| 1 | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removingtheexcavatedmaterialuptoadistanceof50m.beyondthebuildingareaand stackingandspreadingasdirected,dewatering,preparingthebedforthefoundationand necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means |
| 3 | Providingsoling using80mm sizetrapmetalin15cm.layerincludingfilling voidswith Crushed sand/grit, ramming, watering etc. complete. |
| 4 | ProvidingandlayingCastinsitu/ReadyMixcementconcreteinM-10oftrap/granite/ quartzite/gneissmetalforfoundationandbeddingincludingbailingoutwater,Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided,finishingifrequiredandcuringcomplete,withfullyautomaticmicroprocessor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete.With fine aggregate (Crushed sand VSI Grade) |
| 5 | Providing and laying in situ /Ready Mixcement concreteM-20of trap / granite /quartzite/ gneiss metalforR.C.C.work infoundationslikeraft,stripfoundations,grillageand footingsofR.C.C.columnsandsteelstanchions etc.includingbailingoutwater, Steel centeringformwork,laying/pumpingcoverblocks,compactionandcuring roughening the surface if special finish is to be provided (Excluding reinforcement and structural steel) etc. complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) |
| 6 | Providing cast in situ / ready mix M20 grade cement concrete for head walls of CD work / retaining walls etc. including necessary form work, compaction, finishing and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer)with SCADA |
| 7 | Providing fly ash brick masonry with conventional / I.S. type fly ash bricksin C.M. 1:6 in foundation and plinth includingbailing out water manually striking joints, racking out joints watering and scaffolding etc. complete. |
| 8 | Providing internal cement plaster 20mm thick inSingle coats in cement mortar 1:5without neeru finish, to concrete, brick surface, in all positions including scaffolding and curing etc. complete |
| 9 | Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters forR.C.C.pilecaps,footings,foundations,slabs,beamscolumns,canopies,staircase,newels, chajjas,lintelspardis,copings,fins,archesetc.asperdetaileddesigns,drawingsand schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. |
| 10 | Providing and laying weep holes of 100 mm diameter PVC pipes as per drawing for abutment returns, return walls etc. Complete. |
| 11 | Providing , laying and fixing ,jointingEco- drain 160 mm SN 4 Nu- Drain Upvc pipes or of equivalent make, manufacture as per EN 13476 or equivalent as per I.S.15328 with fittings such abends,tees,coupler,etc,jointingwith rubberlubricantincludingnecessary excavation, trench refilling with selective excavated materialetc. complete. |
| 12 | ProvidingandconstructingBrickMasonryInspectionChamber60cmx45cmx90cm including1:4:8cementconcretefoundation1:2:4cementconcretechannelshalfroundG.S.W. pipes, Brick Masonry, plastering from inside and with frame fixed in cement concrete with R.C.C. Cover medium duty 140Kilogramwith frame etc complete. |
| 13 | Providing and fixing reinforced cement concrete cover of size 60 cm x 45 cm with frame over inspection chamber etc. complete. Heavy duty (160 Kilogram) |
| 14 | Trimming of grass, shurbs and weeds from the shoulders/berms and disposing off the same to suitable locations etc. complete |
| 15 | Labourchargesforremovinggrass,thorneyshrubs,Junglishrub,Kubabulandalikegrass along roadside making the ground clean by showel and phavaras etc. complete. |
| 16 | Removinggrass,gazergrassanddisposingoffoutofbuildingpremisesincludingmaking clean the ground by shovel and phavaras etc. complete. |
| 17 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 450mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. |
| 18 | Providing, laying andfixing exterior grade fibrilling fibre reinforcement heavy duty designer cementconcrete tilesforFlooring ofapprovedcolour anddesign 22+/ -2mm thickbayer colourpigmentedasperIS..1237-1980havingcompressivestrengthmorethan500 Kilogram/sq.cmreaffirmedin2006,havingwerttransvrsestrenghthof3.5/mm2,water absorption less than 10 % abrasion / wear resistance less than 2 mm ,skid resistance more than 25.0 (ASTM:E303) and no fading as per DIN - 51094 of size 300 x 300in plan / designed pattern on a bed of 1:4 cement mortar including cement float ,filling joints with neat cement slurry ,curing, polishing and cleaning etc. complete. For flooring. |
| 19 | Transportation of material obtained from debris of various sorts excavated stuff including necessary excavation/ loosing including loading, unloading and conveying and disposing as directed.( Beyond 10 Km. ) |
| 20 | Carrying out testing of cement including necessary material & testing charges etc. complete.Standard Consistancy, Fineness, Specific Gravity, Setting Time ( Initial & Final ), Compressive Strength, Soundness. |
| 21 | Carrying out testing of Sand including necessary material & testing charges etc. complete.Fineness Modulus. |
| 22 | Carrying out testing of reinforcement / steel (Tensile strength, %, Elongation, Yield Stress,Weight-Per Meter, Bend / Rebend Test, Proof Stress.) |
| 23 | Carrying out testing of CONCRETE Compressive Strength OF C.C. Cube (Set of 3 cubes). |
| 24 | Carrying out testing of Bricks [ Water Absorption (Set of 5 Bricks), Compressive Strength( Set of 5 Bricks), Efflorescence (Set of 5 Bricks) ]including necessary material & testing charges etc. complete. |
| 25 | Providing royalty charges against royalty paid by the contractor to the Revenue department for supply of different construction material for which royalty is necessary.a. For Sand |