}

Tender For Deposit Work Under Edd-I Baraut, Information Related To Jhatpat/Nivesh Mitra/Deposit Scheme Under Electricity Distribution Division-First Baraut. Delivery Of The Following Material From The Power Storage Center Baghpat/Baraut/Meerut To The 33/1, baraut-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Deposit Work Under Edd-I Baraut, Information Related To Jhatpat/Nivesh Mitra/Deposit Scheme Under Electricity Distribution Division-First Baraut. Delivery Of The Following Material From The Power Storage Center Baghpat/Baraut/Meerut To The 33/1. Submission Date for this Tender is 14-10-2024. Electrification Work Tenders in baraut Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

45643124
Tender For Deposit Work Under Edd-I Baraut, Information Related To Jhatpat/Nivesh Mitra/Deposit Scheme Under Electricity Distribution Division-First Baraut. Delivery Of The Following Material From The Power Storage Center Baghpat/Baraut/Meerut To The 33/1
Tender
Indian
Uttar Pradesh
Baraut
14-10-2024

Tender Details

Tender For Deposit Work Under Edd-I Baraut, Information related to Jhatpat/Nivesh Mitra/Deposit Scheme under Electricity Distribution Division-First Baraut. Delivery of the following material from the power storage center Baghpat/Baraut/Meerut to the 33/11 KV substation/work site, which includes loading and unloading. ST Pole (11m), PCC Pole (8.5m) 10/16 kva converter 25kva converter 63 kva converter 100 kva converter 250kva converter Transportation work of 70/120/185 Sq.MM size XLPE cable from Power Storage Centre-Baghpat Meerut to the site. Transportation of line material like 11 KV Pin, 11 KV Pin Insulator, 11 KV Disc, Stay Wire ACSR Weasel Conductor etc. Work of transportation of (1X16+1X25Sq.MM) single phase SB cable from Power Storage Center Baghpat/Meerut. Transportation work of LT ABC (3X50+1X35+1X16 Sq.MM), (3X95+1X70+1X16Sq.MM) and (3X120+1X95+1X16) Sq.MM. Work of erecting 8.5/11 meter PCC pole by digging deep pit. To make double pole, erecting the pole by digging a pit and then filling the pit again. Plinth construction work to house 250/400/KVA transformer. The work of obtaining 250/400/KVA transformer from the storage center and installing it on the plinth and making cable connections. Jointing cable box work of 70/120/185 Sq.MM cable (Joying cable box kit will be payable by the department. The work of earthing of metering cubicles/converters by doing water level/chemical earthing as per RESPO standards in which decentralized material will be paid by the tenderer. Work of installing all the material on double pole. Holding clamp with nut bolt 11kv pin insulator with pin 11 KV Disc Insulator with Fittings SS Channel 125X65X1300 mm T-Off SS Channel 125X65X2240 mm Top SS Channel 100X50X2028 MM Dropper SS Angle 75X75X6X2028 mm (Converter Base) Polo grouting work. Installation of stays (including grouting). Work of installing 25/63/100 KVA transformer on double pole. The work of earthing the neutral and body of the transformer. Gudging work of HT lines (GI wire material will be paid by the tenderer) Line construction work by A.C.S.R. Weasel conductor. Work of making LT single face (1X25+1X16) Sq.MM ABC line. एल०टी० ए०बी०सी० (3X50+1X35+1X16 Sq.MM) (3X95+1X70+1X16Sq.MM) एंव Work of making line of (3X120+1X95+1X16) Sq.MM. Connecting the consumer by making a jumper from the HT side and connecting the cable from the LT site. Laying of overhead XLPE 11 KV cable (by placing clamps/packing at appropriate distance through earthing/staywire between two poles) as per site requirement (decentralized material) As per requirement, laying of underground cables through XLPE cables through HDEP pipes of 4/6 inch width. (Payable by pipe tenderer) Collecting 11 KV metering cubicle, CT-PT unit, cable jointing kit (3/4 nos.) from the storage center and delivering it to the installation site, filling the cable box and connecting it to the line and connecting it to the CT-PT unit in the 11 KV metering cubicle metering room. Energizing the combination by applying. (The meter on the connection will be installed by the department.) Fasing work of 250/400 KVA distribution transformers including earthing. LT TELNESS FUSE UNIT INSTALLATION (INCLUDING FUSE) Material payable by the tenderer LT clamp nut with bolt Holding clamp with nut bolt F clamp nut with bolt

Key Value

Document Fees
INR 1180 /-
EMD
INR 10000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail