Public Administrative Department Local Bodies Closing in 0 days TDR #45646710

Tender For Motor Repair And Supply Of Other Electrical Materials For Water Supply Department Of Dahanu Municipal Council.

Issued by Local Bodies · dahanu, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
15 Oct 2024
0 days left
EMD
20000
Bank guarantee accepted
Document Fee
2360
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
dahanu → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Motor Repair And Supply Of Other Electrical Materials For Water Supply Department Of Dahanu Municipal Council.- 1 Removing of 100HP Ht. Motor 2 Fixing of 100HP Motor 3 Removing, dismantling, assembly & re-erection of 350 HP VT Pump 4 Transportation to & fromsite to workshop &back(90kmx2) 5 Cutless bearing neoprene rubber 6 Line Shaft Sleeve 7 Top shaft threaded sleeve (SS410) 8 Top Shaft (SS316) 9 Line Shaft (SS3I6) 10 ThreadedLouplin for Shafts (SS316) 11 Neoprene nibbe busheswithAluminumPiece for, bearing housing ratchet 12 Gun Metal Néck ring for bowl assembly 13 Bowl Assembly Shaft (SS 316) 14 GunMetalBushforCasingbowl&stuffing box 15 Drilling,Bushing,TappingwithRetappingto Bearing Housing with New Bolts 16 Hydra Charges 17 SS shaft throughout 18 of Pump using Tools, Bearing Pullers, Labours, etc. 19 Cleaning of Bearing Housing using Diesel Cotton Waste, Anti Sticking Liquid, etc. 20 Providing & Fixing of following Spares 21 Bearing294l6 EL — XL 22 Bearing 6020 M/C4 23 Housing Packing 24 Assembling Fitting of Bearing Housing using Mounting to Pump with Proper Alignment 25 Fixing of Motor 26 Commissioning with Test & Trials 27 To & Fro Transportation 28 Removing and dismantling of motor of EOT including Brake Linear Assembly, Gears, Wire rope using tools and labours etc. 29 Overhauling & Cleaning of Brake Linear, Brake Drum Assembly using Rustoline Cotton Waste Diesel, etc. including labour and material. 30 Providing and fixing of following Parts to EOT 31 New Brake Liner 32 New Electrical oil set for Clutch operation 10 clutch 33 On/off/up/down/left/right 10 way switch 34 Rope Guide 35 Wire Rope 10mm 36 Cable guide 37 Internal wiring of panel board with new contractors, connectors, lugs , etc 38 Assembling all parts together with test & trials. 39 Overhauling and Servicing of 3 Tonne EOT including dismantalling , cleaning, assembling & fixing with test & trial 40 Providing & fixing limit switch 41 Internal wiring of panel board with new contractors, connectors, lugs , etc 42 On/off/up/down 4 way switch 43 Assembling all parts with test and trial 44 JAW Contact 45 Trip Coil 110 V 46 Trip Coil 110 V 47 Limit Switch 2 NO + 3 NC 48 Limit Swithc 1 NO + 1 NC 49 Fuse BS2692 50 Fuse VFT 11/3A 51 ABB, REJ 601 Relay Base Model 52 Breaker control Switch (TNC) 53 Master Trip Relay 110 V DC 54 Local Remote Switch 55 Service & Installation charges 56 Dismantling of following Sluice Valves 57 a) 300 mm 58 b) 400 mm 59 c) 450 mm 60 Cleaning of all Sluicevalves internal & external using tools labours diesel cotton waste etc 61 Lapping of Sluice Valve gate sheet rings to match body sheet rings using special lapping solutions and stones 62 Providing and fixing of following spares 63 a) Nutbolts with double washers 64 b) Rubber packings 65 c) T Bolts with Nuts 66 d) Gland packings 67 Assembling of following Sluice Valves 68 a) 300 mm 69 b) 400 mm 70 c) 450 mm 71 Colouring including red oxide and paint 72 Motor Rewinding 335 HP 73 Motor Disambling 335HP 74 Motor Housing 335HP 75 Motor bearing 335HP 76 Removing & Dismantling of Bearing Housing 77 25HP motor rewinding 78 2HP motor rewinding 79 7HP motor rewinding 80 Removing & Fixing 25HP 81 Removing & Fixing 2HP 82 Removing & Fixing 07HP 83 25HP LT statar repair 84 2HP LT statar repair 85 7HP LT statar reapir 86 Contactor 10Ampstar-delta 87 Contactor 18Amp star-delta 88 Relay 6 Amp star-delta 89 Realy 12Amp star-delta 90 L&T upto 10Amp Statar 91 25Amp glass fuse 92 PVC tape 93 Aluminium Tape 94 DEO 5Amp 95 DEO 6Amp 96 Rabbur sheet 97 Oil 68 Castrol 98 Gress AP3 99 High Temp Gress 100 Air Blower pump servicing, gressing & Oiling 101 Sluice valve Greessing 300mm 102 Sluice valve Greessing 250mm 103 Sluice valve Greessing 400mm 104 Sluice valve Greessing 450mm 105 Sluice valve Greessing 100mm 106 Sluice valve Greessing 150mm 107 Sluice valve Greessing 200mm 108 Sluice Valve checknut 100mm 109 Sluice Valve checknut 150mm 110 Sluice Valve checknut 200mm 111 Sluice Valve checknut 250mm 112 Sluice Valve checknut 300mm 113 Sluice Valve checknut 400mm 114 Sluice Valve checknut 450mm 115 S.V Spindle 100mm 116 S.V Spindle 150mm 117 S.V Spindle 200mm 118 S.V Spindle 250mm 119 S.V Spindle 300mm 120 S.V Spindle 400mm 121 S.V Spindle 450mm 122 Dismantling 100mm SV 123 Dismantling 150mm SV 124 Dismantling 200mm SV 125 Dismantling 250mm SV 126 Dismantling 300mm SV 127 Dismantling 400mm SV 128 AssemblingS.V 100mm 129 AssemblingS.V 150mm 130 AssemblingS.V 200mm 131 AssemblingS.V 250mm 132 AssemblingS.V 300mm 133 AssemblingS.V 400mm 134 AssemblingS.V 450mm 135 VT pump spider 136 VT pump Spider Rubber Bushing 137 Impeller 138 Ring Impller 139 Bearing sleeve 140 Coupling Half driver 141 Coupling half pump 142 Key coupling 143 Ball coupling 144 Nut shaft adjusting 145 Gasket 146 Gland 147 pipe column 148 bearing throttle 149 plate sole 150 flange top & Bottomcolumn pipe 151 strainer 152 collet impeller lock 153 coupling shaft 154 bearing lineshaft enclosed 155 Liner bowl 156 sole plate 157 Deflector 158 Deflector 159 Overhaulingof33kvindoortypeVCB1250amp 160 Overhaulingof33kvoutdoortypeVCB1250amp 161 Overhaulingof3.3kvindoortypeVCB650amp 162 Overhaulingof3.3kvindoortypeVCB1000 amp 163 Overhaulingof3.3kvindoortypeVCB1250 amp 164 Replacement of Vaccume Circuit Breaker spare 165 i)Vaccume Intrupter 166 ii)Tulip12Fingure 167 iii)Female Epoxy Spout 168 iv)Spring Charging Motor Mechanisam 169 v)Rackin /out Machanisam 170 vi)Under voltagecoil 171 vii)Trippingcoil 172 viii)Closingcoil 173 ix)PushOn/Offswitch 174 x)ContactArm 175 Overhaulingof3.3kvVaccumeContactor400 amp 176 Overhaulingof3.3kvVaccumeContactor600 amp 177 ReplacementofVaccumeContactorspare 178 i)JawContact 179 ii)Insulator 180 iii)FemaleEpoxySpout 181 iv)LimitSwitch 182 v)Auxilaryswitch 183 vi)Fuse 184 OverhaulingofACB1000amp 185 OverhaulingofACB1250amp 186 ReplacementofAirCircuitBreaker spare 187 i)Undervoltagecoil 188 ii)Trippingcoil 189 iii)Closingcoil 190 iv)SpringChargingMechanisam 191 v)AuxilarySwitch 192 Overhaulingof33KVMainIncomerPanel 193 Overhaulingof3.3KVMotorFeederpanel 194 Overhaulingof3.3KVMainIncomerPanel 195 TestingofMainIncomer/MotorFeederPanel 196 OverhaulingofRTCCPanel 197 Testing&CalibrationofRelay 198 RepairingABBmakeRelay 199 Overhaulingof33KVOutdoorCT 200 Overhaulingof33KVOutdoorPT 201 Replacementof33KVCurrentTransformer 202 i)IndoortypeCT 203 ii)Outdoortype CT 204 Replacementof33KVPotentialTtransformer 205 i)IndoortypePT 206 ii)Outdoortype PT 207 Replacementof33kvLightningArrester 208 i)IndoortypeLA 209 ii)Outdoortype LA 210 Replacementofindoortype3.3kvCT 211 Replacementofindoortype3.3kvPT 212 VCBBatteryChargerPanel 213 i)TestingofBatteryBankofVCB 214 ii)OverhoilingofBatteryChargerPanel 215 ReplacementofDryTypeBatteryBankofVCB 216 ReplacementofInverter 217 ReplacementofInverterBattery 218 i)100Ah 219 ii)200Ah 220 iii)250Ah 221 Painting of Switch yard Structure at Dhuktan Sub station withonecoatofAnti-CorrosivepaintandoveritTwoCoat ofOilpaintasdirectedbyEngineerinCharge,charges includeScrappingofStructure,labouretccomplete. 222 Painting of Switch yard Structure at Maswan Sub station withonecoatofAnti-CorrosivepaintandoveritTwoCoat ofOilpaintasdirectedbyEngineerinCharge,charges includeScrappingofStructure,labouretccomplete. 223 Painting of CLF BridgeStructure at Dhuktan WTP with one coat of Anti-Corrosive paint and over it Two Coat of Oil paintasdirectedbyEngineerinCharge,chargesinclude ScrappingofStructure,labouretccomplete 224 Painting of CRCA sheet of various Panel at Maswan HW & Dhuktan WTP with powder coated one coat of red lead paint and over it two coat enamel paint as directed by EngineerinCharge,chargesincludeScrappingof Structure,labouretccomplete 225 Painting of MS Structure with one coat of Anti-Corrosive paint and over it Two Coat of Oil paint as directed by EngineerinChargeinDhuktanWTP,chargesinclude ScrappingofStructure,labouretccomplete 226 ReplacementofInsulator 227 i)33kvOutdoorpostinsulator 228 ii)33kvIndoorinsulator 229 iii)3.3kvindoorinsulator 230 AllPolyPropyleneHTCapacitor 231 i)TestingofCapacitorBank 232 ii)ReplacementofCapacitorBank 233 iii)OverhoilingofCapacitorPanel 234 Supply,Errect&CommisioningofRelay 235 i)ABBOverVoltage 236 ii)ABBUnderVoltage 237 iii)ABBOverCurrent&EarthFault 238 iv)ABBMasterTrip 239 v)ABBMotorProtection 240 vi)ABBTripCircuitSupervision 241 vii)PowerFactorControl 242 viii)PLARelay 243 ix)AuxilaryRelay 244 x)AutomaticVoltageRegulation 245 Replacement of Copper BusBar 246 Replacement of Aluminium BusBar 247 Replacement of Annunciator 248 Replacement of Hooter 249 Replacement of Temprature Scanner 250 Replacement of MultiFuction Meter 251 Replacement of Ammeter 252 Replacement of Voltmeter 253 ReplacementofPushButton 254 ReplacementofPilotLamp 255 ReplacementofSelectorSwitch 256 ReplacementofElectronicTimmer 257 ReplacementofHourMeter 258 Servicing&Overhoilingofoutdoor GOD 259 Servicing&OverhoilingofoutdoorDOSet 260 TransformerOilFiltration 261 SupplyNewTransformer Oil 262 TransfomerPostInsulator 263 i)HTside 264 ii)LTside 265 TransformerBreather 266 i)ForHT Transformer 267 ii)ForLTTransformer 268 TransformerRewindinginFactoryincludingReplacement of Gasket, Painting of Inner & outer surface, To & Fro charges,loading&unloadingCharges 269 60kvaTransformer 270 100kvaTransformer 271 200kvaTransformer 272 415kvaTransformer 273 630kvaTransformer 274 750kvaTransformer 275 1000kvaTransformer 276 TransformerOveningforimprovingmeggervaluein FactoryincludingReplacementofGasket,Paintingof Inner & outer surface, To & Fro charges, loading & unloadingCharges 277 60kvaTransformer 278 100kvaTransformer 279 200kvaTransformer 280 415kvaTransformer 281 630kvaTransformer 282 750kvaTransformer 283 1000kvaTransformer 284 TransformerServicing&OverhoilingatSiteWashingof Coil by Oil, Attending minor leakages by replacing necessary gasket packing, tightening of Bushing & necessaryfitting,paintingoutersurface 285 60kvaTransformer 286 100kvaTransformer 287 200kvaTransformer 288 415kvaTransformer 289 630kvaTransformer 290 750kvaTransformer 291 1000kvaTransformer 292 Servicing&OverhaulingofHTTransformerOLTC TestingofRTCC&OLTC RepairingTransformerTapChanger 293 Supply,Errect&CommisioningofTapPositionIndicator 294 Supply,Errect&CommisioningofOilTemperature IndicatorofHTTransformer 295 Supply,Errect&CommisioningofWindingTemperature IndicatorofHTTransformer 296 Supply,Errect&CommisioningofMagneticOilGuageof HTTransformer 297 Supply,Errect&CommisioningofBuchhlozRelayofHT Transformer 298 CarryingoutTestofEquipments 299 i)HighportTestofCable 300 ii)InsulationResistanceTestofTransformer/Motor 301 iii)WindingResistanceTestof Transformer/Motor 302 iv)EarthingTestof Transformer/Motor/Panel 303 v)MagneticBalancingTestofTransforme 304 vi)VectorGroupTestofTransformer 305 vii)PolarindexTestofTransformer 306 viii)ContactResistanceTestofVCB 307 ix)VibrationTestofMotor 308 Supply,Erect&CommisioningofCable 309 i)33Kv3core95Sq mmAlXLPE 310 ii)33Kv3core120Sq mmAlXLPE 311 iii)33Kv3core240SqmmAl XLPE 312 iv)33Kv3core400SqmmAl XLPE 313 v)4core50SqmmArmoured Al 314 vi)4core25SqmmArmouredAl 315 vii)3.5core95SqmmAl 316 viii)3.5core50Sq mmAl 317 ix)3core1SqmmAl 318 x)2core1SqmmAl 319 xi)1SqmmFlexible cable 320 xi)2core10SqmmAl 321 xii)3core10Sq mmAl 322 SupplyErrect&CommisioningofCableTermination Kit 323 i)33kv400SqmmIndoor 324 ii)33kv300SqmmIndoor 325 iii)33kv400Sqmmoutdoor 326 iv)33kv300Sqmmoutdoor 327 v)3.3kv240SqmmIndoor 328 vi)3.3kv120SqmmIndoor 329 vii)3.3kv240SqmmOutdoor 330 viii)3.3kv120SqmmOutdoor 331 SupplyErrect&CommisioningofCableStraightJointKit 332 i)33kv400 Sqmm 333 ii)33kv300 Sqmm 334 iii)3.3kv240 Sqmm 335 iv)3.3kv120Sqmm 336 Supply,Erect,CommiosioningofExhaustFanHeavy Duty 450mm,1400RPM 337 SupplyErect,Commiosioningof24WEnergyEfficient LED Tube 338 SupplyErect,Commiosioningof40WEnergyEfficient LED StreetLight 339 SupplyErect,Commiosioningof60WEnergyEfficient LED StreetLight 340 SupplyErect,Commiosioningof100WEnergyEfficient LEDFlood Light 341 SupplyErrect&CommisioningContactor 342 i)Threepole63amp 343 ii)Threepole100amp 344 iii)Fourpole100 amp 345 iv)Fourpole200amp 346 v)Fourpole300 amp 347 vi)Fourpole400 amp 348 vii)Fourpole600amp 349 SupplyErrect&CommisioningMCCB 350 i)Threepole100amp 351 ii)Threepole200amp 352 iii)Threepole300amp 353 iv)Threepole400 amp 354 v)Threepole600 amp 355 SupplyErrect&CommisioningMCB 356 i)Singlepole6to32amp 357 ii)Singlepole40to64amp 358 iii)Doublepole6to32amp 359 iv)Doublepole40to64amp 360 v)Threepole6to32amp 361 vi)Threepole40to64amp 362 vii)Fourpole6to32amp 363 viii)Fourpole40to64amp 364 SupplyErrect&CommisioningofSwitch Gear 365 i)Fn/sfu100 amp 366 ii)Fn/sfu200amp 367 iii)Fn/sfu250 amp 368 iv)Fn/sfu300 amp 369 v)Fn/sfu400amp 370 vi)Fn/sfu600amp 371 SupplyErrect&CommisioningofFuse 372 i)5 amp 373 ii)10amp 374 iii)20amp 375 iv)30amp 376 v)50amp 377 vi)100amp 378 vii)200amp 379 SupplyErrect&CommisioningofD.O.Fuse 380 i)10amp 381 ii)25amp 382 iii)50amp 383 SupplyErrect&CommisioningofIndoorFuse 384 i)3.3kv10amp 385 ii)3.3kv20amp 386 iii)3.3kv30amp 387 iv)33kv50amp 388 v)33kv70amp 389 SupplyErrect&CommisioningofHRCFuse 390 i)6 amp 391 ii)10amp 392 iii)16amp 393 iv)32amp 394 v)64amp 395 SupplyErrect&CommisioningofChangeOverSwitch 396 i)100amp 397 ii)200amp 398 iii)300amp 399 iv)400amp 400 SupplyAlCableLugs 401 i)50mm 402 ii)95mm 403 iii)120mm 404 iv)185mm 405 v)240 mm 406 vi)300mm 407 vii)400mm 408 SupplyAlCableGland 409 i)95mm 410 ii)120 mm 411 iii)185mm 412 iv)240mm 413 v)300 mm 414 vi)400mm 415 5ampelectricpointwithallmaterial 416 16ampelectricpointwithall material 417 32ampelectricpointwithall material 418 64ampelectricpointwithall material 419 BoilerSuite 420 RainySuite 421 SafetyShoes 422 Hand Gloves 423 GumBoot 424 SafetyHelmet 425 SafetyBelt 426 WD40(500ml) 427 CRC(500ml) 428 BearingOil 429 BearingGrease 430 BearingHighSpeedGrease 431 Providing & Fabrication of MS Structural work which is essential for Motor, Transformer, VCB, CLF,and any other WTP equipments as directed by Engineer in charge, charges include Cutting, Welding, hoisting, bolting, fixing, erectinginpositionasrequiredandapplyonecoatof Anti-Corrosive paint and over it two coat of oil paint etc complete 432 Providing & Fabrication of CRCA Sheet for boxes, panel boxes etc include cutting, bending, welding, drilling, rivetingwithdulypowdercoatedonecoatofredlead paint&twocoatofenamelpaintetccomplete 433 335HP VTPumpJyoti/Kirloskar/ FlowMore Make@Maswan&Dhuktan 434 Re-erectionandLevelingof Pump Removingmotor 435 Dismantling,Cleaning,overoilingandPump assembly Re-erectionofMotor Totalshaft runoutcheck&Epoxypaintingwithtwocoatredoxide 436 Checknutofimpeller 437 Copperlockwasher 438 Impeller 439 Impellerkey 440 Wearingring 441 Shaftsleeveofbellmouth 442 cutleesbearingstainlesssteel 443 Muff-couplingstainlesssteel 444 Split-ringstainless steel 445 Sleevestainless steel 446 Shaftstainlesssteel 447 Headshaft 448 Impeller shaft 449 staffingbox 450 staffingbox packing 451 Staffingboxbrasssleeve 452 StaffingboxGlandsleeve 453 Staffingboxpackingcover 454 SSnutboltwithwasher 455 Balancingof impeller 456 Totalcouplingsetwithreachedlock 457 Coppertub 458 Reachedpin 459 Reachedcouplingwithlock 460 Reflector 461 Bearinghousingcovers 462 BearingSKF Make 463 G Bearing 464 20 mm dia.GateValve 465 20mm dia.G.I Drainpipe 466 20mm dia.AirValve 467 CouplingBush 468 Couplingnutbolt 469 Gasket10mmthick 470 PressureGuage 471 5HP to 30 HP CentrifugalPump anyMake@ Maswan/ Shelwali 472 Removing motor,Dismantling , Cleaning , overhauilingPumpassembly,Re-erectionofMotor&pump Checknutofimpeller 473 Impeller 474 Impellerkey 475 Wearingring 476 Sleevestainless steel 477 Shaft key 478 Headshaft 479 Impeller shaft 480 StaffingboxGlandsleeve 481 Staffingboxpackingcover 482 Balancingof impeller 483 Reachedcouplingwithlock 484 Bearinghousingcovers 485 BearingSKF Make 486 CouplingBush 487 Couplingnutbolt 488 Gasket05mmthick 489 Sluice Valve 350mm @ Maswan & Shelwai Repair work 490 Removing,Dismentling,cleaning&Re- erectionofValve 491 CheckNut 492 NutBolt 493 Spindle 494 O Ring 495 Wedge 496 RefluxValve350mm at Maswan& Shelwali Reapir work Removing,Dismentling,cleaning&Re- erectionofValve 497 NutBolt 498 O Ring 499 Wedge 500 ButterflyValve 250mm@Maswan & Shelwali Removing,Dismentling,cleaning&Re- 501 NutBolt 502 O Ring 503 GearBox at Maswan& Shelwali Removing,Dismentling,Cleaning&Re-erectionofGearBox 504 NutBolt 505 GearORing 506 WormGear 507 HelicalGear 508 Gear Shaft 509 Roller Bearing 510 Washer 511 ActuatorofValve at Maswan&Shelwali Removing,Dismentling&Re-erectionof Actuator 512 RewindingofMotor 513 LimitSwitch 514 TorqueSwitch 515 HelicalPinion Gear 516 LockNut 517 FlashMixer/AlumAgigator at Maswan & Shelwali 518 Rewindingof3 HPMotor 519 Rewindingof5 HPMotor 520 Rewindingof7.5HP Motor 521 Servicing&overhoilingofGearBox 522 Drive Shaft 523 RadialFlow Paddle 524 Coupling 525 RewindingofMotor 526 Upto2.5 HP 527 Above2.5HPto 5HP 528 Above5HPto7.5HP 529 Above7.5HPto 10HP 530 DOLstarterfor Motor 531 Upto2.5 HP 532 Above2.5HPto 5HP 533 Above5HPto7.5HP 534 Above7.5HPto 10HP 535 StarDeltastarterforMotor 536 Above15HP to20HP 537 Above20HP to25HP 538 OverhaulingofMotor 539 Upto2.5 HP 540 Above2.5HPto 5HP 541 Above5HPto7.5HP 542 Above7.5HPto 10HP 543 ClarifloculatorBridg Shelwali 544 SprocketWheel 545 SprocketRollerChain 546 DrivingWheel 547 RubberScrapper 548 ReductionGearBox 549 SelfalignBearingofwheel 550 ThrustBearingof Bridge 551 RadialBearingofBridge 552 EOTCrane at Maswan&Shelwali DismentlingCrane,Gearbox&Motor Re-AssemblingCrane,Gearbox&Motor 553 Reverse-ForwardAssembly 554 Up-DownAssembly 555 Brake Coil 556 Brake liner 557 Brake shoe 558 Clutchplatespring 559 RopeDrum 560 WireRope 561 HelicalGear 562 PinionGear 563 LimitSwitch 564 Auxilary Contact 565 Remoteof Crane 566 15HPAirCompressor at Maswan /Shelwali 567 RemovingofAirCompressor&Motor ReassemblingofAirCompresor&Motor 568 HP/LPPiston assembly 569 PistonRing 570 ConnectingRod 571 HP/LPValve assembly 572 Crank Shaft 573 Oil seal 574 HP/LP AirHead assembly 575 Bush 576 V -Belt 577 Gasket 578 50mm dia.SluiceValve 579 50mm dia.RefluxValve 580 50mmdia.SolenoidvalveAssembly 581 FlashMixer at Maswan /Shelwali 582 Removing,Dismentling&CleaningofFlash MixerwithMotor &Gearbox ReassemblingofFlashMixerwithMotor&Gearbox 583 Oil seal 584 Sleeve 585 O ring 586 Wormgear 587 Bearing 588 Piniongear 589 MotorFan cover 590 Gear pin 591 Bearing Housing 592 AlumAgigator at Maswan /Shelwali 593 Oil seal 594 O ring 595 Wormgear 596 Bearing 597 Piniongear 598 Gear pin 599 Bearing Housing 600 Bearing Housing

BOQ

Name of Work: For the financial year 2024-25 through the Water Supply Department of Dahanu Municipal Council, repairing and maintaining the machinery at the Pump House and Water Purification Center with necessary materials from time to time.
Sl. No. Item Description
1Removing of 100HP Ht. Motor
2Fixing of 100HP Motor
3Removing, dismantling, assembly & re-erection of 350 HP VT Pump
4Transportation to & fromsite to workshop &back(90kmx2)
5Cutless bearing neoprene rubber
6Line Shaft Sleeve
7Top shaft threaded sleeve (SS410)
8Top Shaft (SS316)
9Line Shaft (SS3I6)
10ThreadedLouplin for Shafts (SS316)
11Neoprene nibbe busheswithAluminumPiece for, bearing housing ratchet
12Gun Metal Néck ring for bowl assembly
13Bowl Assembly Shaft (SS 316)
14GunMetalBushforCasingbowl&stuffing box
15Drilling,Bushing,TappingwithRetappingto Bearing Housing with New Bolts
16Hydra Charges
17SS shaft throughout
18of Pump using Tools, Bearing Pullers, Labours, etc.
19Cleaning of Bearing Housing using Diesel Cotton Waste, Anti Sticking Liquid, etc.
20Providing & Fixing of following Spares
21Bearing294l6 EL — XL
22Bearing 6020 M/C4
23Housing Packing
24Assembling Fitting of Bearing Housing using Mounting to Pump with Proper Alignment \"
25Fixing of Motor
26Commissioning with Test & Trials
27To & Fro Transportation
28Removing and dismantling of motor of EOT including Brake Linear Assembly, Gears, Wire rope using tools and labours etc.
29Overhauling & Cleaning of Brake Linear, Brake Drum Assembly using Rustoline Cotton Waste Diesel, etc. including labour and material.
30Providing and fixing of following Parts to EOT
31New Brake Liner
32New Electrical oil set for Clutch operation 10 clutch
33On/off/up/down/left/right 10 way switch
34Rope Guide
35Wire Rope 10mm
36Cable guide
37Internal wiring of panel board with new contractors, connectors, lugs , etc
38Assembling all parts together with test & trials.
