Punjab Water Supply And Sewerage Board has published Tender For Survey, Soil Testing, Design,Supply And Const,Install. Commissioning Of 15.00 Mld Capacity Stp Cum 30.00 Kld Fstp At Kharar. Operation And Maintenance For A Period Of 60 Months After Stabilization Period Of 3 Months Or More.. Submission Date for this Tender is 11-11-2024. Soil Survey Tenders in kharar Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrigendum | CorrigendumType | NewSubmissionDate |
1 | 04-10-2024 | Survey, Soil Testing, Design,Supply and Const,Install. Commissioning of 15.00 MLD Capacity STP cum 30.00 KLD FSTP at Kharar. Operation and Maintenance for a period of 60 months after stabilization period of 3 months or more. | Date | 28-10-2024 |
2 | 07-11-2024 | Survey, Soil Testing, Design,Supply and Const,Install. Commissioning of 15.00 MLD Capacity STP cum 30.00 KLD FSTP at Kharar. Operation and Maintenance for a period of 60 months after stabilization period of 3 month or more. | Other | 11-11-2024 |
3 | 10-10-2024 | Survey, Soil Testing, Design,Supply and Const,Install. Commissioning of 15.00 MLD Capacity STP cum 30.00 KLD FSTP at Kharar. Operation and Maintenance for a period of 60 months after stabilization period of 3 months or more. | Other | 28-10-2024 |
4 | 25-10-2024 | Survey,Soil testing, Design,Supply and Const,Install. Commissioning of 15.00 MLD Capacity STP cum 30.00 KLD FSTP at Kharar. Operation and Maintenance for a period of 60 months after stabilization period of 3 month or more | Other | 11-11-2024 |
5 | 25-10-2024 | Survey,Soil Testing, Design,Supply and Const,Install. Commissioning of 15.00 MLD Capacity STP cum 30.00 KLD FSTP at Kharar. Operation and Maintenance for a period of 60 months after stabilization period of3 months or more. | Date | 11-11-2024 |