Installation Of Required Instruments For The Safety Of Joshiyara Barrage Mb-Ii,Uttarkashi
Tender Overview
Project Description
Installation Of Required Instruments For The Safety Of Joshiyara Barrage Mb-Ii,Uttarkashi-Vibrating wire joint meter 2 Tilt meter (bi-axial) 3 Datalogger for Tilt Meters 4 Temperature sensor 5 V notch mechanical type (Small) 6 V notch (MS) Big 7 Vibrating wire uplift pressure measurement 8 Network accessories with necessary cables for connecting instruments to the display Unit & to the internent for uploading the data 9 Automatic data logger for collecting data from all the installed instruments with necessary cables and softwares to display the same in the display unit 10 Supply & Installation and commissioning of seismological equipment strong motion accelerograph 11 Cost of service for Integration, Commissioning Trail run performance ofentire system as per technical Specification (including in list of goods which are required for satisfactory installation and commissioning of the system as par standards, cost of all civil and electrical works, lightening protection, labour,material T&P are necessary cables switches cum junction Boxes to connect instruments with data logger and display unit, incidentals etc) as per direction of E/I required for proper completion of the work 12 Data analysis & interpretation & submission of monthly report for 1 year 13 Cost of service for Training of Purchasers Personnel for opreation and maintenance of all equipments before installation & commissioning as per technical Specification & as per direction of E/I including all cost of Labour, Material T&P etc required for proper completion of work, including boarding and lodging of the perchasess personnel. 14 Cost of service for Comprehensive Warranty and Annual Maintenance & Opreation services including spares as per technical Specification during1 year of Warranty and Annual Maintenance Servicess as per technical Specification& as per direction of E/I including all cost of Labour, Material T&P etc required for proper completion of work 15 Desktop computer (all in one) (minimum core 15, 6th generation processor)Hp /Dell or equivaient to use it as a display unit along with necessary cabinet as per direction of E/I including all cost of labour, T&P and material for proper completion of work. 16 Hp laserjet (printer) MFP M132 NW or equivalent as per direction ofE/I including all cost of labour, T&P and material for proper completion of work. 17 U.P.S. 1.5 KVA as per direction of E/I including all cost of labour, T&P and material for proper completion of work.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 14-Oct-2024 | Date Extension-I | Date | 22-Oct-2024 |
BOQ
| Sl. No. | Item Description |
| 1 | Vibrating wire joint meter |
| 2 | Tilt meter (bi-axial) |
| 3 | Datalogger for Tilt Meters |
| 4 | Temperature sensor |
| 5 | V notch mechanical type (Small) |
| 6 | V notch (MS) Big |
| 7 | Vibrating wire uplift pressure measurement |
| 8 | Network accessories with necessary cables for connecting instruments to the display Unit & to the internent for uploading the data |
| 9 | Automatic data logger for collecting data from all the installed instruments with necessary cables and softwares to display the same in the display unit |
| 10 | Supply & Installation and commissioning of seismological equipment strong motion accelerograph |
| 11 | Cost of service for Integration, Commissioning Trail run performance ofentire system as per technical Specification (including in list of goods which are required for satisfactory installation and commissioning of the system as par standards, cost of all civil and electrical works, lightening protection, labour,material T&P are necessary cables switches cum junction Boxes to connect instruments with data logger and display unit, incidentals etc) as per direction of E/I required for proper completion of the work |
| 12 | Data analysis & interpretation & submission of monthly report for 1 year |
| 13 | Cost of service for Training of Purchaser\"s Personnel for opreation and maintenance of all equipments before installation & commissioning as per technical Specification & as per direction of E/I including all cost of Labour, Material T&P etc required for proper completion of work, including boarding and lodging of the perchases\"s personnel. |
| 14 | Cost of service for Comprehensive Warranty and Annual Maintenance & Opreation services including spares as per technical Specification during1 year of Warranty and Annual Maintenance Servicess as per technical Specification& as per direction of E/I including all cost of Labour, Material T&P etc required for proper completion of work |
| 15 | Desktop computer (all in one) (minimum core 15, 6th generation processor)Hp /Dell or equivaient to use it as a display unit along with necessary cabinet as per direction of E/I including all cost of labour, T&P and material for proper completion of work. |
| 16 | Hp laserjet (printer) MFP M132 NW or equivalent as per direction ofE/I including all cost of labour, T&P and material for proper completion of work. |
| 17 | U.P.S. 1.5 KVA as per direction of E/I including all cost of labour, T&P and material for proper completion of work. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender