| 1 | Sub Heading 1 |
| 2 | Earth work excavation in trenches not exceeding 1.50 mtr wide & depth & getting out in hard core (All as per directed by site incharge) |
| 3 | Providing & laying PCC (1:4:8) ty D2 in foundation (All as per directed by site incharge) |
| 4 | Providing & laying RCC (1:2:4) as in Coln (All as per directed by site incharge) |
| 5 | Brick work in cm (1:6) with colns ‘B’ Brick Modular (All as per directed by site incharge) |
| 6 | Providing & laying RCC (1:2:4) type B1(All as per directed by site incharge) |
| 7 | Use & waste form work to RCC coln (All as per directed by site incharge) |
| 8 | Use & waste form work PB (All as per directed by site incharge) |
| 9 | Use & waste form work to LB (All as per directed by site incharge) |
| 10 | RCC (1:2:4) Type B1 for LB (All as per directed by site incharge) |
| 11 | ½ Brick wall in Cm (1:4) with modular Bricks (All as per directed by site incharge) |
| 12 | Providing & laying in position of reinforcement 8 to 16 mm dia MS wire, cut to length & bend to shape & binding with MS Wire Coln 10 mm dia (All as per directed by site incharge) |
| 13 | Earth & filling in floor in layer with available earth, every layer 15 cm thick & ramming with water etc complete (All as per directed by site incharge) |
| 14 | Providing & Laying, Hard core of stone aggravated not exceeding 100 mm, deposited watered & rammed to a true surface. (All as per directed by site incharge) |
| 15 | Providing & laying PCC (1:2:4) ty B1 as in floor 75 mm thick without finish(All as per directed by site incharge) |
| 16 | Providing & laying in position plaster 15 mm thick in Cm (1:4) in Primer wall (All as per directed by site incharge) |
| 17 | Plastering 15 mm thick in cm (1:4) on external wall (All as per directed by site incharge) |
| 18 | Plastering 15 mm thick in cm (1:4) on plinth & finish with floating cut of neat cement (All as per directed by site incharge) |
| 19 | Providing & laying color ceramic tiles 30x30cmx7mm thick on floor over screed 20mm thick in CM(1;4), pointed with color pigment (All as per directed by site incharge) |
| 20 | Providing & applying color glazed ceramic tiles on wall over screed bed 20 mm on walls & pointed with color pigment (tiles size 30 x 20cm nx 6 mm thick) (All as per directed by site incharge) |
| 21 | Hard work 2nd Class for frame work in Roof, rafter & Purlin Frame Work 3”x3” (All as per directed by site incharge) |
| 22 | Providing & fixing CGI Sheet 0.50 mm thick on roof & fixed with over lap it 1 ½& fixed with coach screw & washer& color at joint 1 mtr with 02 coat of synthetic ennemal paint over red oxide (All as per directed by site incharge) |
| 23 | Providing & fixing white vitreous WC Indian type size 580 MM (All as per directed by site incharge) |
| 24 | Providing & Fixing urinal pot with waste pipe & Stop Cock (All as per directed by site incharge) |
| 25 | Providing & fixing WHB, white vitrous china sizemm flat back with cooupline, waste pipe & pillar tap, connection pipe & angle stop cock (All as per directed by site incharge) |
| 26 | Providing & fixing PVC door with choukhat, handles & hinge(All as per directed by site incharge) |
| 27 | Providing & applying 02 coat of oil bend distemper over coat of priming coat of wall (All as per directed by site incharge) |
| 28 | Providing & applying 02 coat of external cement bend paint on wall (All as per directed by site incharge) |
| 29 | Providing & fixing PCC Zallie 30 mm thick for V (All as per directed by site incharge) |
| 30 | Providing & laying G.I. Pipe med grade 15 mm dip in all fittings (All as per directed by site incharge) |
| 31 | Providing & laying G.I. Pipe15 mm dia (All as per directed by site incharge) |
| 32 | Providing & fixing 1000 ltr capacity PVC water storage length (Make – sintex) over a staying of (RCC) 1.5 mtr height (All as per directed by site incharge) |
| 33 | Providing & fixing bib cock (brass) 15 mm(All as per directed by site incharge) |