| 1 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 2 | Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of clamps and stacking. |
| 3 | Dismantling one Channel cross arm from existing DP structure, and bringing back to section store. |
| 4 | Dismantling (without damage) one HT stay incl. back filling, and bringing back to section store. |
| 5 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. |
| 6 | Dismantling transformer station in DP structure excluding the rate of dismantling earthing |
| 7 | Dismanling transformer station with transformer erected in plinth excluding the rate of dismantling transformer |
| 8 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). |
| 9 | Dismantling of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16 (Street Light) +1 x 50 Sq.mm. (Insulated Messenger) |
| 10 | Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. and stacking the same. |
| 11 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 12 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 13 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls. |
| 14 | Dismantling one section fuse |
| 15 | Loading LT PSC pole to Hand cart from the stacking place and unloading the same at work site. |
| 16 | Transporting one LT PSC pole by Hand cart - limited to 4km (excluding loading and unloading). |
| 17 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 18 | Insertion of one LT PSC pole in existing 3ph OH line incl. digging & back filling pit, fitting cross arm, insulator, binding etc. |
| 19 | Providing Strut using LT PSC pole incl. digging & back filling pit. |
| 20 | Providing Stay for LT poles incl. digging & back filling pit. |
| 21 | Providing WP support with PSC pole incl. digging & back filling pit. |
| 22 | Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 23 | Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 24 | Stringing one km LT Sph 3 wire line (Rabbit for Ph&N, Weasel for St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 25 | Stringing one km LT 3ph 5 wire line (Rabbit for Ph and Weasel for N&St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 26 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. |
| 27 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. |
| 28 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 29 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 30 | Redoing Sph WP S/C complete incl. changing WP, E/Meter, cut-out, neutral link etc, and conveyance of material. |
| 31 | Redoing 3ph WP S/C complete incl. changing WP, E/Meter, cut-out, neutral link etc, and conveyance of material. |
| 32 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. |
| 33 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 34 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 35 | Dismantling 2 line spacer from the existing LT OH line. |
| 36 | Dismantling 3 line spacer from the existing LT OH line. |
| 37 | Providing/Inserting 2 line spacer on the existing LT OH line. |
| 38 | Providing/Inserting 3 line spacer on the existing LT OH line. |
| 39 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 40 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 41 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 42 | Erection of suspension clamp for LT ABC of any size |
| 43 | Singe Phase Satellite connectors upto 4 service main connections (25-95 ABC/2.5-25 sqmm SM wire-2No) |
| 44 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 45 | Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking. |
| 46 | Loading HT PSC pole to Hand cart from the stacking place and unloading the same at work site. |
| 47 | Transporting one HT PSC pole by Hand cart (limited to 4km). |
| 48 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 49 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 50 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 51 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 52 | Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 53 | Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses. |
| 54 | Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation. |
| 55 | Erecting one 160kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation. |
| 56 | Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation |
| 57 | Providing yard metalling with 6mm & 40mm thick blue metal as specified after constructing a curb wall. |
| 58 | Fitting one set AB switch and giving connection |
| 59 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. |
| 60 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. |
| 61 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. |
| 62 | Additional rate for providing one disc set on any type of HT pole for making cut point. |
| 63 | Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole |
| 64 | Fitting one Additional 3m Channel cross arm (35x35x5mm), in existing 11kV DP incl. conveyance of materials. |
| 65 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
| 66 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. |
| 67 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 68 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 69 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 70 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 71 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 72 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. |
| 73 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line. |
| 74 | Insertion of one HT A type pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc. |
| 75 | Insertion of one HT PSC pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc. |
| 76 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 77 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 78 | Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking. |
| 79 | Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling |
| 80 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 81 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). |
| 82 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. |
| 83 | Additional rate for excavation of Pit for A type pole in Soft Rock. |