Tender For Monitoring, Evaluation And Preparation Of Environment Status Report For The Period Of One Years.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
15 Oct 2024
0 days left
EMD
90000
Bank guarantee accepted
Document Fee
6372
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kalyan → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Monitoring, Evaluation And Preparation Of Environment Status Report For The Period Of One Years.
BOQ
| Sl. No. | Item Description |
| 1 | Measuring Air pollution to assess air quality: |
| 2 | PM 2.5 each quotation at 7 location per month i.e. 8 months X 7 locations = 56 sample |
| 3 | PM 10 once a month at 7 locations forper monthi.e.8 months X 7 locations = 56 sample |
| 4 | Metrological data on daily basis continuously for 24 hrs.for the six no.of parametersi) wind speed ii) wind direction with wind rose.iii) Rain fall iv) Humidity v ) Temperature For 12 months. |
| 5 | Measuring sound level on each scheduled location has to be monitored continuously for 24 hrs. Specification in Residential, Commercial and Industrial Zone of Kalyan Dombivli Municipal Zone |
| 6 | 7 Locations for per month9 month X 7 location = 63 Readings. |
| 7 | 16 Silence zone three times in a year / quarterly. i.e. 16 location X 3 = 48 Readings |
| 8 | Ganesh Festival and Diwali Festival. a) Ganesh Festival (Kalyan 03 Location + Dombivli 03 Location ) X 3 Days =18 Readings |
| 9 | Diwali Festival kalyan 03 Location + Dombivli 03 Location ) X 3 Days =18 Readings |
| 10 | Collection and Testing of Water, Sewage, Industrial waste, Nalla Effluent each sample for parameters as mentioned in detailed specification for chemical bacterial, microbiological test including labour and material etc. Complete. Including submission report 15 samlpes / 10 wards committee per month .Seven ward committee45 ESR,7GSR, 10 lakes, 2 River.2 Creeks 10 ward committees and 122 wards. |
| 11 | Underground water samples ( Open well and Bore well ) Under ground water sample to be taken in Three times in year /each season(Kalyan – 6 + Dombivli 6 ) = 12 NospH, S.S,BOD, COD, Alkalinity, Total D.S., Hardness, Ammonia, Nitrate, Total solid, Inorganic Phosphate, Total phosphate, Heavy metal Analysis-Cu,pb,Zn, Cd, Cr,BOD, COD Microbiological Analysis-MPN, F-Coli, E-Coli. 12 sample X 3 Times in year =36 Sample. |
| 12 | Tap water sample. (Kalyan – 10 + Dombivli 10)Tap water. Samples to be taken in each quarter /each season.20 Sample X 3 times in year =60 Sample. |
| 13 | Waste water sampleSullage inffluent of 3 nos of Nallas per month.03 X 08 Months = 24 Samples.(In Pre and post monsoon) |
| 14 | 2 Nos. of River of River water testing Samples to be taken in each quarter / each season. 2 River sample X 3 Times in a year = 6 Samples. |
| 15 | 2 Nos. of Creek water testing Samples to be taken in each quarter / each season. 2 Crek sample X 3 Times in a year = 6 Samples. |
| 16 | 9 No. STp testing sample of outlet chembar to be teken in every month. I.e. 9 STP X 9 months (for one year) |
| 17 | 9 No. STp testing sample of outlet chembar to be teken in every month. I.e. 9 STP X 9 months (for one year) |
| 18 | Soil testing Sample to be taken in each quarter /each season. S.S, BOD,COD,Alkalinity,Total D.S.Hardness,Ammonia,,Nitrate,Total solid,Inorganic Phosphate,Total phosphate,Heavy metal Analysis-Cu,pb,Zn,Cd, Cr,BOD, COD Microbiological Analysis -MPN,F-Coli,E-Coli. 6 Location X 2 Times in year =12 Sample. |
| 19 | Preaperation of Environmental status report by June end with all available data and observation done by the agency. Agency should survey all the sensetive area and preapered the report as per the MoEF guide lines including all suggestion ,Remidies to improve the Air Quality Index, (AQI), Water pollution ,Noise pollution including submission of 150 nos. of copies per year in Marathi. And 25 no. of copies in english (Total no. of copies 150 + 25 = 175) |
AI Tender Summary
Tender Timeline
Oct 01, 2024
11:30 IST
Tender Published
Tender notice published.
CompletedOct 15, 2024
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedOct 16, 2024
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender