| 1 | GIS SURVEY |
| 2 | ERECTION OF 9 MTRS SINGLE POLE COMPLETE WITH ALL FITTINGS i.e, V- BRACKET, TOP ADAPTOR ETC. AND FOUNDATION BUT WITHOUT ANY INSULATOR FOR HV OH LINE UPTO 33 KV WITH PAINTING |
| 3 | ERECTION OF 9 MTRS DOUBLE POLE STRUCTURE COMPLETE WITH ALL FITTINGS AND FOUNDATION BUT WITHOUT ANY INSULATOR FOR HV OH LINE UPTO 33 KV WITH PAINTING |
| 4 | ERECTION OF 8 MTRS SINGLE POLE COMPLETE WITH ALL FITTINGS i.e, V- BRACKET, TOP ADAPTOR ETC. AND FOUNDATION BUT WITHOUT ANY INSULATOR FOR HV OH LINE UPTO 33 KV WITH PAINTING |
| 5 | ERECTION OF 9 MTRS SUB-STATION STRUCTURE COMPLETE WITH ALL FITTINGS ie. FITTINGS FOR ISOLATOR. FUSE UNIT, TRANSFORMER, KIOSK, MS HOOD, TOP CHANNELON ETC. AND FOUNDATION BUT WITHOUT INSULATOR WITH PAINTING |
| 6 | EXTENSION OF 9 MTRS SINGLE POLE COMPLETE WITH ALL FITTINGS UPTO 3 MTR. LENGTH BUT WITHOUT INSULATOR FOR HV OH LINE UPTO 33 KV WITH PAINTING |
| 7 | EARTHING COMPLETE WITH DRIVING OF EARTH SPIKE & CONNECTION OF EARTH ELECTRODE WITH NON CURRENT CARRIN METALIC PARTS OF SUPPORTS. STAY WIRE, CRADLE GUARDS, L.A. ETC. |
| 8 | STAY SET COMPLETE WITH ALL FITTINGS, GUY INSULATOR BINDING ETC.(HT STAY SET (1830X20 mini)) |
| 9 | STAY SET COMPLETE WITH ALL FITTINGS, GUY INSULATOR BINDING ETC.(LT STAY SET (1630 X 10 mm)) |
| 10 | FIXING OF 11 KV PIN INSULATOR WITH PIN |
| 11 | FIXING OF 11 KV DISC INSULATOR WITH STRAIN HARDWARE |
| 12 | FIXING OFLT SHACKLE INSULATOR WITH 1 NO. G.I NUTS & BOLTS |
| 13 | ERECTION OF 25 KVA 11/0.43 KV DISTRIBUTION TRANSFORMER COMPLETE WITH ALL FITTINGS (O/D TYPE) |
| 14 | FIXING OF 11 KV T.P.G.O. ISOLATOR ON SUB-STATION STRUCTURE WITH PROPER ADJUSTMENT |
| 15 | FIXING OF 11 KV LIGHTNING ARRESTER ON STRUCTURE (1 SET OF 3 L.A.S) |
| 16 | NEUTRAL EARTHING WITH SUPPLY OF NECESSARY MATERIALS AS PER WBSEDCL NORMS |
| 17 | FIXING OF KIOSK AND MAIN SWITCH AND COMPLETE CONNECTION WITH PVC CABLE FOR DOUBLE CIRCKET |
| 18 | FIXING OF SOLID TEE OFF BRACKET WITHOUT INSULATOR SINGLE POLE |
| 19 | FIXING OF SOLID TEE OFF BRACKET WITHOUT INSULATOR DOUBLE POLE |
| 20 | FABRICATION & FIXING OF CRADLE GUARD BRACKET FOR SINGLE POLE |
| 21 | LEAD WIRE (a) UPTO 30 MTRS.(2 WIRE) |
| 22 | DO (b) ABOVE 30 MTR. BUT UPTO 60 MTR.(2 WIRE) |
| 23 | MAKING & FIXING OF CROSS LESSING WIRE |
| 24 | ERECTION OF 3 WIRE 50 Sq. mm. ACSR \"RABIT\" OR EQI. SIZE OF AAAC CONDUCTOR INCLUDING LAYING, HOISTING, STRINGING, JOINTING, SAGGING, TENSIONING & ROUTE CLEARANCE |
| 25 | 3 PHASE SERVICE CONNECTION WITH SUPPLY OF ALL MATERIALS, 16 SQMM PVC CABLE 1.1 KV GRADE, EARTHING COMPLETE ETC. |
| 26 | GIS Survey of H.T (11KV)cable route as per instruction of site Engineer and submission of route survey drawing (in two copies ) inscribing different land marks. |
| 27 | Excavation of soil by cutting of Metalled Road/Cement Concrete/Brick Soling etc & re- instatement of the same as per instruction of Site Engineer |
| 28 | G.I Pipe 100mm dia.(Medium) |
| 29 | SUPPLYKILIN BERNT PROPER SIZE 1ST CLASS BRICK |
| 30 | LAYING OF BRICKS |
| 31 | Laying & dressing of following 11 KV 185 SQMM XLPE cable in the excavated cable trenches as per drawing no.PLN(D)/SS/104, dt. 05.05.2015 and instruction of the Site Engineer. |
| 32 | Supply & Erection of Cast Iron Cable Marker on concrete foundation blocks for straight run, road crossing, joint location etc as per drawing no..PLN(D)/SS/107 or 108, dt. 05.05.2015 & specification & direction of Site Engineer. |
| 33 | Making protective duct for cable joint complete as per WBSEDCLs approved drawing (Ref. Drg. no.PLN(D)/SS/106, dt. 05.05.2015) |
| 34 | Laying of HDPE pipe as per Jack push method as per instruction of Site Engineer and as per site condition for laying of U.G cable including supply of With 110mm diam. HDPE Pipe, PE-80 , PN-6 as per IS: 4984-1995 |