| 1 | Comprehensive maintenance including renewal/replacement of defective parts of electrically operated1x1lift =01 lifts (OTIS Make) each of 08 passengers capacity with selective controls catering for four floors including ground floor, installed at MMG Building in Tehnical\"A\" Area at IRDE Dehradun complete all as specified and directed including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates complete, all as specified and directed.Note:- (i) Contractor liaise with lift OEM and visit the site with OEM company authorised representative to check the compelet lift to identify the performance of lift, comprehensive safety inspection including load testing, emergency stop functionality and other critical safety checks.(ii) After checking, If any repair maintenance will required in the lift then contractor should done the repaire maintenance the lift through OEM in complete prospective and specification. (ii) After necessary repair contractor signed the MoU with lift OEM for eleven month comprehensive maintenance and submit the ink sign copy to the Engr-in-charge within 15 days of aceptance of tender.(iv) Safety parameter and smooth functioning of lift should be checked by the lift OEM as per MoU in each month and report submitted to Engr-in-charge. |
| 2 | Comprehensive maintenance including renewal/replacement of defective parts of electrically operated1x1lifts =01 lifts (OTIS Make) each of 08 passengers capacity with selective controls catering for three floors including ground floor, installed at 36 M tower in Tehnical \"B\"Area at IRDE Dehradun complete all as specified and directed including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates complete, all as specified and directed.Note:- (i) Contractor liaise with lift OEM and visit the site with OEM company authorised representative to check the compelet lift to identify the performance of lift, comprehensive safety inspection including load testing, emergency stop functionality and other critical safety checks.(ii) After checking, If any repair maintenance will required in the lift then contractor should done the repaire maintenance the lift through OEM in complete prospective and specification. (ii) After necessary repair contractor signed the MoU with lift OEM for eleven month comprehensive maintenance and submit the ink sign copy to the Engr-in-charge within 15 days of aceptance of tender.(iv) Safety parameter and smooth functioning of lift should be checked by the lift OEM as per MoU in each month and report submitted to Engr-in-charge. |
| 3 | Comprehensive maintenance including renewal/replacement of defective parts of electrically operated 1xlifts (OTIS make) each of 6 passengers capacity with selective controls catering for three floors including ground floor, installed at Photonics Building Technical \"A\" area at IRDE Dehradun complete all as specified and directed, including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates complete, all as specified and directed.Note:- (i) Contractor liaise with lift OEM and visit the site with OEM company authorised representative to check the compelet lift to identify the performance of lift, comprehensive safety inspection including load testing, emergency stop functionality and other critical safety checks.(ii) After checking, If any repair maintenance will required in the lift then contractor should done the repaire maintenance the lift through OEM in complete prospective and specification. (ii) After necessary repair contractor signed the MoU with lift OEM for eleven month comprehensive maintenance and submit the ink sign copy to the Engr-in-charge within 15 days of aceptance of tender.(iv) Safety parameter and smooth functioning of lift should be checked by the lift OEM as per MoU in each month and report submitted to Engr-in-charge. |
| 4 | Comprehensive maintenance including renewal/replacement of defective parts of electrically operated 1x1Feright Elevator=01 Feright Elevator(OTIS Make) each of 2000 Kgscapacity with selective controls catering for four floors including ground floor, installed at MMG Building Tehnical\"A\" Area at IRDE Dehradun complete all as specified and directed including any other spare parts required other than mentioned under Ser item 10 to 37 belowshall to be deemed included in quoted rates complete, all as specified and directed.Note:- (i) Contractor liaise with lift OEM and visit the site with OEM company authorised representative to check the compelet lift to identify the performance of lift, comprehensive safety inspection including load testing, emergency stop functionality and other critical safety checks.(ii) After checking, If any repair maintenance will required in the lift then contractor should done the repaire maintenance the lift through OEM in complete prospective and specification. (ii) After necessary repair contractor signed the MoU with lift OEM for eleven month comprehensive maintenance and submit the ink sign copy to the Engr-in-charge within 15 days of aceptance of tender.(iv) Safety parameter and smooth functioning of lift should be checked by the lift OEM as per MoU in each month and report submitted to Engr-in-charge. |
| 5 | Comprehensive maintenance including renewal/replacement of defective parts of electrically operated 1xFeright Elevator=01 Feright Elevator (OTIS Make) each of 2000 Kgscapacity with selective controls catering for three floors including ground floor, installed at Photonic Building in Tehnical \"A\"Area at IRDE Dehradun complete all as specified and directed including any other spare parts required other than mentioned under ser item 10 to 37 below shall to be deemed included in quoted rates complete, all as specified and directed.Note:- (i) Contractor liaise with lift OEM and visit the site with OEM company authorised representative to check the compelet lift to identify the performance of lift, comprehensive safety inspection including load testing, emergency stop functionality and other critical safety checks.(ii) After checking, If any repair maintenance will required in the lift then contractor should done the repaire maintenance the lift through OEM in complete prospective and specification. (ii) After necessary repair contractor signed the MoU with lift OEM for eleven month comprehensive maintenance and submit the ink sign copy to the Engr-in-charge within 15 days of aceptance of tender.(iv) Safety parameter and smooth functioning of lift should be checked by the lift OEM as per MoU in each month and report submitted to Engr-in-charge. |
| 6 | Comprehensive maintenance including renewal/replacement of defective parts of electrically operated1x1Feright Elevator=01 Feright Elevator(OTIS Make) each of 2000 Kgscapacity with selective controls catering for two floors including ground floor, installed at Optics Building Technical \"B\" area at IRDE Dehradun complete all as specified and directed, including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates complete, all as specified and directed.Note:- (i) Contractor liaise with lift OEM and visit the site with OEM company authorised representative to check the compelet lift to identify the performance of lift, comprehensive safety inspection including load testing, emergency stop functionality and other critical safety checks.(ii) After checking, If any repair maintenance will required in the lift then contractor should done the repaire maintenance the lift through OEM in complete prospective and specification. (ii) After necessary repair contractor signed the MoU with lift OEM for eleven month comprehensive maintenance and submit the ink sign copy to the Engr-in-charge within 15 days of aceptance of tender.(iv) Safety parameter and smooth functioning of lift should be checked by the lift OEM as per MoU in each month and report submitted to Engr-in-charge. |
| 7 | Comprehensive maintenance including renewal/replacement of defective parts of electrically operated1x1=1lifts with manufacturing year 2018, (Make- TKE) of 13 passengers capacity with selective controls catering for six floors including ground floor, installed at EOL Building Technical area \"B\" at IRDE Dehradun complete all as specified and directed, including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates complete, all as specified and directed.Note:- (i) Contractor liaise with lift OEM and visit the site with OEM company authorised representative to check the compelet lift to identify the performance of lift, comprehensive safety inspection including load testing, emergency stop functionality and other critical safety checks.(ii) After checking, If any repair maintenance will required in the lift then contractor should done the repaire maintenance the lift through OEM in complete prospective and specification. (ii) After necessary repair contractor signed the MoU with lift OEM for eleven month comprehensive maintenance and submit the ink sign copy to the Engr-in-charge within 15 days of aceptance of tender.(iv) Safety parameter and smooth functioning of lift should be checked by the lift OEM as per MoU in each month and report submitted to Engr-in-charge. |
| 8 | Comprehensive maintenance including renewal/replacement of defective parts of electrically operated1x1= 01 lifts with Manufacturing year 2002 (ECE Make) each of 08 passengers capacity with selective controls catering for six floors including ground floor, installed at E-5 Bilding Residential Area at IRDE Dehradun complete all as specified and directedincluding any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates complete, all as specified and directed. |
| 9 | Comprehensive maintenance including renewal/replacement of defective parts of electrically operated 1x3=3lifts with manufacturing year 2002,(ECE make) each of 13 passengers capacity with selective controls catering for six floors including ground floor, installed at D-2,D-3 & C-15 Residential area at IRDE Dehradun complete all as specified and directed,including any other spare parts required other than mentioned under Ser item 10 to 37 below shall to be deemed included in quoted rates complete, all as specified and directed. |
| 10 | Supply only Power Contactor 10 to 25 Amps rating (make- LT/ TC/Schneider) suitable for lift complete all as specified and directed. |
| 11 | Supply only relay cards suitable for (OTIS make) lift complete all as specified and directed |
| 12 | Supplyonly in replacement of full length Infra Red Door sensor (make - TVS/Max)complete all as specified and directed |
| 13 | Supplyonly main controller card for OTIS make lift complete all as specified and directed |
| 14 | Supplyonly SMPS power supply (make- Delta/MAX) for OTIS make lift complete all as specified and directed |
| 15 | Supplyonly floor indicator 7 segment 12/24 Volt DC (make- MAX or equivalent) for OTIS make lift complete all as specified and directed |
| 16 | Supplyonly limit switch (make- TVS/MAX ) for OTIS make lift complete all as specified and directed |
| 17 | Supplyonly Reed switch (make- TVS/MAX ) for OTIS make lift complete all as specified and directed |
| 18 | Supplyonly stop switch (make- TVS/MAX ) for OTIS make lift complete all as specified and directed |
| 19 | Supplyonly Emergency alarm for OTISmake lift complete all as specified and directed |
| 20 | Supplyonly travelling cable12 core (0.50 sqmm) for OTIS make lift complete all as specified and directed |
| 21 | Supplyonly main rope(13mm) make Usha martinfor OTIS make lift complete all as specified and directed |
| 22 | Supplyonly door drive (make- Yaskawa/Fuji)for OTIS make lift complete all as specified and directed |
| 23 | Supply & fixing of electronic drive in elevator control panel (Main VVVF drive) relevant for 15 HP electric motor complete with key board built in or detachable for proper control & command inputs and proper analysis of errors & trouble shooting by an engineer for proper functioning of OTIS/Kone /Thaison/ECE/Jhonson Make lift complete all as sprcified and directed. |
| 24 | Supply only ARD with battery suitable for OTIS/Kone /Thaison/ECE/Jhonson lift complete all as specified and directed. |
| 25 | Supply only ARD instruction plate assembly with nut bolt and hardware complete all as specified and directed. |
| 26 | Supplyonly door shoe suitable for OTIS make lift complete all as specified and directed |
| 27 | Supplyonly door safety lock for OTIS make lift complete all as specified and directed |
| 28 | Supplyonly thimble for OTIS/ECE/KONE/Thaison make lift complete all as specified and directed |
| 29 | Supplyonly landing operating panel (LOP) for OTIS make lift complete all as specified and directed |
| 30 | Supplyonly car operating panel (COP) for OTIS make lift complete all as specified and directed |
| 31 | Supplyonly serial card for OTIS make lift complete all as specified and directed |
| 32 | Supplyonly door lock rollerfor OTIS make lift complete all as specified and directed |
| 33 | Supplyonly Lift fan suitable for OTIS make lift complete all as specified and directed |
| 34 | Supplyonly Alaramsuitable for OTIS make lift complete all as specified and directed |
| 35 | Supply only battery 7.5 AH suitable for OTIS make lift complete all as specified and directed |
| 36 | Supply only break linner suitable for OTIS make lift complete all as specified and directed |
| 37 | Supply only door lock suiable for OTIS make lift complete all as specified and directed |