Tender For 1. Renovation Of Pue School Building (2 Class Room ) West Facing At 57,Kulamanikkamhabitationin 57,Kulamanikkampanchayat, 2. Renovation Of Pue School Toiletnorth Facing At 57,Kulamanikkamhabitationin 57,Kulamanikkampanchayat,3. Renovation Of Pu
Tender Overview
Project Description
1. Renovation of PUE School Building (2 Class Room ) West Facing at 57,KulamanikkamHabitationin 57,KulamanikkamPanchayat, 2. Renovation of PUE School ToiletNorth Facing at 57,KulamanikkamHabitationin 57,KulamanikkamPanchayat,3. Renovation of PUE School ToiletEast Facing at AnnukudiHabitationin 57,KulamanikkamPanchayat, 4. Renovation of PUE School ToiletWest Facingin 57,KulamanikkamPanchayat,5. Renovation of PUE School ToiletWest Facing(North Side) at AnnukudiHabitationin 57,KulamanikkamPanchayat. SIDS - 2024-25 Kottur Block - Tiruvarur Dist, Package no : 02
BOQ
| Sl. No. | Item Description |
| 1 | 1. Renovation of PUE School Building (2 Class Room ) West Facing at 57,KulamanikkamHabitationin 57,KulamanikkamPanchayat, |
| 2 | Dismantaling of Grano-Flooring in Cement mortarIncluding all labour Charges. As per standard Specification |
| 3 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mmISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum |
| 4 | Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. |
| 5 | Repair todoor and Window including all cost of convenyence,.and all labour charges etccomplete,. |
| 6 | Repair todoor and Window including all cost of convenyence,.and all labour charges etccomplete,. (4 Nos) |
| 7 | Pointing with cement mortar 1:3 to full depth of tilesusingcrudeoil 10% byweight of cementincluding cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm |
| 8 | Provision for Teacher Cubboard: |
| 9 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 10 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 11 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 12 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 13 | Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 . |
| 14 | Provision for Students Cubboard: |
| 15 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 16 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 17 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 18 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 19 | Provision for Cheppal Rack : |
| 20 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 21 | Supplying and fixing following thickness of cuddapah slab for cupboard |
| 22 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 23 | Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed |
| 24 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 25 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 26 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 27 | Painting two coats over Old Iron works such as Wood doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 28 | Provision for MagneticName Board |
| 29 | Black Board Painting |
| 30 | Electrical Work: |
| 31 | Light Point |
| 32 | Fan Point |
| 33 | Tube light Fitting |
| 34 | Plug Point |
| 35 | Ceiling Fan |
| 36 | Provision for Drinking arrangements :- |
| 37 | Dismantling the Existing Damagedcement Plasteringincluding allchages etc for complete |
| 38 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, |
| 39 | Collection and supply of sandand filling in to the basement including cost and |
| 40 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, |
| 41 | Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed |
| 42 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 43 | Providing granolithicfloor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum. |
| 44 | Dadooing walls Plain Galzed tiles of size 150x150x6mm cost and conveyance of all materials to site and all labour charges etc completefor10 Sqm |
| 45 | Provision for PVC Pipe,Tank and Tap arrangements |
| 46 | Painting ( Picture Painting for School building ) withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta ( BALA Painting) |
| 47 | Provision for Rainwater Arrangements |
| 48 | Provision for Springs |
| 49 | Provision for Name board |
| 50 | 2. Renovation of PUE School ToiletNorth Facing at 57,KulamanikkamHabitationin 57,KulamanikkamPanchayat, |
| 51 | Dismantaling of eixisting damaged cement Plastered Including all labour Charges and removing depris from the work site etc, complete.,… |
| 52 | Dismantaling of eixisting damaged cement Plastered Including all labour Charges and removing depris from the work site etc, complete.,… |
| 53 | Paving the floor with pre-polished anti-skid tiles of 20mm thick approved quality and colour laidIncluding all labour Charges and removing depris from the work site etc, complete.,… |
| 54 | Paving the Wall Tilesapproved quality and colour laidIncluding all labour Charges and removing depris from the work site etc, complete.,… |
| 55 | Plastering with CM 1:5,12mm thick. complete complying with standard specifications and as directed by the departmental officers. |
| 56 | Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers. |