39Overhauling and Servicing of 3 Tonne EOT including dismantalling , cleaning, assembling & fixing with test & trial
40Providing & fixing limit switch
41Internal wiring of panel board with new contractors, connectors, lugs , etc
42On/off/up/down 4 way switch
43Assembling all parts with test and trial
44JAW Contact
45Trip Coil 110 V
46Trip Coil 110 V
47Limit Switch 2 NO + 3 NC
48Limit Swithc 1 NO + 1 NC
49Fuse BS2692
50Fuse VFT 11/3A
51ABB, REJ 601 Relay Base Model
52Breaker control Switch (TNC)
53Master Trip Relay 110 V DC
54Local Remote Switch
55Service & Installation charges
56Dismantling of following Sluice Valves
57a) 300 mm
58b) 400 mm
59c) 450 mm
60Cleaning of all Sluicevalves internal & external using tools labours diesel cotton waste etc
61Lapping of Sluice Valve gate sheet rings to match body sheet rings using special lapping solutions and stones
62Providing and fixing of following spares
63a) Nutbolts with double washers
64b) Rubber packings
65c) T Bolts with Nuts
66d) Gland packings
67Assembling of following Sluice Valves
68a) 300 mm
69b) 400 mm
70c) 450 mm
71Colouring including red oxide and paint
72Motor Rewinding 335 HP
73Motor Disambling 335HP
74Motor Housing 335HP
75Motor bearing 335HP
76Removing & Dismantling of Bearing Housing
7725HP motor rewinding
782HP motor rewinding
797HP motor rewinding
80Removing & Fixing 25HP
81Removing & Fixing 2HP
82Removing & Fixing 07HP
8325HP LT statar repair
842HP LT statar repair
857HP LT statar reapir
86Contactor 10Ampstar-delta
87Contactor 18Amp star-delta
88Relay 6 Amp star-delta
89Realy 12Amp star-delta
90L&T upto 10Amp Statar
9125Amp glass fuse
92PVC tape
93Aluminium Tape
94DEO 5Amp
95DEO 6Amp
96Rabbur sheet
97Oil 68 Castrol
98Gress AP3
99High Temp Gress
100Air Blower pump servicing, gressing & Oiling
101Sluice valve Greessing 300mm
102Sluice valve Greessing 250mm
103Sluice valve Greessing 400mm
104Sluice valve Greessing 450mm
105Sluice valve Greessing 100mm
106Sluice valve Greessing 150mm
107Sluice valve Greessing 200mm
108Sluice Valve checknut 100mm
109Sluice Valve checknut 150mm
110Sluice Valve checknut 200mm
111Sluice Valve checknut 250mm
112Sluice Valve checknut 300mm
113Sluice Valve checknut 400mm
114Sluice Valve checknut 450mm
115S.V Spindle 100mm
116S.V Spindle 150mm
117S.V Spindle 200mm
118S.V Spindle 250mm
119S.V Spindle 300mm
120S.V Spindle 400mm
121S.V Spindle 450mm
122Dismantling 100mm SV
123Dismantling 150mm SV
124Dismantling 200mm SV
125Dismantling 250mm SV
126Dismantling 300mm SV
127Dismantling 400mm SV
128AssemblingS.V 100mm
129AssemblingS.V 150mm
130AssemblingS.V 200mm
131AssemblingS.V 250mm
132AssemblingS.V 300mm
133AssemblingS.V 400mm
134AssemblingS.V 450mm
135VT pump spider
136VT pump Spider Rubber Bushing
137Impeller
138Ring Impller
139Bearing sleeve
140Coupling Half driver
141Coupling half pump
142Key coupling
143Ball coupling
144Nut shaft adjusting
145Gasket
146Gland
147pipe column
148bearing throttle
149plate sole
150flange top & Bottomcolumn pipe
151strainer
152collet impeller lock
153coupling shaft
154bearing lineshaft enclosed
155Liner bowl
156sole plate
157Deflector
158Deflector
159Overhaulingof33kvindoortypeVCB1250amp
160Overhaulingof33kvoutdoortypeVCB1250amp
161Overhaulingof3.3kvindoortypeVCB650amp
162Overhaulingof3.3kvindoortypeVCB1000 amp
163Overhaulingof3.3kvindoortypeVCB1250 amp
164Replacement of Vaccume Circuit Breaker spare
165i)Vaccume Intrupter
166ii)Tulip12Fingure
167iii)Female Epoxy Spout
168iv)Spring Charging Motor Mechanisam
169v)Rackin /out Machanisam
170vi)Under voltagecoil
171vii)Trippingcoil
172viii)Closingcoil
173ix)PushOn/Offswitch
174x)ContactArm
175Overhaulingof3.3kvVaccumeContactor400 amp
176Overhaulingof3.3kvVaccumeContactor600 amp
177ReplacementofVaccumeContactorspare
178i)JawContact
179ii)Insulator
180iii)FemaleEpoxySpout
181iv)LimitSwitch
182v)Auxilaryswitch
183vi)Fuse
184OverhaulingofACB1000amp
185OverhaulingofACB1250amp
186ReplacementofAirCircuitBreaker spare
187i)Undervoltagecoil
188ii)Trippingcoil
189iii)Closingcoil
190iv)SpringChargingMechanisam
191v)AuxilarySwitch
192Overhaulingof33KVMainIncomerPanel
193Overhaulingof3.3KVMotorFeederpanel
194Overhaulingof3.3KVMainIncomerPanel
195TestingofMainIncomer/MotorFeederPanel
196OverhaulingofRTCCPanel
197Testing&CalibrationofRelay
198RepairingABBmakeRelay
199Overhaulingof33KVOutdoorCT
200Overhaulingof33KVOutdoorPT
201Replacementof33KVCurrentTransformer
202i)IndoortypeCT
203ii)Outdoortype CT
204Replacementof33KVPotentialTtransformer
205i)IndoortypePT
206ii)Outdoortype PT
207Replacementof33kvLightningArrester
208i)IndoortypeLA
209ii)Outdoortype LA
210Replacementofindoortype3.3kvCT
211Replacementofindoortype3.3kvPT
212VCBBatteryChargerPanel
213i)TestingofBatteryBankofVCB
214ii)OverhoilingofBatteryChargerPanel
215ReplacementofDryTypeBatteryBankofVCB
216ReplacementofInverter
217ReplacementofInverterBattery
218i)100Ah
219ii)200Ah
220iii)250Ah
221Painting of Switch yard Structure at Dhuktan Sub station withonecoatofAnti-CorrosivepaintandoveritTwoCoat ofOilpaintasdirectedbyEngineerinCharge,charges includeScrappingofStructure,labouretccomplete.
222Painting of Switch yard Structure at Maswan Sub station withonecoatofAnti-CorrosivepaintandoveritTwoCoat ofOilpaintasdirectedbyEngineerinCharge,charges includeScrappingofStructure,labouretccomplete.
223Painting of CLF BridgeStructure at Dhuktan WTP with one coat of Anti-Corrosive paint and over it Two Coat of Oil paintasdirectedbyEngineerinCharge,chargesinclude ScrappingofStructure,labouretccomplete
224Painting of CRCA sheet of various Panel at Maswan HW & Dhuktan WTP with powder coated one coat of red lead paint and over it two coat enamel paint as directed by EngineerinCharge,chargesincludeScrappingof Structure,labouretccomplete
225Painting of MS Structure with one coat of Anti-Corrosive paint and over it Two Coat of Oil paint as directed by EngineerinChargeinDhuktanWTP,chargesinclude ScrappingofStructure,labouretccomplete
226ReplacementofInsulator
227i)33kvOutdoorpostinsulator
228ii)33kvIndoorinsulator
229iii)3.3kvindoorinsulator
230AllPolyPropyleneHTCapacitor
231i)TestingofCapacitorBank
232ii)ReplacementofCapacitorBank
233iii)OverhoilingofCapacitorPanel
234Supply,Errect&CommisioningofRelay
235i)ABBOverVoltage
236ii)ABBUnderVoltage
237iii)ABBOverCurrent&EarthFault
238iv)ABBMasterTrip
239v)ABBMotorProtection
240vi)ABBTripCircuitSupervision
241vii)PowerFactorControl
242viii)PLARelay
243ix)AuxilaryRelay
244x)AutomaticVoltageRegulation
245Replacement of Copper BusBar
246Replacement of Aluminium BusBar
247Replacement of Annunciator
248Replacement of Hooter
249Replacement of Temprature Scanner
250Replacement of MultiFuction Meter
251Replacement of Ammeter
252Replacement of Voltmeter
253ReplacementofPushButton
254ReplacementofPilotLamp
255ReplacementofSelectorSwitch
256ReplacementofElectronicTimmer
257ReplacementofHourMeter
258Servicing&Overhoilingofoutdoor GOD
259Servicing&OverhoilingofoutdoorDOSet
260TransformerOilFiltration
261SupplyNewTransformer Oil
262TransfomerPostInsulator
263i)HTside
264ii)LTside
265TransformerBreather
266i)ForHT Transformer
267ii)ForLTTransformer
268TransformerRewindinginFactoryincludingReplacement of Gasket, Painting of Inner & outer surface, To & Fro charges,loading&unloadingCharges
26960kvaTransformer
270100kvaTransformer
271200kvaTransformer
272415kvaTransformer
273630kvaTransformer
274750kvaTransformer
2751000kvaTransformer
276TransformerOveningforimprovingmeggervaluein FactoryincludingReplacementofGasket,Paintingof Inner & outer surface, To & Fro charges, loading & unloadingCharges
27760kvaTransformer
278100kvaTransformer
279200kvaTransformer
280415kvaTransformer
281630kvaTransformer
282750kvaTransformer
2831000kvaTransformer
284TransformerServicing&OverhoilingatSiteWashingof Coil by Oil, Attending minor leakages by replacing necessary gasket packing, tightening of Bushing & necessaryfitting,paintingoutersurface
28560kvaTransformer
286100kvaTransformer
287200kvaTransformer
288415kvaTransformer
289630kvaTransformer
290750kvaTransformer
2911000kvaTransformer
292Servicing&OverhaulingofHTTransformerOLTC TestingofRTCC&OLTC RepairingTransformerTapChanger
293Supply,Errect&CommisioningofTapPositionIndicator
294Supply,Errect&CommisioningofOilTemperature IndicatorofHTTransformer
295Supply,Errect&CommisioningofWindingTemperature IndicatorofHTTransformer
296Supply,Errect&CommisioningofMagneticOilGuageof HTTransformer
297Supply,Errect&CommisioningofBuchhlozRelayofHT Transformer
298CarryingoutTestofEquipments
299i)HighportTestofCable
300ii)InsulationResistanceTestofTransformer/Motor
301iii)WindingResistanceTestof Transformer/Motor
302iv)EarthingTestof Transformer/Motor/Panel
303v)MagneticBalancingTestofTransforme
304vi)VectorGroupTestofTransformer
305vii)PolarindexTestofTransformer
306viii)ContactResistanceTestofVCB
307ix)VibrationTestofMotor
308Supply,Erect&CommisioningofCable
309i)33Kv3core95Sq mmAlXLPE
310ii)33Kv3core120Sq mmAlXLPE
311iii)33Kv3core240SqmmAl XLPE
312iv)33Kv3core400SqmmAl XLPE
313v)4core50SqmmArmoured Al
314vi)4core25SqmmArmouredAl
315vii)3.5core95SqmmAl
316viii)3.5core50Sq mmAl
317ix)3core1SqmmAl
318x)2core1SqmmAl
319xi)1SqmmFlexible cable
320xi)2core10SqmmAl
321xii)3core10Sq mmAl
322SupplyErrect&CommisioningofCableTermination Kit
323i)33kv400SqmmIndoor
324ii)33kv300SqmmIndoor
325iii)33kv400Sqmmoutdoor
326iv)33kv300Sqmmoutdoor
327v)3.3kv240SqmmIndoor
328vi)3.3kv120SqmmIndoor
329vii)3.3kv240SqmmOutdoor
330viii)3.3kv120SqmmOutdoor
331SupplyErrect&CommisioningofCableStraightJointKit
332i)33kv400 Sqmm
333ii)33kv300 Sqmm
334iii)3.3kv240 Sqmm
335iv)3.3kv120Sqmm
336Supply,Erect,CommiosioningofExhaustFanHeavy Duty 450mm,1400RPM
337SupplyErect,Commiosioningof24WEnergyEfficient LED Tube
338SupplyErect,Commiosioningof40WEnergyEfficient LED StreetLight
339SupplyErect,Commiosioningof60WEnergyEfficient LED StreetLight
340SupplyErect,Commiosioningof100WEnergyEfficient LEDFlood Light
341SupplyErrect&CommisioningContactor
342i)Threepole63amp
343ii)Threepole100amp
344iii)Fourpole100 amp
345iv)Fourpole200amp
346v)Fourpole300 amp
347vi)Fourpole400 amp
348vii)Fourpole600amp
349SupplyErrect&CommisioningMCCB
350i)Threepole100amp
351ii)Threepole200amp
352iii)Threepole300amp
353iv)Threepole400 amp
354v)Threepole600 amp
355SupplyErrect&CommisioningMCB
356i)Singlepole6to32amp
357ii)Singlepole40to64amp
358iii)Doublepole6to32amp
359iv)Doublepole40to64amp
360v)Threepole6to32amp
361vi)Threepole40to64amp
362vii)Fourpole6to32amp
363viii)Fourpole40to64amp
364SupplyErrect&CommisioningofSwitch Gear
365i)Fn/sfu100 amp
366ii)Fn/sfu200amp
367iii)Fn/sfu250 amp
368iv)Fn/sfu300 amp
369v)Fn/sfu400amp
370vi)Fn/sfu600amp
371SupplyErrect&CommisioningofFuse
372i)5 amp
373ii)10amp
374iii)20amp
375iv)30amp
376v)50amp
377vi)100amp
378vii)200amp
379SupplyErrect&CommisioningofD.O.Fuse
380i)10amp
381ii)25amp
382iii)50amp
383SupplyErrect&CommisioningofIndoorFuse
384i)3.3kv10amp
385ii)3.3kv20amp
386iii)3.3kv30amp
387iv)33kv50amp
388v)33kv70amp
389SupplyErrect&CommisioningofHRCFuse
390i)6 amp
391ii)10amp
392iii)16amp
393iv)32amp
394v)64amp
395SupplyErrect&CommisioningofChangeOverSwitch
396i)100amp
397ii)200amp
398iii)300amp
399iv)400amp
400SupplyAlCableLugs
401i)50mm
402ii)95mm
403iii)120mm
404iv)185mm
405v)240 mm
406vi)300mm
407vii)400mm
408SupplyAlCableGland
409i)95mm
410ii)120 mm
411iii)185mm
412iv)240mm
413v)300 mm
414vi)400mm
4155ampelectricpointwithallmaterial
41616ampelectricpointwithall material
41732ampelectricpointwithall material
41864ampelectricpointwithall material
419BoilerSuite
420RainySuite
421SafetyShoes
422Hand Gloves
423GumBoot
424SafetyHelmet
425SafetyBelt
426WD40(500ml)
427CRC(500ml)
428BearingOil
429BearingGrease
430BearingHighSpeedGrease
431Providing & Fabrication of MS Structural work which is essential for Motor, Transformer, VCB, CLF,and any other WTP equipments as directed by Engineer in charge, charges include Cutting, Welding, hoisting, bolting, fixing, erectinginpositionasrequiredandapplyonecoatof Anti-Corrosive paint and over it two coat of oil paint etc complete
432Providing & Fabrication of CRCA Sheet for boxes, panel boxes etc include cutting, bending, welding, drilling, rivetingwithdulypowdercoatedonecoatofredlead paint&twocoatofenamelpaintetccomplete
433335HP VTPumpJyoti/Kirloskar/ FlowMore Make@Maswan&Dhuktan
434Re-erectionandLevelingof Pump Removingmotor
435Dismantling,Cleaning,overoilingandPump assembly Re-erectionofMotor Totalshaft runoutcheck&Epoxypaintingwithtwocoatredoxide
436Checknutofimpeller
437Copperlockwasher
438Impeller
439Impellerkey
440Wearingring
441Shaftsleeveofbellmouth
442cutleesbearingstainlesssteel
443Muff-couplingstainlesssteel
444Split-ringstainless steel
445Sleevestainless steel
446Shaftstainlesssteel
447Headshaft
448Impeller shaft
449staffingbox
450staffingbox packing
451Staffingboxbrasssleeve
452StaffingboxGlandsleeve
453Staffingboxpackingcover
454SSnutboltwithwasher
455Balancingof impeller
456Totalcouplingsetwithreachedlock
457Coppertub
458Reachedpin
459Reachedcouplingwithlock
460Reflector
461Bearinghousingcovers
462BearingSKF Make
463G Bearing
46420 mm dia.GateValve
46520mm dia.G.I Drainpipe
46620mm dia.AirValve
467CouplingBush
468Couplingnutbolt
469Gasket10mmthick
470PressureGuage
4715HP to 30 HP CentrifugalPump anyMake@ Maswan/ Shelwali
472Removing motor,Dismantling , Cleaning , overhauilingPumpassembly,Re-erectionofMotor&pump Checknutofimpeller
473Impeller
474Impellerkey
475Wearingring
476Sleevestainless steel
477Shaft key
478Headshaft
479Impeller shaft
480StaffingboxGlandsleeve
481Staffingboxpackingcover
482Balancingof impeller
483Reachedcouplingwithlock
484Bearinghousingcovers
485BearingSKF Make
486CouplingBush
487Couplingnutbolt
488Gasket05mmthick
489Sluice Valve 350mm @ Maswan & Shelwai Repair work
490Removing,Dismentling,cleaning&Re- erectionofValve
491CheckNut
492NutBolt
493Spindle
494O Ring
495Wedge
496RefluxValve350mm at Maswan& Shelwali Reapir work Removing,Dismentling,cleaning&Re- erectionofValve
497NutBolt
498O Ring
499Wedge
500ButterflyValve 250mm@Maswan & Shelwali Removing,Dismentling,cleaning&Re-
501NutBolt
502O Ring
503GearBox at Maswan& Shelwali Removing,Dismentling,Cleaning&Re-erectionofGearBox
504NutBolt
505GearORing
506WormGear
507HelicalGear
508Gear Shaft
509Roller Bearing
510Washer
511ActuatorofValve at Maswan&Shelwali Removing,Dismentling&Re-erectionof Actuator
512RewindingofMotor
513LimitSwitch
514TorqueSwitch
515HelicalPinion Gear
516LockNut
517FlashMixer/AlumAgigator at Maswan & Shelwali
518Rewindingof3 HPMotor
519Rewindingof5 HPMotor
520Rewindingof7.5HP Motor
521Servicing&overhoilingofGearBox
522Drive Shaft
523RadialFlow Paddle
524Coupling
525RewindingofMotor
526Upto2.5 HP
527Above2.5HPto 5HP
528Above5HPto7.5HP
529Above7.5HPto 10HP
530DOLstarterfor Motor
531Upto2.5 HP
532Above2.5HPto 5HP
533Above5HPto7.5HP
534Above7.5HPto 10HP
535StarDeltastarterforMotor
536Above15HP to20HP
537Above20HP to25HP
538OverhaulingofMotor
539Upto2.5 HP
540Above2.5HPto 5HP
541Above5HPto7.5HP
542Above7.5HPto 10HP
543ClarifloculatorBridg Shelwali
544SprocketWheel
545SprocketRollerChain
546DrivingWheel
547RubberScrapper
548ReductionGearBox
549SelfalignBearingofwheel
550ThrustBearingof Bridge
551RadialBearingofBridge
552EOTCrane at Maswan&Shelwali DismentlingCrane,Gearbox&Motor Re-AssemblingCrane,Gearbox&Motor
553Reverse-ForwardAssembly
554Up-DownAssembly
555Brake Coil
556Brake liner
557Brake shoe
558Clutchplatespring
559RopeDrum
560WireRope
561HelicalGear
562PinionGear
563LimitSwitch
564Auxilary Contact
565Remoteof Crane
56615HPAirCompressor at Maswan /Shelwali
567RemovingofAirCompressor&Motor ReassemblingofAirCompresor&Motor
568HP/LPPiston assembly
569PistonRing
570ConnectingRod
571HP/LPValve assembly
572Crank Shaft
573Oil seal
574HP/LP AirHead assembly
575Bush
576V -Belt
577Gasket
57850mm dia.SluiceValve
57950mm dia.RefluxValve
58050mmdia.SolenoidvalveAssembly
581FlashMixer at Maswan /Shelwali
582Removing,Dismentling&CleaningofFlash MixerwithMotor &Gearbox ReassemblingofFlashMixerwithMotor&Gearbox
583Oil seal
584Sleeve
585O ring
586Wormgear
587Bearing
588Piniongear
589MotorFan cover
590Gear pin
591Bearing Housing
592AlumAgigator at Maswan /Shelwali
593Oil seal
594O ring
595Wormgear
596Bearing
597Piniongear
598Gear pin
599Bearing Housing
600Bearing Housing

AI Tender Summary

OUR REF NO 45646710
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 15-10-2024
Authority
Authority Name Directorate Of Municipal Administration
Work Description Motor Repair And Supply Of Other Electrical Materials For Water Supply Department Of Dahanu Municipal Council.- 1 Removing of 100HP Ht. Motor 2 Fixing of 100HP Motor 3 Removing, dismantling, assembly & re-erection of 350 HP VT Pump 4 Transportation to & fromsite to workshop &back(90kmx2) 5 Cutless bearing neoprene rubber 6 Line Shaft Sleeve 7 Top shaft threaded sleeve (SS410) 8 Top Shaft (SS316) 9 Line Shaft (SS3I6) 10 ThreadedLouplin for Shafts (SS316) 11 Neoprene nibbe busheswithAluminumPiece for, bearing housing ratchet 12 Gun Metal Néck ring for bowl assembly 13 Bowl Assembly Shaft (SS 316) 14 GunMetalBushforCasingbowl&stuffing box 15 Drilling,Bushing,TappingwithRetappingto Bearing Housing with New Bolts 16 Hydra Charges 17 SS shaft throughout 18 of Pump using Tools, Bearing Pullers, Labours, etc. 19 Cleaning of Bearing Housing using Diesel Cotton Waste, Anti Sticking Liquid, etc. 20 Providing & Fixing of following Spares 21 Bearing294l6 EL — XL 22 Bearing 6020 M/C4 23 Housing Packing 24 Assembling Fitting of Bearing Housing using Mounting to Pump with Proper Alignment 25 Fixing of Motor 26 Commissioning with Test & Trials 27 To & Fro Transportation 28 Removing and dismantling of motor of EOT including Brake Linear Assembly, Gears, Wire rope using tools and labours etc. 29 Overhauling & Cleaning of Brake Linear, Brake Drum Assembly using Rustoline Cotton Waste Diesel, etc. including labour and material. 30 Providing and fixing of following Parts to EOT 31 New Brake Liner 32 New Electrical oil set for Clutch operation 10 clutch 33 On/off/up/down/left/right 10 way switch 34 Rope Guide 35 Wire Rope 10mm 36 Cable guide 37 Internal wiring of panel board with new contractors, connectors, lugs , etc 38 Assembling all parts together with test & trials. 39 Overhauling and Servicing of 3 Tonne EOT including dismantalling , cleaning, assembling & fixing with test & trial 40 Providing & fixing limit switch 41 Internal wiring of panel board with new contractors, connectors, lugs , etc 42 On/off/up/down 4 way switch 43 Assembling all parts with test and trial 44 JAW Contact 45 Trip Coil 110 V 46 Trip Coil 110 V 47 Limit Switch 2 NO + 3 NC 48 Limit Swithc 1 NO + 1 NC 49 Fuse BS2692 50 Fuse VFT 11/3A 51 ABB, REJ 601 Relay Base Model 52 Breaker control Switch (TNC) 53 Master Trip Relay 110 V DC 54 Local Remote Switch 55 Service & Installation charges 56 Dismantling of following Sluice Valves 57 a) 300 mm 58 b) 400 mm 59 c) 450 mm 60 Cleaning of all Sluicevalves internal & external using tools labours diesel cotton waste etc 61 Lapping of Sluice Valve gate sheet rings to match body sheet rings using special lapping solutions and stones 62 Providing and fixing of following spares 63 a) Nutbolts with double washers 64 b) Rubber packings 65 c) T Bolts with Nuts 66 d) Gland packings 67 Assembling of following Sluice Valves 68 a) 300 mm 69 b) 400 mm 70 c) 450 mm 71 Colouring including red oxide and paint 72 Motor Rewinding 335 HP 73 Motor Disambling 335HP 74 Motor Housing 335HP 75 Motor bearing 335HP 76 Removing & Dismantling of Bearing Housing 77 25HP motor rewinding 78 2HP motor rewinding 79 7HP motor rewinding 80 Removing & Fixing 25HP 81 Removing & Fixing 2HP 82 Removing & Fixing 07HP 83 25HP LT statar repair 84 2HP LT statar repair 85 7HP LT statar reapir 86 Contactor 10Ampstar-delta 87 Contactor 18Amp star-delta 88 Relay 6 Amp star-delta 89 Realy 12Amp star-delta 90 L&T upto 10Amp Statar 91 25Amp glass fuse 92 PVC tape 93 Aluminium Tape 94 DEO 5Amp 95 DEO 6Amp 96 Rabbur sheet 97 Oil 68 Castrol 98 Gress AP3 99 High Temp Gress 100 Air Blower pump servicing, gressing & Oiling 101 Sluice valve Greessing 300mm 102 Sluice valve Greessing 250mm 103 Sluice valve Greessing 400mm 104 Sluice valve Greessing 450mm 105 Sluice valve Greessing 100mm 106 Sluice valve Greessing 150mm 107 Sluice valve Greessing 200mm 108 Sluice Valve checknut 100mm 109 Sluice Valve checknut 150mm 110 Sluice Valve checknut 200mm 111 Sluice Valve checknut 250mm 112 Sluice Valve checknut 300mm 113 Sluice Valve checknut 400mm 114 Sluice Valve checknut 450mm 115 S.V Spindle 100mm 116 S.V Spindle 150mm 117 S.V Spindle 200mm 118 S.V Spindle 250mm 119 S.V Spindle 300mm 120 S.V Spindle 400mm 121 S.V Spindle 450mm 122 Dismantling 100mm SV 123 Dismantling 150mm SV 124 Dismantling 200mm SV 125 Dismantling 250mm SV 126 Dismantling 300mm SV 127 Dismantling 400mm SV 128 AssemblingS.V 100mm 129 AssemblingS.V 150mm 130 AssemblingS.V 200mm 131 AssemblingS.V 250mm 132 AssemblingS.V 300mm 133 AssemblingS.V 400mm 134 AssemblingS.V 450mm 135 VT pump spider 136 VT pump Spider Rubber Bushing 137 Impeller 138 Ring Impller 139 Bearing sleeve 140 Coupling Half driver 141 Coupling half pump 142 Key coupling 143 Ball coupling 144 Nut shaft adjusting 145 Gasket 146 Gland 147 pipe column 148 bearing throttle 149 plate sole 150 flange top & Bottomcolumn pipe 151 strainer 152 collet impeller lock 153 coupling shaft 154 bearing lineshaft enclosed 155 Liner bowl 156 sole plate 157 Deflector 158 Deflector 159 Overhaulingof33kvindoortypeVCB1250amp 160 Overhaulingof33kvoutdoortypeVCB1250amp 161 Overhaulingof3.3kvindoortypeVCB650amp 162 Overhaulingof3.3kvindoortypeVCB1000 amp 163 Overhaulingof3.3kvindoortypeVCB1250 amp 164 Replacement of Vaccume Circuit Breaker spare 165 i)Vaccume Intrupter 166 ii)Tulip12Fingure 167 iii)Female Epoxy Spout 168 iv)Spring Charging Motor Mechanisam 169 v)Rackin /out Machanisam 170 vi)Under voltagecoil 171 vii)Trippingcoil 172 viii)Closingcoil 173 ix)PushOn/Offswitch 174 x)ContactArm 175 Overhaulingof3.3kvVaccumeContactor400 amp 176 Overhaulingof3.3kvVaccumeContactor600 amp 177 ReplacementofVaccumeContactorspare 178 i)JawContact 179 ii)Insulator 180 iii)FemaleEpoxySpout 181 iv)LimitSwitch 182 v)Auxilaryswitch 183 vi)Fuse 184 OverhaulingofACB1000amp 185 OverhaulingofACB1250amp 186 ReplacementofAirCircuitBreaker spare 187 i)Undervoltagecoil 188 ii)Trippingcoil 189 iii)Closingcoil 190 iv)SpringChargingMechanisam 191 v)AuxilarySwitch 192 Overhaulingof33KVMainIncomerPanel 193 Overhaulingof3.3KVMotorFeederpanel 194 Overhaulingof3.3KVMainIncomerPanel 195 TestingofMainIncomer/MotorFeederPanel 196 OverhaulingofRTCCPanel 197 Testing&CalibrationofRelay 198 RepairingABBmakeRelay 199 Overhaulingof33KVOutdoorCT 200 Overhaulingof33KVOutdoorPT 201 Replacementof33KVCurrentTransformer 202 i)IndoortypeCT 203 ii)Outdoortype CT 204 Replacementof33KVPotentialTtransformer 205 i)IndoortypePT 206 ii)Outdoortype PT 207 Replacementof33kvLightningArrester 208 i)IndoortypeLA 209 ii)Outdoortype LA 210 Replacementofindoortype3.3kvCT 211 Replacementofindoortype3.3kvPT 212 VCBBatteryChargerPanel 213 i)TestingofBatteryBankofVCB 214 ii)OverhoilingofBatteryChargerPanel 215 ReplacementofDryTypeBatteryBankofVCB 216 ReplacementofInverter 217 ReplacementofInverterBattery 218 i)100Ah 219 ii)200Ah 220 iii)250Ah 221 Painting of Switch yard Structure at Dhuktan Sub station withonecoatofAnti-CorrosivepaintandoveritTwoCoat ofOilpaintasdirectedbyEngineerinCharge,charges includeScrappingofStructure,labouretccomplete. 222 Painting of Switch yard Structure at Maswan Sub station withonecoatofAnti-CorrosivepaintandoveritTwoCoat ofOilpaintasdirectedbyEngineerinCharge,charges includeScrappingofStructure,labouretccomplete. 223 Painting of CLF BridgeStructure at Dhuktan WTP with one coat of Anti-Corrosive paint and over it Two Coat of Oil paintasdirectedbyEngineerinCharge,chargesinclude ScrappingofStructure,labouretccomplete 224 Painting of CRCA sheet of various Panel at Maswan HW & Dhuktan WTP with powder coated one coat of red lead paint and over it two coat enamel paint as directed by EngineerinCharge,chargesincludeScrappingof Structure,labouretccomplete 225 Painting of MS Structure with one coat of Anti-Corrosive paint and over it Two Coat of Oil paint as directed by EngineerinChargeinDhuktanWTP,chargesinclude ScrappingofStructure,labouretccomplete 226 ReplacementofInsulator 227 i)33kvOutdoorpostinsulator 228 ii)33kvIndoorinsulator 229 iii)3.3kvindoorinsulator 230 AllPolyPropyleneHTCapacitor 231 i)TestingofCapacitorBank 232 ii)ReplacementofCapacitorBank 233 iii)OverhoilingofCapacitorPanel 234 Supply,Errect&CommisioningofRelay 235 i)ABBOverVoltage 236 ii)ABBUnderVoltage 237 iii)ABBOverCurrent&EarthFault 238 iv)ABBMasterTrip 239 v)ABBMotorProtection 240 vi)ABBTripCircuitSupervision 241 vii)PowerFactorControl 242 viii)PLARelay 243 ix)AuxilaryRelay 244 x)AutomaticVoltageRegulation 245 Replacement of Copper BusBar 246 Replacement of Aluminium BusBar 247 Replacement of Annunciator 248 Replacement of Hooter 249 Replacement of Temprature Scanner 250 Replacement of MultiFuction Meter 251 Replacement of Ammeter 252 Replacement of Voltmeter 253 ReplacementofPushButton 254 ReplacementofPilotLamp 255 ReplacementofSelectorSwitch 256 ReplacementofElectronicTimmer 257 ReplacementofHourMeter 258 Servicing&Overhoilingofoutdoor GOD 259 Servicing&OverhoilingofoutdoorDOSet 260 TransformerOilFiltration 261 SupplyNewTransformer Oil 262 TransfomerPostInsulator 263 i)HTside 264 ii)LTside 265 TransformerBreather 266 i)ForHT Transformer 267 ii)ForLTTransformer 268 TransformerRewindinginFactoryincludingReplacement of Gasket, Painting of Inner & outer surface, To & Fro charges,loading&unloadingCharges 269 60kvaTransformer 270 100kvaTransformer 271 200kvaTransformer 272 415kvaTransformer 273 630kvaTransformer 274 750kvaTransformer 275 1000kvaTransformer 276 TransformerOveningforimprovingmeggervaluein FactoryincludingReplacementofGasket,Paintingof Inner & outer surface, To & Fro charges, loading & unloadingCharges 277 60kvaTransformer 278 100kvaTransformer 279 200kvaTransformer 280 415kvaTransformer 281 630kvaTransformer 282 750kvaTransformer 283 1000kvaTransformer 284 TransformerServicing&OverhoilingatSiteWashingof Coil by Oil, Attending minor leakages by replacing necessary gasket packing, tightening of Bushing & necessaryfitting,paintingoutersurface 285 60kvaTransformer 286 100kvaTransformer 287 200kvaTransformer 288 415kvaTransformer 289 630kvaTransformer 290 750kvaTransformer 291 1000kvaTransformer 292 Servicing&OverhaulingofHTTransformerOLTC TestingofRTCC&OLTC RepairingTransformerTapChanger 293 Supply,Errect&CommisioningofTapPositionIndicator 294 Supply,Errect&CommisioningofOilTemperature IndicatorofHTTransformer 295 Supply,Errect&CommisioningofWindingTemperature IndicatorofHTTransformer 296 Supply,Errect&CommisioningofMagneticOilGuageof HTTransformer 297 Supply,Errect&CommisioningofBuchhlozRelayofHT Transformer 298 CarryingoutTestofEquipments 299 i)HighportTestofCable 300 ii)InsulationResistanceTestofTransformer/Motor 301 iii)WindingResistanceTestof Transformer/Motor 302 iv)EarthingTestof Transformer/Motor/Panel 303 v)MagneticBalancingTestofTransforme 304 vi)VectorGroupTestofTransformer 305 vii)PolarindexTestofTransformer 306 viii)ContactResistanceTestofVCB 307 ix)VibrationTestofMotor 308 Supply,Erect&CommisioningofCable 309 i)33Kv3core95Sq mmAlXLPE 310 ii)33Kv3core120Sq mmAlXLPE 311 iii)33Kv3core240SqmmAl XLPE 312 iv)33Kv3core400SqmmAl XLPE 313 v)4core50SqmmArmoured Al 314 vi)4core25SqmmArmouredAl 315 vii)3.5core95SqmmAl 316 viii)3.5core50Sq mmAl 317 ix)3core1SqmmAl 318 x)2core1SqmmAl 319 xi)1SqmmFlexible cable 320 xi)2core10SqmmAl 321 xii)3core10Sq mmAl 322 SupplyErrect&CommisioningofCableTermination Kit 323 i)33kv400SqmmIndoor 324 ii)33kv300SqmmIndoor 325 iii)33kv400Sqmmoutdoor 326 iv)33kv300Sqmmoutdoor 327 v)3.3kv240SqmmIndoor 328 vi)3.3kv120SqmmIndoor 329 vii)3.3kv240SqmmOutdoor 330 viii)3.3kv120SqmmOutdoor 331 SupplyErrect&CommisioningofCableStraightJointKit 332 i)33kv400 Sqmm 333 ii)33kv300 Sqmm 334 iii)3.3kv240 Sqmm 335 iv)3.3kv120Sqmm 336 Supply,Erect,CommiosioningofExhaustFanHeavy Duty 450mm,1400RPM 337 SupplyErect,Commiosioningof24WEnergyEfficient LED Tube 338 SupplyErect,Commiosioningof40WEnergyEfficient LED StreetLight 339 SupplyErect,Commiosioningof60WEnergyEfficient LED StreetLight 340 SupplyErect,Commiosioningof100WEnergyEfficient LEDFlood Light 341 SupplyErrect&CommisioningContactor 342 i)Threepole63amp 343 ii)Threepole100amp 344 iii)Fourpole100 amp 345 iv)Fourpole200amp 346 v)Fourpole300 amp 347 vi)Fourpole400 amp 348 vii)Fourpole600amp 349 SupplyErrect&CommisioningMCCB 350 i)Threepole100amp 351 ii)Threepole200amp 352 iii)Threepole300amp 353 iv)Threepole400 amp 354 v)Threepole600 amp 355 SupplyErrect&CommisioningMCB 356 i)Singlepole6to32amp 357 ii)Singlepole40to64amp 358 iii)Doublepole6to32amp 359 iv)Doublepole40to64amp 360 v)Threepole6to32amp 361 vi)Threepole40to64amp 362 vii)Fourpole6to32amp 363 viii)Fourpole40to64amp 364 SupplyErrect&CommisioningofSwitch Gear 365 i)Fn/sfu100 amp 366 ii)Fn/sfu200amp 367 iii)Fn/sfu250 amp 368 iv)Fn/sfu300 amp 369 v)Fn/sfu400amp 370 vi)Fn/sfu600amp 371 SupplyErrect&CommisioningofFuse 372 i)5 amp 373 ii)10amp 374 iii)20amp 375 iv)30amp 376 v)50amp 377 vi)100amp 378 vii)200amp 379 SupplyErrect&CommisioningofD.O.Fuse 380 i)10amp 381 ii)25amp 382 iii)50amp 383 SupplyErrect&CommisioningofIndoorFuse 384 i)3.3kv10amp 385 ii)3.3kv20amp 386 iii)3.3kv30amp 387 iv)33kv50amp 388 v)33kv70amp 389 SupplyErrect&CommisioningofHRCFuse 390 i)6 amp 391 ii)10amp 392 iii)16amp 393 iv)32amp 394 v)64amp 395 SupplyErrect&CommisioningofChangeOverSwitch 396 i)100amp 397 ii)200amp 398 iii)300amp 399 iv)400amp 400 SupplyAlCableLugs 401 i)50mm 402 ii)95mm 403 iii)120mm 404 iv)185mm 405 v)240 mm 406 vi)300mm 407 vii)400mm 408 SupplyAlCableGland 409 i)95mm 410 ii)120 mm 411 iii)185mm 412 iv)240mm 413 v)300 mm 414 vi)400mm 415 5ampelectricpointwithallmaterial 416 16ampelectricpointwithall material 417 32ampelectricpointwithall material 418 64ampelectricpointwithall material 419 BoilerSuite 420 RainySuite 421 SafetyShoes 422 Hand Gloves 423 GumBoot 424 SafetyHelmet 425 SafetyBelt 426 WD40(500ml) 427 CRC(500ml) 428 BearingOil 429 BearingGrease 430 BearingHighSpeedGrease 431 Providing & Fabrication of MS Structural work which is essential for Motor, Transformer, VCB, CLF,and any other WTP equipments as directed by Engineer in charge, charges include Cutting, Welding, hoisting, bolting, fixing, erectinginpositionasrequiredandapplyonecoatof Anti-Corrosive paint and over it two coat of oil paint etc complete 432 Providing & Fabrication of CRCA Sheet for boxes, panel boxes etc include cutting, bending, welding, drilling, rivetingwithdulypowdercoatedonecoatofredlead paint&twocoatofenamelpaintetccomplete 433 335HP VTPumpJyoti/Kirloskar/ FlowMore Make@Maswan&Dhuktan 434 Re-erectionandLevelingof Pump Removingmotor 435 Dismantling,Cleaning,overoilingandPump assembly Re-erectionofMotor Totalshaft runoutcheck&Epoxypaintingwithtwocoatredoxide 436 Checknutofimpeller 437 Copperlockwasher 438 Impeller 439 Impellerkey 440 Wearingring 441 Shaftsleeveofbellmouth 442 cutleesbearingstainlesssteel 443 Muff-couplingstainlesssteel 444 Split-ringstainless steel 445 Sleevestainless steel 446 Shaftstainlesssteel 447 Headshaft 448 Impeller shaft 449 staffingbox 450 staffingbox packing 451 Staffingboxbrasssleeve 452 StaffingboxGlandsleeve 453 Staffingboxpackingcover 454 SSnutboltwithwasher 455 Balancingof impeller 456 Totalcouplingsetwithreachedlock 457 Coppertub 458 Reachedpin 459 Reachedcouplingwithlock 460 Reflector 461 Bearinghousingcovers 462 BearingSKF Make 463 G Bearing 464 20 mm dia.GateValve 465 20mm dia.G.I Drainpipe 466 20mm dia.AirValve 467 CouplingBush 468 Couplingnutbolt 469 Gasket10mmthick 470 PressureGuage 471 5HP to 30 HP CentrifugalPump anyMake@ Maswan/ Shelwali 472 Removing motor,Dismantling , Cleaning , overhauilingPumpassembly,Re-erectionofMotor&pump Checknutofimpeller 473 Impeller 474 Impellerkey 475 Wearingring 476 Sleevestainless steel 477 Shaft key 478 Headshaft 479 Impeller shaft 480 StaffingboxGlandsleeve 481 Staffingboxpackingcover 482 Balancingof impeller 483 Reachedcouplingwithlock 484 Bearinghousingcovers 485 BearingSKF Make 486 CouplingBush 487 Couplingnutbolt 488 Gasket05mmthick 489 Sluice Valve 350mm @ Maswan & Shelwai Repair work 490 Removing,Dismentling,cleaning&Re- erectionofValve 491 CheckNut 492 NutBolt 493 Spindle 494 O Ring 495 Wedge 496 RefluxValve350mm at Maswan& Shelwali Reapir work Removing,Dismentling,cleaning&Re- erectionofValve 497 NutBolt 498 O Ring 499 Wedge 500 ButterflyValve 250mm@Maswan & Shelwali Removing,Dismentling,cleaning&Re- 501 NutBolt 502 O Ring 503 GearBox at Maswan& Shelwali Removing,Dismentling,Cleaning&Re-erectionofGearBox 504 NutBolt 505 GearORing 506 WormGear 507 HelicalGear 508 Gear Shaft 509 Roller Bearing 510 Washer 511 ActuatorofValve at Maswan&Shelwali Removing,Dismentling&Re-erectionof Actuator 512 RewindingofMotor 513 LimitSwitch 514 TorqueSwitch 515 HelicalPinion Gear 516 LockNut 517 FlashMixer/AlumAgigator at Maswan & Shelwali 518 Rewindingof3 HPMotor 519 Rewindingof5 HPMotor 520 Rewindingof7.5HP Motor 521 Servicing&overhoilingofGearBox 522 Drive Shaft 523 RadialFlow Paddle 524 Coupling 525 RewindingofMotor 526 Upto2.5 HP 527 Above2.5HPto 5HP 528 Above5HPto7.5HP 529 Above7.5HPto 10HP 530 DOLstarterfor Motor 531 Upto2.5 HP 532 Above2.5HPto 5HP 533 Above5HPto7.5HP 534 Above7.5HPto 10HP 535 StarDeltastarterforMotor 536 Above15HP to20HP 537 Above20HP to25HP 538 OverhaulingofMotor 539 Upto2.5 HP 540 Above2.5HPto 5HP 541 Above5HPto7.5HP 542 Above7.5HPto 10HP 543 ClarifloculatorBridg Shelwali 544 SprocketWheel 545 SprocketRollerChain 546 DrivingWheel 547 RubberScrapper 548 ReductionGearBox 549 SelfalignBearingofwheel 550 ThrustBearingof Bridge 551 RadialBearingofBridge 552 EOTCrane at Maswan&Shelwali DismentlingCrane,Gearbox&Motor Re-AssemblingCrane,Gearbox&Motor 553 Reverse-ForwardAssembly 554 Up-DownAssembly 555 Brake Coil 556 Brake liner 557 Brake shoe 558 Clutchplatespring 559 RopeDrum 560 WireRope 561 HelicalGear 562 PinionGear 563 LimitSwitch 564 Auxilary Contact 565 Remoteof Crane 566 15HPAirCompressor at Maswan /Shelwali 567 RemovingofAirCompressor&Motor ReassemblingofAirCompresor&Motor 568 HP/LPPiston assembly 569 PistonRing 570 ConnectingRod 571 HP/LPValve assembly 572 Crank Shaft 573 Oil seal 574 HP/LP AirHead assembly 575 Bush 576 V -Belt 577 Gasket 578 50mm dia.SluiceValve 579 50mm dia.RefluxValve 580 50mmdia.SolenoidvalveAssembly 581 FlashMixer at Maswan /Shelwali 582 Removing,Dismentling&CleaningofFlash MixerwithMotor &Gearbox ReassemblingofFlashMixerwithMotor&Gearbox 583 Oil seal 584 Sleeve 585 O ring 586 Wormgear 587 Bearing 588 Piniongear 589 MotorFan cover 590 Gear pin 591 Bearing Housing 592 AlumAgigator at Maswan /Shelwali 593 Oil seal 594 O ring 595 Wormgear 596 Bearing 597 Piniongear 598 Gear pin 599 Bearing Housing 600 Bearing Housing
Basic Detail
Tender No DMC/2024-25/water/3
Bidding Type Tender
Location
City dahanu
State Maharashtra
Key Dates
Publish Date 08 Oct 2024
Submission Date 15 Oct 2024
Open Date 17 Oct 2024
Finance
Tender Value Ref. Documents
Tender Fee 2360
EMD 20000
Exemption Not Available
Document List
bdbd4b70-b251-4eb9-aca3-ec23de0e4e0e.html
BOQ_1935139.xls
NIT.pdf
tenderdocsmotorrepair.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 08, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 15, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 17, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

bdbd4b70-b251-4eb9-aca3-ec23de0e4e0e.html

xls

BOQ_1935139.xls

pdf

NIT.pdf

pdf

tenderdocsmotorrepair.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders