Mtf Area Cleaning Works In Cpcl Manali Refinery , Ok , Clearing Jungle Including Uprooting The Area Of Grass, Rank Vegetation, Wild Growth, Brush Wood, Trees And Saplings Up To 30 Cm Girth Measured At A Height Of 1 M Above The Groundl Level Along Road Side Berms / Drains, Under Pipelines / Structures, Tank Farms, Yards Etc.. Clearing Jungle Shall Be Carried Out Either Manually With Necessary Tools & Tackles Or By Mechanical Means Using Mini Excavator / Diggers (As Per Site Condition & Advice Of Eic) For Removal Of Grass, Plants Etc. By Scraping Completely From Existing Ground And Making The Ground To Proper Required Level. Scrapped / Removed Vegetations, Trees, Saplings Shall Be Bundled Into Heaps And Disposed Outside The Refinery Premises At Designated Places In Cpcl Ammullaivoyal Land Upto A Distance Of 7Km As Directed By Eic With Contractors Own Transport, All Tools, Tackles, Labour Etc. All Complete As Directed By The Engineer-In-Charge. , Clearing Jungle Using Petrol / Diesel Operated Brush Cuttermachines Including The Area Of Grass, Rank Vegetation, Wild Growth, Brush Wood, Trees And Saplings Up To 30 Cm Girth Measured At A Height Of 1 M Above The Groundl Level And Excluding Uprooting Along Road Side Berms / Drains, Under Pipelines / Structures, Tank Farms, Yards Etc. Clearing Jungle Shall Be Carried Outusing Brush Cutting Machines (As Per Site Condition & Advice Of Eic) For Removal Of Grass, Plants Etc. And Scraping Cut Grass, Vegetations, Trees Completely From Existing Ground And Making The Ground To Proper Required Level. Scrapped / Removed Vegetations, Trees, Saplings Shall Be Bundled Into Heaps And Disposed Outside The Refinery Premises At Designated Places In Cpcl Ammullaivoyal Land Upto A Distance Of 7Km As Directed By Eic With Contractors Own Transport, All Tools, Tackles, Labour Etc. All Complete As Directed By The Engineer-In-Charge. , Removing Oil Sludge / Muck /Oil Mixed Earth In Tank Farms And Other Surrounding Areasby Surface Excavation Not Exceeding 30Cm In Depth And Any Mechanized Removal Of Floating Oil/Spilled Asphalt/Lube Oil/Oil Sludge/Muck At Any Loaction As Directed By Eic And Disposal Of The Same In Sludge Pits / Bio-Remediation Sites At Etp-Ii Area/Amullaivoyal Area; With All Lifts And Maximum Radial Lead Of 7 Km Complete Including All Loading, Unloading, Transportation And Removing Oil Spillage During Transporting By Spreading M Sand, Scraping The Area All As Directed With All Labour, Tools, Tackles, Transport Supervision, Safety Permits, Safety Precaution Etc. As Per Direction Of The Engineer-In-Charge. (8.7% Of Volume Will Be Deducted Towards Voids) , Removal Of Oil /Asphalt Spillage From Paved Area By Sprinkling Fine Aggregate (M Sand) On The Area Of Oil Spill, Removing And Disposing The Oily Earth To Sludge Lagoon/Bio-Remediation Pit Situated In Etp-Ii, Including The Labour, Tools, Tackles,Cost Of Fine Aggregate (M Sand),Etc. All Complete. , Hiring Of Machineries On Demand Basis. The Quoted Rate Is Inclusive Of Charges Towards Mobilization If Any, Hire Charges, Consumables, Fuel / Oils / Lubricants, Operator Crews Costs, Supervision, Overhead & Profit, Safety Permits, Safety Precautions, Etc. Complete. , For Wheeled Back Hoe Loader With Backfill Blade Attachment (Jcb) , For Tractor With Trolley Of Minimum 3 Cum Capacity , For Mini Excavator / Bobcat , Supply Of Gully Sucker Trucks On Hire Basis With Inbuilt Vacuum Suction Using Super Suction Machine And Tanker Of Minimum 6 Kl Capacity With Necessary Suction / Delivery Hoses Of Sufficient Lengths (Upto 200 M) And 2Nos. Personnel In Addition To A Driver And Cleaner Tohandle The Floating Oil/Other Material As Instructed By Eic. The Quoted Rate Is Inclusive Of Charges Towards Fuel/Oils/Lubricants, Operator Crews Costs, Mobilization Etc. Complete. => Limited