| 57 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 58 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 59 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 60 | Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 61 | Repair todoor and Window including all cost of convenyence,.and all labour charges etccomplete,. |
| 62 | Perovision for Leach Pit |
| 63 | Provision for air Water supplyArrangment |
| 64 | Provision for Sanitary PipeArrangment |
| 65 | Perovision for Name Board Chatges |
| 66 | 3. Renovation of PUE School ToiletEast Facing at AnnukudiHabitationin 57,KulamanikkamPanchayat, |
| 67 | Dismantaling of eixisting damaged cement Plastered Including all labour Charges and removing depris from the work site etc, complete.,… |
| 68 | Dismantaling of eixisting damaged cement Plastered Including all labour Charges and removing depris from the work site etc, complete.,… |
| 69 | Paving the floor with pre-polished anti-skid tiles of 20mm thick approved quality and colour laidIncluding all labour Charges and removing depris from the work site etc, complete.,… |
| 70 | Paving the Wall Tilesapproved quality and colour laidIncluding all labour Charges and removing depris from the work site etc, complete.,… |
| 71 | Plastering with CM 1:5,12mm thick. complete complying with standard specifications and as directed by the departmental officers. |
| 72 | Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers. |
| 73 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 74 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 75 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 76 | Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 77 | Repair todoor and Window including all cost of convenyence,.and all labour charges etccomplete,. |
| 78 | Perovision for Leach Pit |
| 79 | Provision for air Water supplyArrangment |
| 80 | Provision for Sanitary PipeArrangment |
| 81 | Perovision for Name Board Chatges |
| 82 | 4. Renovation of PUE School ToiletWest Facingin 57,KulamanikkamPanchayat, |
| 83 | Dismantaling of eixisting damaged cement Plastered Including all labour Charges and removing depris from the work site etc, complete.,… |
| 84 | Dismantaling of eixisting damaged cement Plastered Including all labour Charges and removing depris from the work site etc, complete.,… |
| 85 | Paving the floor with pre-polished anti-skid tiles of 20mm thick approved quality and colour laidIncluding all labour Charges and removing depris from the work site etc, complete.,… |
| 86 | Paving the Wall Tilesapproved quality and colour laidIncluding all labour Charges and removing depris from the work site etc, complete.,… |
| 87 | Plastering with CM 1:5,12mm thick. complete complying with standard specifications and as directed by the departmental officers. |
| 88 | Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers. |
| 89 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 90 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 91 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 92 | Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 93 | Repair todoor and Window including all cost of convenyence,.and all labour charges etccomplete,. |
| 94 | Provision for air Water supplyArrangment |
| 95 | Provision for Sanitary PipeArrangment |
| 96 | Perovision for Name Board Chatges |
| 97 | 5. Renovation of PUE School ToiletWest Facing(North Side) at AnnukudiHabitationin 57,KulamanikkamPanchayat, |
| 98 | Dismantaling of eixisting damaged cement Plastered Including all labour Charges and removing depris from the work site etc, complete.,… |
| 99 | Dismantaling of eixisting damaged cement Plastered Including all labour Charges and removing depris from the work site etc, complete.,… |
| 100 | Paving the floor with pre-polished anti-skid tiles of 20mm thick approved quality and colour laidIncluding all labour Charges and removing depris from the work site etc, complete.,… |
| 101 | Paving the Wall Tilesapproved quality and colour laidIncluding all labour Charges and removing depris from the work site etc, complete.,… |
| 102 | Plastering with CM 1:5,12mm thick. complete complying with standard specifications and as directed by the departmental officers. |
| 103 | Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers. |
| 104 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 105 | Distemperingtwo coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 106 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 107 | Painting two coats over Old Wood works such as Wood doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with sta |
| 108 | Repair todoor and Window including all cost of convenyence,.and all labour charges etccomplete,. |
| 109 | Perovision for Leach Pit |
| 110 | Provision for air Water supplyArrangment |
| 111 | Provision for Sanitary PipeArrangment |
| 112 | Perovision for Name Board Chatges |
| 113 | GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amountabove this row in column \"BB\" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender