Spacer - Provided by HPSEBL |
| 61 | Transporation Charges . |
| 62 | De-Sagging of AAAC/ACSR and GI Wire for 1 Km Line . |
| 63 | Erection Chargesof Cable. |
| 64 | Erection Charges of ST Pole. |
| 65 | Erection Charges for Sagging ofAAAC/ACSR 50mm2 |
| 66 | Erection Charges for Sagging ofAAAC/ACSR 80mm2 |
| 67 | Erection Charges for Sagging of GI Wire |
| 68 | Erection of Earthing Set. |
| 69 | Fixing of Jumper. - Provided by HPSEBL |
| 70 | Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. |